Description
-
Model List:
- V3-3, V4-3 (US) Wheel Loader
- 1. V3-3.V4-3(US)
- 2. FOREWORD
- 3. CONTENTS
- 4. GENERAL CAUTIONS FOR MAINTENANCE WORK
- 4.1. Correct Work
- 4.2. Safety Precautions
- 4.3. Preparations
- 4.4. Cautions for Disassembly and Reassembly
- 4.5. Cautions for Attaching and Detaching Hydraulic Equipment
- 4.6. Cautions for Attaching and Detaching Hydraulic Piping
- 4.7. Cautions for Handling Seals
- 4.8. Correct Installation of Hydraulic Hose
- 4.9. Specifications of Hydraulic Hose
- 5. TECHNICAL DATA
- 5.1. Name of Parts
- 5.2. Specifications
- 5.3. Dimensions
- 5.4. Recommended FuelLubricant and Coolant
- 5.5. Periodic Checks and Maintenance
- 5.6. Power Train
- 5.7. Hydraulic Circuit Diagram
- 5.8. Wiring Diagram
- 5.9. Bolt/Nut Tightening Torque(Machine Side)
- 5.10. Testing Data
- 5.11. Service Standard
- 6. ENGINE
- 6.1. MeasurementInspection and Adjustment
- 6.2. Measuring ProcessService Data and Corrective Action
- 6.3. Precautions Reassembly
- 6.4. Fuel Supply System
- 6.5. Electrical Equipment
- 6.6. Sectional View  Parts Name
- 6.7. Service Standard
- 6.8. Disassembly and Reassembly of Diff. Carrier for Model V3-3
- 6.9. Disassembly and Reassembly of Diff. Carrier for Model V4-3
- 6.10. Disassembly and Reassembly of Pinion Assembly
- 6.11. Inspection  Adjustment
- 7. TRANSFER BRAKE
- 7.1. Sectional ViewParts Name and Service Standard
- 7.2. Disassembly and Reassembly of Transfer Brake
- 8. HST (HYDROSTATIC TRANSMISSION)
- 8.1. Specifications
- 8.2. HST Main Hydraulic Pump
- 8.3. Hydraulic Motor
- 8.4. HST with Automotive Control Device
- 8.5. Gear Pump
- 8.6. Line Filter of Hydraulic Oil
- 8.7. Cautions for Servicing the HST
- 8.8. Troubleshooting of HST
- 8.9. Inspection Procedures
- 9. CONTROL VALVE
- 9.1. Structure
- 9.2. Specifications
- 9.3. Pressure Measurement and Adjustment Procedures
- 10. HYDRAULIC CYLINDER
- 10.1. Sectional View Parts Names
- 10.2. Disassembly and Reassembly
- 10.3. Testing After Reassembly
- 11. MACHINE CONTROL DEVICE
- 11.1. AccelPedal
- 11.2. Brake Pedal
- 11.3. Parking Brake
- 11.4. Inching Brake
- 11.5. Operation Lever
- 12. STEERING SYSTEM
- 12.1. Specifications
- 12.2. Structure
- 12.3. Function
- 12.4. Adjustment of Relief Pressure
- 13. HYDRAULIC PIPING LAYOUT
- 13.1. For Work Implement
- 13.2. For HST
- 14. ELECTRIC SYSTEM
- 14.1. Layout of Electrical Parts
- 14.2. Wire Harness
- 15. TROUBLESHOOTING
- 15.1. Reading the Charts
















There are no reviews yet.