Description
-
Model List:
- GD955-7E0 Motor Grader
- 1. Cover
- 1.1. Index and Foreword
- 1.1.1. Index
- 1.1.2. Foreword
- 1.1.3. Precautions for Field Assembly
- 1.1.4. Disposal of Removed Parts
- 1.2. Work Preparation
- 1.2.1. Table of Contents
- 1.2.2. Assembly Schedule
- 1.2.3. Workspace and Layout
- 1.2.4. Specification Drawing GD9557E0
- 1.2.5. Tool List for Field Assembly
- 1.2.6. Standard Tightening Torque Table
- 1.2.7. Coating Materials List
- 1.2.8. Selection of Wire Ropes Used for Assembly
- 1.2.9. Selection of Nylon Slings Used for Assembly
- 1.2.10. Relationship Between Work Number of Assembly Procedure and Packing Tag
- 1.2.11. How to Use Fuel, Coolant and Lubricants by Ambient Temperature
- 1.3. Assembly Procedure
- 1.3.1. Table of Contents
- 1.3.2. _Machine Stationary
- 1.3.3. _Install Ripper Assembly
- 1.3.4. _Ripper Assembly_Install Piping
- 1.3.5. _Ripper Assembly_Install Shank
- 1.3.6. _Ripper Assembly_Install Lubrication Piping 1
- 1.3.7. _Ripper Assembly_Install Lubrication Piping 2
- 1.3.8. _Ripper Assembly_Install Lubrication Piping 3
- 1.3.9. _Ripper Assembly_Install Lubrication Piping 4
- 1.3.10. _Ripper Assembly_Install Lubrication Piping 5
- 1.3.11. _Ripper Assembly_Install Lubrication Piping 6
- 1.3.12. _Install Wireless LAN Modem Antenna
- 1.3.13. _Connect Wireless LAN Modem Wiring
- 1.3.14. _Install Cab Right Rear Lamp
- 1.3.15. _Install Cab Left Rear Lamp
- 1.3.16. _Install Cab Forward Wiring Harness 1
- 1.3.17. _Install Cab Forward Wiring Harness 2
- 1.3.18. _Install Revolving Lamp
- 1.3.19. _Install Cab Right Side Mirror
- 1.3.20. _Install Cab Left Side Mirror
- 1.3.21. _How to Examine and Fill Tire Pressure
- 1.3.22. Machine Check Sheet for Field Assembly
- 1.4. Index
















Reviews
There are no reviews yet.