Description
-
Model List:
- B22-2, B22-2A Excavator
- 1. FOREWORD
- 2. CONTENTS
- 3. GENERAL CAUTIONS FOR MAINTENANCE WORK
- 3.1. Correct Work
- 3.2. Safety Precautions
- 3.3. Preparations
- 3.4. Cautions for Disassembly and Reassembly
- 3.5. Cautions for Attaching and Detaching Hydraulic Equipment
- 3.6. Cautions for Attaching and Detaching Hydraulic Piping
- 3.7. Cautions for Handling Seals
- 3.8. Correct installation of Hydraulic Hose
- 3.9. Specifications of Hydraulic Hose
- 3.10. Air-Venting of hydraulic Equipment
- 4. TECHNICAL DATA
- 4.1. Specifications
- 4.2. External Drawing and Working Ranges
- 4.2.1. Canopy Type Specifications
- 4.2.2. Cabin Type Specifications
- 4.3. Weight of Main Parts
- 4.4. Lifting Capacities
- 5. SERVICING STANDARDS
- 5.1. Machine Performance
- 5.2. Engine
- 5.3. Unsercarriage
- 5.3.1. Rubber Track Specifications
- 5.3.2. Steel Track Specifications
- 5.3.3. Steel Rubber Track Common Specifications
- 5.4. Control Devices
- 5.5. Hydraulic Equipment
- 5.5.1. Hydraulic Cylinder
- 5.6. Work Implement
- 5.6.1. Front Attachment
- 5.6.2. Dozer Moving Device
- 5.6.3. Bucket Teeth
- 5.7. List of Tightening Torque
- 5.7.1. Machine
- 5.7.2. Engine
- 5.7.3. Tightening Toque of General Bolts and Nuts
- 6. ENGINE
- 6.1. Cylinder Block
- 6.2. Cylinder Head
- 6.3. Piston and Piston Pins
- 6.4. Connecting Rods
- 6.5. Crankshaft and Main Bearing Metal
- 6.6. Camshaft and Tappets
- 6.7. Timing Gear
- 6.8. Lubrication System
- 6.9. Cooling System
- 6.10. Fuel Supply System
- 6.11. Construction of Governor
- 6.12. Electrical Equipment
- 6.13. Alarm Device
- 7. HYDRAULIC SYSTEM
- 7.1. Outline
- 7.1.1. Function of Control Valve
- 7.2. Hydraulic Circuit Schematic
- 7.3. Operationg Circuit
- 7.3.1. Boom
- 7.3.2. Arm
- 7.3.3. Bucket
- 7.3.4. Swing
- 7.3.5. Boom Swing
- 7.3.6. Dozer
- 7.3.7. Traveling
- 7.3.8. Simultaneous Operation of Arm and Boom Swing
- 7.3.9. Hydraulic P.T.O.
- 7.4. Hydraulic System
- 7.4.1. Hydraulic Pump
- 7.5. Cut-offValve
- 7.6. Pilot Valve
- 7.7. Control Valve
- 7.7.1. Operation Principle
- 7.8. Swing Motor
- 7.9. Travel Motor
- 7.10. PTO Selector Valve(for Merging with Hydraulic PTO)
- 7.11. Pressure Adjustment
- 7.11.1. Relief Valve
- 7.11.2. Swing Brake Valve
- 7.11.3. Cutt-off Valve
- 8. ADJUSTMENT PROCEDURES FOR EACH EQUIPMENT
- 8.1. Electrical Equipment of the Machine
- 8.1.1. Arrangement of Electrical Equipment and Names of parts
- 8.1.2. Monitor and Alarm Systems
- 8.1.3. Wiring Diagram
- 8.2. Undercarriage
- 8.2.1. Outline
- 8.2.2. Major Parts
- 8.2.3. Cautions for Reassembly (Rubber Track Models)
- 8.2.4. Cautions for Reassembly (Steel Track Models)
- 8.2.5. Disassembly and Reassembly of Idler
- 8.2.6. Assembly of Idler
- 8.2.7. Assembly of Track Adjuster
- 8.2.8. Disassembly and Reassembly of Track Roller
- 8.2.9. Drawing of Jigs
- 8.3. Controls
- 8.3.1. Control Train
- 8.3.2. Disassembly and Reassembly of Mechanical Control Linkage
- 8.3.3. Adjustment of Lock Lever
- 8.3.4. Adjustment of Implements and Swing Control levers (for Semi-long lever type only
- 8.3.5. adjustment of travel Levers
- 8.3.6. Adjustment of 2-Speed Pedal
- 8.3.7. Adjustment of Boom Swing Pedal
- 8.3.8. Adjustment of Dozer Lever
- 8.3.9. Adjustment of Engine Speed Control
- 8.4. Swing System
- 8.4.1. Swing Bearing
- 8.5. Hydraulic Equipment
- 8.5.1. Remove and Install Hydraulic Pump
- 8.5.2. Disassembly and Reassembly of Hydraulic Cylinder
- 8.5.3. Swivel Joint
- 8.5.4. Reservoir
- 8.5.5. Hydraulic Piping Layout
- 8.6. Cabin
- 8.6.1. Removal and Installation of Cabin
- 8.6.2. Installation of Defroster
- 9. PERIODIC INSPECTION
- 9.1. List of Periodic Inspection and Servicing
- 10. FUEL,LUBE OIL AND GREASE RECOMMENDED
- 10.1. Fuel,Lube Oil and Grease Recommended by Yanmar
- 11. TROUBLESHOOTING
- 11.1. Non-breakdowns
- 11.1.1. Natural Release of Bucket
- 11.1.2. Discontinuous Arm Movement
- 11.1.3. Drifting of Upperstructure Quick Travel Operation
- 11.1.4. Thermal Shock of Travel Motor
- 11.1.5. Elongation of Boom Swing Cylinder on 90Swing
- 11.1.6. Time Lag on Switching Travel Speed
- 11.1.7. Reservoir Oil Level Fluctuation through Temperature Change
- 11.1.8. Autmatic Return from 2nd Speed to 1st Speed during low Speed Travel Motor Operation
- 11.2. Troubleshooting
- 11.2.1. Machine and Engine
- 11.2.2. Electrical Equipment on Panel
- 12. REFERENCE DATA
- 12.1. Bucket Installtion Dimension
















There are no reviews yet.