Description
-
Model List:
- D575-2 Super Dozer
- 1. COVER
- 2. CONTENTS
- 3. ASSEMBLY PROCEDURE TIME SCHEDULE (TRANSPORTED DISASSEMBLEDWEIGHTS LESS THAN 50 TONS)
- 4. EQUIPMENT AND TOOLS TO BE USED
- 5. ASSEMBLY MAP FOR D575A2 SUPER DOZER
- 6. TRANSPORTATION POSTURE
- 7. INSTALLATION PROCEDURE
- 7.1. INSTALLATION OF MAIN UNIT PIVOT SHAFT
- 7.2. INSTALLATION OF FINAL DRIVE
- 7.3. INSTALLATION REMOVAL OF CYLINDER SUPPORT
- 7.4. INSTALLATION OF UNDERCARRIAGE
- 7.5. INSTALLATION OF BLADE CYLINDER STAY
- 7.6. INSTALLATION OF HOODS EXHAUST PIPE
- 7.7. INSTALLATION OF TRACK SHOE ASSEMBLY TRUNNION
- 7.7.1. TIGHTEN TRACK SHOE BOLTS
- 7.8. INSTALLATION OF OPERATING CABIN
- 7.9. INSTALLATION OF ROPS
- 7.10. ASSEMBLE OF BLADE ASSY
- 7.10.1. CHECK OBLIQUE ARM BALL JOINT CLEARANCE
- 7.10.2. CHECK BLADE CYLINDER CAP CLEARANCE
- 7.11. INSTALLATION OF COUNTER WEIGHT
- 7.12. INSTALLATION OF HANDRAILS
- 7.13. INSTALLATION OF POTATIOMETER
- 7.14. INSTALLATION OF LAMP
- 7.15. INSTALLATION OF EXTERNAL COVER
- 7.16. ADJUSTMENT OF TRACK TENSION ALIGNMENT FOR CARRIER ROLLER
- 7.17. LUBRICATING ITEMS
- 8. PROCEDURE MANUAL FOR INITIAL SETTING OF TILTING RESTRICTION SYSTEM
- 9. HOW TO CHECK AUTOMATIC RESETTING TO SYSTEM
- 10. BLEEDING AIR FROM HYDRAULIC CYLINDERS
- 11. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 12. COATING MATERIALS
- 13. STANDARD TIGHTENING TORQUE
- 14. ASSEMBLY JIG DRAWING
- 15. WEAR PARTS LIST
- 16. HOW TO CHECK ERROR CODE
- 17. ERROR CODE LIST
















Reviews
There are no reviews yet.