Description
-
Model List:
- WA800-3LC Wheel Loader
- 1. MAIN MENU
- 2. COVER
- 3. TABLE OF CONTENTS
- 4. CHART OF SEPERATED UNITS
- 5. DIMENSIONS AND WEIGHTS OF SEPARATED UNITS
- 6. TRANSPORTATION BY LAND
- 6.1. SPECIFICATIONS
- 6.2. WHEN TRAVELING UNDER OWN POWER
- 6.3. TRANSPORTATION BY TRAILER
- 6.4. TRAILERS REQUIRED TO MOVE MACHINE
- 7. SERVICE REFILL CAPACITIES
- 8. ORDER, FACILITIES AND SCHEDULE FOR ASSEMBLY
- 9. WORK SPACE LAYOUT DIAGRAM
- 10. TOOLS AND EQUIPMENT REQUIRED
- 10.1. TOOLS REQUIRED
- 10.2. EQUIPMENT REQUIRED
- 10.3. LIFTING TOOLS REQUIRED
- 10.4. OIL, GREASE, FUEL, PAINT, ETC
- 10.5. PROTECTIVE WEAR
- 10.6. LOCAL MANUFACTURING DIAGRAM FOR TOOLS
- 11. PROCEDURE FOR FIELD ASSEMBLY
- 11.1. A1 SETTING BARE MACHINE ON SUPPORTS
- 11.1.1. Tools and Materials Required
- 11.1.2. STEEL STAND DRAWING
- 11.2. A2 ASSEMBLY OF REAR AXLE
- 11.2.1. OUTLINE
- 11.2.2. ASSEMBLY PROCEDURE
- 11.3. A3 ASSEMBLY OF FRONT AND REAR DRIVE SHAFTS
- 11.3.1. OUTLINE
- 11.3.2. ASSEMBLY PROCEDURE
- 11.4. A4 INSTALLATION OF FRONT AXLE
- 11.4.1. OUTLINE (INSTALLING FRONT AXLE)
- 11.4.2. ASSEMBLY PROCEDURE
- 11.4.3. OUTLINE (INSTALLING FRONT TIRE AND WHEEL ASSEMBLIES)
- 11.4.4. ASSEMBLY PROCEDURE (FRONT TIRE AND WHEEL ASSEMBLY)
- 11.5. A5 ASSEMBLY OF FUEL TANK
- 11.5.1. OUTLINE
- 11.5.2. OPERATION FOR CONNECTING FUEL SUCTION AND RETURN HOSES
- 11.5.3. OPERATION FOR SECURING ENGINE DRAIN LINES
- 11.5.4. OPERATION FOR SECURING FUEL TANK VENT LINE
- 11.5.5. ASSEMBLY PROCEDURE
- 11.6. A6 ASSEMBLY OF LADDER (LEFT/RIGHT)
- 11.7. A7 ASSEMBLY OF CAB
- 11.7.1. ASSEMBLY PROCEDURE
- 11.8. A8 ASSEMBLY OF HAND RAIL
- 11.9. A9 ASSEMBLY OF REAR TIRE AND WHEEL ASSEMBLIES
- 11.9.1. ASSEMBLY PROCEDURE (REAR TIRE AND WHEEL ASSEMBLY)
- 11.10. A10 ASSEMBLY OF BATTERY BOXES
- 11.10.1. PROCEDURE FOR CONNECTING AND SECURING WIRING INSIDE BATTERY BOX
- 11.10.2. CIRCUIT DIAGRAM
- 11.10.3. OPERATION FOR INSTALLING BATTERY BOX COVERS
- 11.10.4. ASSEMBLY OF STEP ASSEMBLIES
- 11.11. A11 ASSEMBLY OF COUNTERWEIGHT
- 11.11.1. OUTLINE
- 11.12. A12 ASSEMBLY OF EXHAUST PIPE
- 11.13. A13 ASSEMBLY OF HANDRAILS AND REAR ACCESS STEPS
- 11.13.1. ASSEMBLY OF HANDRAILS (RIGHT SIDE AND TOP OF HOOD)
- 11.13.2. ASSEMBLY OF REAR ACCESS STEP
- 11.13.3. ASSEMBLY OF HANDRAIL (LEFT SIDE) AND MUDGUARD COVER
- 11.13.4. ASSEMBLY OF SAFETY CABLE AND MIRRORS
- 11.14. A14 ASSEMBLY OF BOOM
- 11.14.1. BOOM ASSEMBLY
- 11.14.2. CONNECTION OF REMOTE GREASE TUBE
- 11.14.3. ASSEMBLY PROCEDURE
- 11.15. A15 ASSEMBLY OF FRONT FENDERS
- 11.16. A16 ASSEMBLY OF FRONT LAMP ASSEMBLIES
- 11.17. A17 ASSEMBLY OF ROPS CANOPY
- 11.17.1. Operation for removal and installation of ROPS canopy support cover
- 11.17.2. Operation for installing ROPS canopy and wiring.
- 11.17.3. ASSEMBLY PROCEDURE
- 11.18. A18 ASSEMBLY OF BUCKET
- 11.18.1. Operation for Installation of Bucket Link
- 11.18.2. ASSEMBLY PROCEDURE
- 11.19. A19 ASSEMBLY OF FLOOR MAT
- 12. PROCEDURE FOR TESTING ASSEMBLY
- 12.1. M1 BLEEDING AIR FROM WHEEL BRAKE CIRCUIT
- 12.1.1. BRAKE CITCUIT DIAGRAM
- 12.1.2. Procedure for filling with oil.
- 12.1.3. Bleeding Air From Brake Circuit
- 12.2. M2 GREASING WORK EQUIPMENT AND CHASSIS
- 12.2.1. OUTLINE
- 12.3. M3 ADJUSTING BUCKET POSITIONER
- 12.3.1. OUTLINE
- 12.4. M4 ADJUSTING BOOM KICKOUT
- 12.4.1. OUTLINE
- 12.5. M5 PROCEDURE FOR STARTING ENGINE
- 12.5.1. OUTLINE
- 12.5.2. LONG TERM STORAGE
- 12.6. M6 INSPECTION OF ALL PARTS
- 12.7. M7 PROCEDURE FOR BLEEDING AIR FROM PISTON PUMP
- 12.7.1. Procedure for bleeding air from piston pump.
- 12.8. M8 BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
- 12.8.1. Bleeding air from bucket and boom cylinders.
- 12.8.2. Bleeding air from PPC circuit.
- 13. INSPECTION REPORT
















There are no reviews yet.