Linde 115-12 – R14, R16, R20 Production site Xiamen Operating Instructions

$20.00

  • Type Of Manual: Operating Instructions
  • Format: PDF
  • Size: 27.6MB
  • Number of Pages: 307

Description

  • Model List:

    • R14
    • R16
    • R20
  • 1. Electric Reach TruckR14S, R16S, R20S
  • 1.1. Table of content
  • 1.2. Introduction
  • 1.2.1. Introduction
  • 1.2.2. General information
  • 1.2.3. Conformity marking
  • 1.2.4. Declaration that reflects the content of the declaration of conformity
  • 1.2.5. Factory nameplate
  • 1.2.6. Intended use of the trucks
  • 1.2.7. Additional information
  • 1.2.8. Hazard assessment
  • 1.2.9. Improper use
  • 1.2.10. Disposing of components and batteries
  • 1.2.11. Symbols used
  • 1.3. Safety
  • 1.3.1. Residual risks
  • 1.3.2. Stability
  • 1.3.3. In the case of tipover
  • 1.3.4. EMC Electromagnetic compatibility
  • 1.3.5. Operating company
  • 1.3.6. Drivers
  • 1.3.7. Competent person
  • 1.3.8. Regulations
  • 1.3.9. Handling consumables
  • 1.3.10. Fitting attachments
  • 1.4. Overview
  • 1.4.1. Display unit from C1X115V00808 to C2Y115M00647
  • 1.4.1.1. Multifunction indicator
  • 1.4.1.2. Speed menu
  • 1.4.1.3. Status menu
  • 1.4.1.4. Settings menu
  • 1.4.1.5. Fault menu
  • 1.4.1.6. Status bar
  • 1.5. Operation
  • 1.5.1. Using the RFID Keypad (optional)
  • 1.5.1.1. RFID Keypad installation position
  • 1.5.2. Picking up a load
  • 1.5.3. Handling loads
  • 1.5.4. Taking the truck out of operation
  • 1.5.5. Disposal of old trucks
  • 1.6. Maintenance
  • 1.6.1. Maintenance safety guidelines
  • 1.6.2. Covers and cowlings
  • 1.6.3. Fuses C2Y115M00648 and up
  • 1.6.3.1. Fuses
  • 1.6.4. Required checks and maintenance
  • 1.6.4.1. Check the battery electrolyte level and specific gravity
  • 1.6.4.2. Adjusting the length of the lifting chains and lubricating using chain spray
  • 1.6.5. Taking the truck out of operation
  • 1.6.6. Disposal of old trucks
  • 1.7. Technical datasheet
  • 1.7.1. Ecodesign requirements for electric motors and variable speed drives
  • 2. Electric reach truckR10CS.12CS.14CS11
  • 2.1. Table of content
  • 2.2. Introduction and general description
  • 2.2.1. Introduction
  • 2.2.2. Legal requirements for marketing
  • 2.2.3. General description
  • 2.3. Safety
  • 2.3.1. Operator safety guidelines
  • 2.3.2. Residual risks
  • 2.3.3. Stability
  • 2.3.4. In the event of tipover
  • 2.3.5. Noise emission levels
  • 2.3.6. Frequency characteristic for human body vibrations
  • 2.4. Getting to know the truck
  • 2.4.1. Location of identification plates and labels
  • 2.4.2. Truck type.capacity plate
  • 2.4.3. General view of truck
  • 2.4.4. Operating controls and indicators
  • 2.4.5. Operators display
  • 2.4.6. Definition of direction of travel
  • 2.5. Operation
  • 2.5.1. Runningin instructions
  • 2.5.2. Preshift checks
  • 2.5.3. The battery
  • 2.5.4. Operator adjustments
  • 2.5.5. Braking twin pedal
  • 2.5.6. Driving twin pedal
  • 2.5.7. Travelling on an incline
  • 2.5.8. Operating the mast and attachments (with two joystick control)
  • 2.5.9. Handling loads
  • 2.5.10. Before leaving the truck
  • 2.5.11. Operator code entry (Option)
  • 2.6. Maintenance
  • 2.6.1. Maintenance safety guidelines
