Komatsu PC09-1 Hydraulic Excavator Operation and Maintenance Manual WEAM011800

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: WEAM011800
  • Format: PDF
  • Size: 7.9MB
  • Number of Pages: 240

Description

  • Model List:

    • PC09-1 Hydraulic Excavator
  • 1. FOREWORD
  • 2. SAFETY INFORMATION
  • 3. INTRODUCTION
  • 3.1. IMPROPER OR UNAUTHORIZED USES
  • 3.2. DIRECTIONS OF MACHINE
  • 4. PRODUCT INFORMATION
  • 4.1. MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)
  • 4.2. ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
  • 4.3. EMISSION CONTROL INFORMATION LABEL AND ITS LOCATION
  • 4.4. SERVICE METER LOCATION
  • 4.5. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 4.6. DECLARATION OF CONFORMITY (for machines placed on the market as from 29 December 2009)
  • 5. PAGE INTENTIONALLY LEFT BLANK
  • 6. SAFETY, NOISE AND VIBRATION PLATES
  • 6.1. POSITION OF THE SAFETY PLATES
  • 6.2. WARNING LABELS AND PICTOGRAMS ACTUAL
  • 6.3. PICTOGRAMS AND RELEVANT MEANINGS
  • 6.4. POSITION OF THE NOISE PLATES
  • 6.5. EXTERNAL NOISE
  • 6.6. NOISE PERCEIVED BY THE OPERATOR
  • 6.7. VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED
  • 7. SAFETY INFORMATION
  • 7.1. SAFETY RULES
  • 7.2. IF ABNORMALITIES ARE FOUND
  • 7.3. WORKING WEAR AND PERSONAL PROTECTIVE ITEMS
  • 7.4. FIRE EXTINGUISHER AND FIRST AID KIT
  • 7.5. SAFETY EQUIPMENT
  • 7.6. KEEP MACHINE CLEAN
  • 7.7. OPERATORS SEAT EQUIPMENT
  • 7.8. LEAVING OPERATORS SEAT WITH LOCK
  • 7.9. HANDRAILS AND STEPS
  • 7.10. MOUNTING AND DISMOUNTING
  • 7.11. NO PERSON ON ATTACHMENTS
  • 7.12. LIFTING OF PERSONNEL PROHIBITED
  • 7.13. BURNS PREVENTION
  • 7.14. FIRE AND EXPLOSION PREVENTION
  • 7.15. ACTION IF FIRE OCCURS
  • 7.16. FALLING OBJECTS, FLYING OBJECTS AND INTRUDING OBJECTS PREVENTION
  • 7.17. ATTACHMENTS INSTALLATION
  • 7.18. ATTACHMENTS COMBINATIONS
  • 7.19. UNAUTHORIZED MODIFICATIONS
  • 7.20. SAFETY AT JOBSITE
  • 7.21. WORKING ON LOOSE GROUND
  • 7.22. DISTANCE TO HIGHVOLTAGE CABLES
  • 7.23. ENSURE GOOD VISIBILITY
  • 7.24. VENTILATION FOR ENCLOSED AREAS
  • 7.25. ASBESTOS DUST HAZARD PREVENTION
  • 7.26. SIGNALMANS SIGNALS AND SIGNS
  • 7.27. HAND SIGNALS
  • 8. SAFETY MACHINE OPERATION
  • 8.1. BEFORE STARTING ENGINE
  • 8.2. PRECAUTIONS TO BE TAKEN WHEN WORKING
  • 8.3. TRANSPORTATION
  • 8.4. BATTERY
  • 8.5. TOWING
  • 8.6. LIFTING OBJECTS WITH BUCKET
  • 9. SAFETY MAINTENANCE INFORMATION
  • 9.1. WARNING TAG
  • 9.2. STABILITY
  • 9.3. KEEP WORK PLACE CLEAN AND TIDY
