Yanmar ViO75-A Excavator Service Manual

$30.00

  • Type Of Manual: Service Manual
  • Number of Pages: 584
  • Size: 94.3MB
  • Format: PDF

Description

  • Model List:

    • ViO75-A Excavator
  • 1. SPINE TITLE
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. General Cautions for Maintenance Work
  • 4.1. Correct Work
  • 4.2. Safety Precautions
  • 4.3. Preparations
  • 4.4. Cautions for Disassembly and Reassembly
  • 4.5. Cautions for Removal and Installation of Hydraulic Equipment
  • 4.6. Cautions for Removal and Installation of Hydraulic Piping
  • 4.7. Cautions for Handling Seals
  • 4.8. Correct Installation of Hydraulic Hose
  • 4.9. Specifications of Hydraulic Hose
  • 4.10. Air Release of Hydraulic Equipment
  • 5. Technical Data
  • 5.1. Specifications
  • 5.2. Outline Drawing and Working Area
  • 5.2.1. Cabin Type
  • 5.3. Weight List of Main Parts
  • 5.4. Lifting Capacity List
  • 6. Service Standards
  • 6.1. Machine Performance
  • 6.2. Engine
  • 6.3. Undercarriage
  • 6.3.1. Rubber Crawler Specifications
  • 6.3.2. Steel Crawler Specifications
  • 6.3.3. Common Specifications of Steel Rubber Crawlers
  • 6.4. Controls
  • 6.5. Hydraulic Equipment
  • 6.5.1. Hydraulic Cylinders
  • 6.6. Implement
  • 6.6.1. Front Attachments
  • 6.6.2. Blade Moving Device
  • 6.6.3. Bucket Teeth
  • 6.7. List of Tightening Torque
  • 6.7.1. Machine
  • 6.7.2. Engine
  • 6.7.3. Tightening Torque for General Bolts and Nuts
  • 7. Engine
  • 7.1. General
  • 7.1.1. How to Read This Manual
  • 7.1.2. Precautions for Service Work
  • 7.1.3. Engine External Views
  • 7.1.4. Structural Description
  • 7.1.5. Exhaust Gas Emission Regulation
  • 7.2. Troubleshooting
  • 7.2.1. Quick Reference Table for Troubleshooting
  • 7.2.2. Troubleshooting by Measuring Compression Pressure
  • 7.3. Inspection and Adjustment
  • 7.3.1. Oil Inspection
  • 7.3.2. Cooling Water Inspection
  • 7.3.3. Inspecting Water Leak from Cooling Water System and Radiator
  • 7.3.4. Fan Belt Tension Inspection and Adjustment
  • 7.3.5. Adjusting the Valve Clearance
  • 7.3.6. Inspecting the Fuel Injection Valve Injection Pressure and Spray Pattern
  • 7.3.7. Fuel Injection Timing Adjustment / Fuel Injection Pump Inspection and Adjustment
  • 7.3.8. Sensor Inspection
  • 7.3.9. Battery Inspection
  • 7.3.10. Adjusting Operation
  • 7.3.11. Long Storage
  • 7.3.12. Periodic Maintenance Schedule
  • 7.4. Engine Body
  • 7.4.1. Introduction
  • 7.4.2. Cylinder Head
  • 7.5. Lubrication System
  • 7.5.1. Lubrication System Diagram
  • 7.5.2. Trochoid Pump Components
  • 7.5.3. Disassembly (Reverse the Procedure Below for Assembly)
  • 7.5.4. Servicing Points
  • 7.6. Cooling System
  • 7.6.1. Cooling Water System
  • 7.6.2. Cooling Water Pump Components
  • 7.6.3. Disassembly (Reverse the Procedure Below for Assembly)
  • 7.6.4. Servicing Points
  • 7.7. Fuel Injection Pump / Governor
  • 7.7.1. Introduction
  • 7.7.2. Fuel Injection Pump
  • 7.8. Starting motor
  • 7.8.1. Specifications
  • 7.8.2. Components
  • 7.8.3. Troubleshooting
  • 7.9. Alternator
  • 7.9.1. Components
  • 7.9.2. Specifications
  • 7.9.3. Wiring diagram
  • 7.9.4. Standard output characteristics
  • 7.9.5. Troubleshooting
  • 7.10. Air Heater
  • 8. Hydraulic System
  • 8.1. Outline
  • 8.1.1. Control Valve Operation
  • 8.1.2. Additional Operation of Control Valve
  • 8.2. Hydraulic Circuit Schematic
  • 8.2.1. For Standard Type Machines
  • 8.3. Circuit Operation
  • 8.3.1. Boom
  • 8.3.2. Arm
  • 8.3.3. Bucket
  • 8.3.4. Swing
  • 8.3.5. Boom Swing
  • 8.3.6. Blade
  • 8.3.7. Travel
  • 8.3.8. Non-deviation Travel (with Boom, Arm, Bucket or Boom Swing Operation)
  • 8.3.9. Simultaneous Operation of Boom Up and Arm Retract
  • 8.3.10. Simultaneous Operation of Boom Up and Bucket
  • 8.3.11. Simultaneous Operation of Boom Up and Swing
  • 8.3.12. Simultaneous Operation of Arm and Bucket