  • 2.6.2. Report of Thorough Examination
  • 2.6.3. Covers and cowlings
  • 2.6.4. Fuses
  • 2.6.5. Emergency lower
  • 2.6.6. Emergency steering and parking brake release
  • 2.6.7. Slinging the truck
  • 2.6.8. Securing for transportation
  • 2.6.9. Jacking the truck
  • 2.6.10. Towing procedure
  • 2.6.11. Mast unit
  • 2.6.12. Recommended lubricants
  • 2.6.13. Inspection and maintenance data
  • 2.6.14. Inspection and maintenance schedule
  • 2.6.14.1. Routine inspection and maintenance
  • 2.6.14.2. Preshift checks
  • 2.6.14.3. Inspection and maintenance as required
  • 2.6.14.4. Inspection and maintenance every 1000 hours
  • 2.6.14.5. Inspection and maintenance every 2000 hours
  • 2.6.14.6. Inspection and maintenance every 5000 hours
  • 2.6.14.7. Inspection and maintenance every 10000 hours or 5 years, whichever is earlier
  • 2.6.15. Inspection and maintenance as required
  • 2.6.15.1. Clean the truck
  • 2.6.15.2. Check the battery electrolyte level and specific gravity
  • 2.6.15.3. Adjusting the length of the lift chains, and lubricating using chain spray
  • 2.6.15.4. Replace the hydraulic hoses and pipes
  • 2.6.15.5. Check the drive wheel nuts
  • 2.6.15.6. Replace the battery trolley slides
  • 2.6.16. hr Inspection and maintenance
  • 2.6.16.1. Check the condition and security of the wheels and tyres
  • 2.6.16.2. Check the condition of the battery and battery cables
  • 2.6.16.3. Check the condition and security of electrical connections and cables
  • 2.6.16.4. Check the parking brake gap
  • 2.6.16.5. Check the hydraulic hoses and pipes for damage
  • 2.6.16.6. Check the lift chains for condition and security
  • 2.6.16.7. Lubricate the mast, mast rollers, lift chains and chain pulleys
  • 2.6.16.8. Lubricate the reach channels and rollers
  • 2.6.16.9. Check and lubricate the battery trolley slides and associated mechanism
  • 2.6.16.10. Check the hydraulic oil level
  • 2.6.16.11. Lubricate the fork carriage and sideshift slider pad
  • 2.6.16.12. Check and lubricate the sideshift mechanism
  • 2.6.16.13. Check the pretension of the double hoses
  • 2.6.17. hr Inspection and maintenance
  • 2.6.17.1. Check the brake fluid level
  • 2.6.17.2. Check the load wheel brake shoes for wear
  • 2.6.17.3. Replace the hydraulic tank breather filter
  • 2.6.17.4. Check the reach carriage rollers, adjust if required
  • 2.6.18. hr Inspection and maintenance
  • 2.6.18.1. Grease the load wheel bearings
  • 2.6.18.2. Check condition of brake pipes
  • 2.6.18.3. Change the hydraulic oil and suction filter
  • 2.6.19. hr Inspection and maintenance
  • 2.6.19.1. Change the brake fluid
  • 2.6.20. Taking the truck out of operation
  • 2.6.21. Decommissioning the truck
  • 2.7. Technical data
  • 2.7.1. Battery data
  • 2.7.2. Dimensions (compact version)
  • 2.7.3. Technical data 1.0 tonne capacity
  • 2.7.4. Technical data 1.2 tonne capacity
  • 2.7.5. Technical data 1.4 tonne capacity
  • 2.7.6. Mast variations
  • 3. Leadacid battery charger 24V . 48V
  • 4. Leadacid battery charger 24V . 48V . 80V
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Linde 115-12 – R14, R16, R20 Production site Xiamen Operating Instructions”

Your email address will not be published. Required fields are marked *