  • 9.4. APPOINT LEADER WHEN WORKING WITH OTHERS
  • 9.5. STOP ENGINE BEFORE CARRYING OUT MAINTENANCE
  • 9.6. BATTERY MAIN SWITCH PRECAUTIONS (if installed)
  • 9.7. TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
  • 9.8. PROPER TOOLS
  • 9.9. PERSONNEL
  • 9.10. ATTACHMENTS
  • 9.11. WORK UNDER THE MACHINE
  • 9.12. NOISE
  • 9.13. WHEN USING HAMMER
  • 9.14. WELDING WORKS
  • 9.15. REMOVING BATTERY TERMINALS
  • 9.16. SAFETY FIRST WHEN USING HIGH PRESSURE GREASE TO ADJUST TRACK TENSION
  • 9.17. SAFETY RULES FOR HIGHPRESSURE OIL
  • 9.18. SAFETY HANDLING HIGHPRESSURE HOSES
  • 9.19. CHEMICAL HAZARD
  • 9.20. WASTE MATERIALS
  • 9.21. COMPRESSED AIR
  • 9.22. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 9.23. PRECAUTIONS TO BE TAKEN WHEN HANDLING TECHNOPOLYMERS AND ELASTOMERS
  • 9.24. FINAL DISPOSAL OF THE MACHINE
  • 10. PAGE INTENTIONALLY LEFT BLANK
  • 11. MACHINE VIEW ILLUSTRATION
  • 11.1. OVERALL MACHINE VIEW
  • 11.2. CONTROLS AND GAUGES
  • 12. DETAILED CONTROL AND GAUGES
  • 12.1. METERS,LAMPS
  • 12.2. SWITCHES
  • 12.3. CONTROL LEVERS AND PEDALS
  • 12.4. VARIABLE BLADE
  • 12.5. ENGINE HOOD
  • 12.6. FUSE
  • 12.7. BLOCK FUSE
  • 12.8. OPERATION MANUAL STORAGE
  • 12.9. FIRE EXTINGUISHER
  • 12.10. FIRST AID KIT
  • 13. MACHINE OPERATIONS AND CONTROLS
  • 13.1. BEFORE STARTING ENGINE
  • 13.2. CHECKS BEFORE STARTING
  • 13.3. ADJUSTMENT
  • 13.4. SEAT BELT
  • 13.5. OPERATIONS BEFORE STARTING ENGINE
  • 13.6. STARTING ENGINE
  • 13.7. AFTER STARTING ENGINE
  • 13.8. STOPPING THE ENGINE
  • 13.9. CHECK AFTER SHUT OFF ENGINE
  • 13.10. MACHINE OPERATION
  • 13.11. STEERING THE MACHINE
  • 13.12. SWINGING
  • 13.13. WORK EQUIPMENT CONTROLS AND OPERATIONS
  • 13.14. PROHIBITED OPERATIONS
  • 13.15. GENERAL OPERATION INFORMATION
  • 13.16. TRAVELING ON SLOPES
  • 13.17. ESCAPE FROM MUD
  • 13.18. WORK POSSIBLE USING COMPACT HYDRAULIC EXCAVATOR
  • 13.19. BUCKET REPLACEMENT
  • 13.20. PARKING MACHINE
  • 13.21. MACHINE INSPECTION AFTER DAILY WORK
  • 13.22. RUBBER SHOES (MACHINE WITH RUBBER SHOES ONLY)
  • 14. TRANSPORTATION
  • 14.1. TRANSPORTATION PROCEDURE
  • 14.2. LOADIND AND UNLOADING WITH TRAILER
  • 14.3. LIFTING MACHINE
  • 14.4. SHIPPING MACHINE INFORMATION
  • 15. COLD WEATHER OPERATION
  • 15.1. COLD WEATHER OPERATION INFORMATION
  • 15.2. AFTER DAILY WORK COMPLETION
  • 15.3. AFTER COLD WEATHER SEASON
  • 16. LONGTERM STORAGE
  • 16.1. BEFORE STORAGE
  • 16.2. DURING STORAGE
  • 16.3. AFTER STORAGE
  • 16.4. STARTING MACHINE AFTER LONGTERM STORAGE