  • 8.3.13. Hydraulic P.T.O.
  • 8.3.14. Travel Alarm
  • 8.3.15. h P.T.O.
  • 8.3.16. Quick Coupler
  • 8.4. Pressure Adjustment
  • 8.4.1. Relief Valves
  • 8.4.2. Swing Brake Valve
  • 8.4.3. Cut-off Valve
  • 9. Hydraulic Equipment
  • 9.1. Hydraulic Pump
  • 9.2. Control Valve
  • 9.3. Pilot Valve
  • 9.4. Swing Motor
  • 9.5. Travel Motor
  • 9.5.1. Product Overview
  • 9.5.2. Model Labeling
  • 9.5.3. External Dimensions
  • 9.5.4. Basic Configuration and Drawing
  • 9.5.5. Operating Description
  • 9.5.6. Precautions for Use
  • 9.5.7. Maintenance and Inspection
  • 9.5.8. Troubleshooting
  • 9.5.9. GM Motor Storage
  • 9.5.10. Disposal
  • 9.5.11. Service Outline
  • 9.5.12. Disassembly
  • 9.5.13. Service Preparations
  • 9.5.14. Assembly
  • 9.5.15. Performance Congirmation Test
  • 9.5.16. Clearance Adjustment Parts Dimensions Table
  • 9.6. Pilot Check Valve
  • 10. Adjustment and Repair
  • 10.1. Electric Equipment of the Machine
  • 10.1.1. Parts Layout of Electrical Equipment
  • 10.1.2. Monitor and Alarm Systems
  • 10.1.3. Wiring Diagram
  • 10.1.4. Stop Motor Operation
  • 10.1.5. Removal and Reinstallation of Engine
  • 10.1.6. Removal and Reinstallation of Starter Motor
  • 10.1.7. Removal and Reinstallation of Radiator
  • 10.1.8. Removal and Reinstallation of Fan Belt and Compressor Driving Belt
  • 10.1.9. Removal and Reinstallation of Fuel Injection Pump
  • 10.2. Undercarriage
  • 10.2.1. Outline
  • 10.2.2. Compatibility of Main Parts
  • 10.2.3. Points of Reassembly (Rubber Crawler Type)
  • 10.2.4. Points of Reassembly (Steel Crawler Type)
  • 10.2.5. Removal and Reinstallation of Crawler
  • 10.2.6. Disassembly and Reassembly of Steel Crawler
  • 10.2.7. Disassembly and Reassembly of Front Idler
  • 10.2.8. Disassembly and Reassembly of Track Roller
  • 10.2.9. Installation of Floating Seal
  • 10.2.10. Drawings of Jigs
  • 10.2.11. Disassembly and Reassembly of Carrier Roller
  • 10.3. Controls
  • 10.3.1. Control Train
  • 10.3.2. Mechanical Control Linkage
  • 10.3.3. Adjustment of Travel Levers
  • 10.3.4. Adjustment of Boom Swing Pedal
  • 10.3.5. Adjustment of Blade Lever
  • 10.3.6. Adjustment of Lock Lever
  • 10.3.7. Adjustment Procedure of P.T.O. Pedal
  • 10.3.8. Adjustment Procedure of P.T.O. Pedal Lock
  • 10.3.9. Adjustment of Accelerator Lever
  • 10.4. Swing Bearing
  • 10.4.1. Removal and Reinstallation of Swing Bearing
  • 10.5. Hydraulic Equipment
  • 10.5.1. Removal and Reinstallation of Hydraulic Pump
  • 10.5.2. Removal and Reinstallation of Control Valve
  • 10.5.3. Removal and Reinstallation of Swing Motor
  • 10.5.4. Removal and Reinstallation of Swivel Joint
  • 10.5.5. Disassembly and Reassembly of Swivel Joint
  • 10.5.6. Disassembly and Reassembly of Hydraulic Cylinders
  • 10.5.7. Hydraulic Oil Tank
  • 10.5.8. Piping Layout
  • 10.6. Implement
  • 10.6.1. Removal and Reinstallation of Implement
  • 10.6.2. Quick Coupler
  • 10.7. Cabin
  • 10.7.1. Cabin
  • 10.8. Air Conditioner
  • 10.8.1. Removal and Reinstallation of Air Conditioner
  • 11. Periodic Inspection and Servicing
  • 11.1. List of Periodic Inspection and Servicing
  • 12. Fuel, Lube Oil and Grease Recommended
  • 13. Troubleshooting
  • 13.1. Non-breakdowns
  • 13.1.1. Natural Release of Bucket
  • 13.1.2. Discontinuous Arm Movement
  • 13.1.3. Thermal Shock of Travel Motor
  • 13.1.4. Elongation of Boom Swing Cylinder on 68 degrees Swing
  • 13.1.5. Time Lag on Travel Speed Switching
  • 13.1.6. Fluctuation in Oil Level of Hydraulic Oil Tank due to Temperature Change
  • 13.2. Troubleshooting
  • 13.2.1. Machine and Engine
  • 13.2.2. Electrical Equipment on Panel
  • 14. Reference Data
  • 14.1. Specifications for Attachment
  • 15. COLOPHON
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Yanmar ViO75-A Excavator Service Manual”

Your email address will not be published. Required fields are marked *