Komatsu D575-2 Super Dozer Field Assembly Instruction SEAW000501

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: SEAW000501
  • Format: PDF
  • Size: 8.4MB
  • Number of Pages: 63

Description

  • Model List:

    • D575-2 Super Dozer
  • 1. COVER
  • 2. CONTENTS
  • 3. ASSEMBLY PROCEDURE TIME SCHEDULE (TRANSPORTED DISASSEMBLEDWEIGHTS LESS THAN 50 TONS)
  • 4. EQUIPMENT AND TOOLS TO BE USED
  • 5. ASSEMBLY MAP FOR D575A2 SUPER DOZER
  • 6. TRANSPORTATION POSTURE
  • 7. INSTALLATION PROCEDURE
  • 7.1. INSTALLATION OF MAIN UNIT PIVOT SHAFT
  • 7.2. INSTALLATION OF FINAL DRIVE
  • 7.3. INSTALLATION REMOVAL OF CYLINDER SUPPORT
  • 7.4. INSTALLATION OF UNDERCARRIAGE
  • 7.5. INSTALLATION OF BLADE CYLINDER STAY
  • 7.6. INSTALLATION OF HOODS EXHAUST PIPE
  • 7.7. INSTALLATION OF TRACK SHOE ASSEMBLY TRUNNION
  • 7.7.1. TIGHTEN TRACK SHOE BOLTS
  • 7.8. INSTALLATION OF OPERATING CABIN
  • 7.9. INSTALLATION OF ROPS
  • 7.10. ASSEMBLE OF BLADE ASSY
  • 7.10.1. CHECK OBLIQUE ARM BALL JOINT CLEARANCE
  • 7.10.2. CHECK BLADE CYLINDER CAP CLEARANCE
  • 7.11. INSTALLATION OF COUNTER WEIGHT
  • 7.12. INSTALLATION OF HANDRAILS
  • 7.13. INSTALLATION OF POTATIOMETER
  • 7.14. INSTALLATION OF LAMP
  • 7.15. INSTALLATION OF EXTERNAL COVER
  • 7.16. ADJUSTMENT OF TRACK TENSION ALIGNMENT FOR CARRIER ROLLER
  • 7.17. LUBRICATING ITEMS
  • 8. PROCEDURE MANUAL FOR INITIAL SETTING OF TILTING RESTRICTION SYSTEM
  • 9. HOW TO CHECK AUTOMATIC RESETTING TO SYSTEM
  • 10. BLEEDING AIR FROM HYDRAULIC CYLINDERS
  • 11. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 12. COATING MATERIALS
  • 13. STANDARD TIGHTENING TORQUE
  • 14. ASSEMBLY JIG DRAWING
  • 15. WEAR PARTS LIST
  • 16. HOW TO CHECK ERROR CODE
  • 17. ERROR CODE LIST
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu D575-2 Super Dozer Field Assembly Instruction SEAW000501”

Your email address will not be published. Required fields are marked *