  • 16.5. AMBIENT TEMPERATURE RANGE FOR OPERATION AND LONG TERM STORAGE
  • 17. TROUBLES AND ACTIONS
  • 17.1. RUNNING OUT OF FUEL
  • 17.2. PHENOMENA THAT ARE NOT FAILURES
  • 17.3. TOWING THE MACHINE
  • 17.4. SEVERE JOB CONDITION
  • 17.5. DISCHARGED BATTERY
  • 17.6. BATTERY REMOVAL AND INSTALLATION
  • 17.7. BATTERY CHARGES
  • 17.8. STARTING ENGINE WITH BOOSTER CABLES
  • 17.9. OTHRE TROUBLE
  • 18. MAINTENANCE INFORMATION
  • 19. LUBRICANTS, COOLANT AND FILTERS
  • 19.1. OIL, FUEL AND COOLANT
  • 19.2. ELECTRIC SYSTEM MAINTENANCE
  • 20. WEAR PARTS
  • 20.1. WEAR PARTS LIST
  • 21. LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS
  • 21.1. COOLANT
  • 22. TIGHTENING TORQUE SPECIFICATIONS
  • 22.1. TIGHTENING TORQUE LIST
  • 23. LUBRICATION
  • 23.1. LUBRICATION DIAGRAM
  • 24. SAFETY CRITICAL PARTS
  • 24.1. SAFETY CRITICAL PARTS LIST
  • 25. MAINTENANCE SCHEDULE
  • 25.1. MAINTENANCE SCHEDULE CHART
  • 25.2. MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
  • 26. MAINTENANCE PROCEDURE
  • 26.1. INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
  • 26.2. WHEN REQUIRED
  • 26.3. CHECK BEFORE STARTING
  • 26.4. EVERY 100 HOURS MAINTENANCE
  • 26.5. EVERY 250 HOURS MAINTENANCE
  • 26.6. EVERY 500 HOURS MAINTENANCE
  • 26.7. EVERY 1000 HOURS MAINTENANCE
  • 26.8. EVERY 2000 HOURS MAINTENANCE
  • 27. END OF SERVICE LIFE
  • 28. SPECIFICATIONS
  • 28.1. LIFTING CAPACITY
  • 29. PAGE INTENTIONALLY LEFT BLANK
  • 30. ATTACHMENTS AND OPTIONS GENERAL INFORMATION
  • 30.1. SAFETY FIRST
  • 30.2. ATTACHMENT INSTALLATION
  • 31. BUCKET WITH HOOK
  • 31.1. HOOK CONDITION
  • 31.2. PROHIBITED OPERATIONS
  • 32. ATTACHMENT GUIDE
  • 32.1. ATTACHMENT COMBINATIONS
  • 32.2. ATTACHMENT CONFIGURATION
  • 32.3. SPECIFICATIONS
  • 33. HANDLING ARM WITH BUILTIN BREAKER
  • 33.1. BUCKET POSTURE
  • 33.2. REMOVING AND INSTALLING CHISEL
  • 33.3. PROCEDURE FOR BREAKER OPERATIONS
  • 33.4. PRECAUTIONS WHEN CARRYING OUT BREAKER OPERATIONS
  • 33.5. STOWING CHISEL, DUMMY CHISEL
  • 33.6. PRECAUTIONS WHEN CARRYING OUT BUCKET OPERATIONS
  • 33.7. HANDLING DUMMY LINK
  • 33.8. CHECK BEFORE STARTING
  • 34. HANDLING BUCKET COUPLER
  • 34.1. PROCEDURE FOR REMOVING BUCKET
  • 34.2. PROCEDURE FOR REMOVING BUCKET
  • 35. RECOMMENDED ATTACHMENT OPERATIONS
  • 35.1. HYDRAULIC BREAKER
  • 36. PAGE INTENTIONALLY LEFT BLANK
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC09-1 Hydraulic Excavator Operation and Maintenance Manual WEAM011800”

Your email address will not be published. Required fields are marked *