Komatsu PC160LC-8, PC190LC-8, PC190NLC-8 Hydraulic Excavator Operation and Maintenance Manual UENAM00773
$30.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: UENAM00773
- Format: PDF
- Size: 12.8MB
- Number of Pages: 436
Description
-
Model List:
- PC160LC-8 Hydraulic Excavator
- PC190LC-8 Hydraulic Excavator
- PC190NLC-8 Hydraulic Excavator
- 1. FOREWORD
- 1.1. FOREWORD
- 1.2. SAFETY INFORMATION
- 1.2.1. NOISE (PC160LC)
- 1.2.2. NOISE (PC190LC,190NLC)
- 1.2.3. Vibration levels for PC160 and PC1908
- 1.3. INTRODUCTION
- 1.3.1. DEMOLITION WORK
- 1.3.2. DIRECTIONS OF MACHINE
- 1.3.3. OPERATOR PROTECTIVE STRUCTURE
- 1.3.4. VISIBILITY FOR OPERATOR
- 1.3.5. BREAKINGIN THE NEW MACHINE
- 1.4. PRODUCT INFORMATION
- 1.4.1. PRODUCT IDENTIFICATION NUMBER (PIN)/MACHINE SERIAL NO. PLATE
- 1.4.2. EPA REGULATIONS, ENGINE NUMBER PLATE
- 1.4.3. SERVICE METER LOCATION
- 1.4.4. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 1.4.5. MACHINE SERIAL PLATE
- 1.4.6. DECLARATION OF CONFORMITY
- 1.4.7. ATTACHMENTS AND OPTIONS
- 1.4.8. LOCATION OF SAFETY LABELS
- 1.4.9. SAFETY LABELS
- 1.5. SAFETY INFORMATION
- 1.5.1. SAFETY RULES
- 1.5.2. IF PROBLEMS ARE FOUND
- 1.5.3. WORKING WEAR AND PERSONAL PROTECTIVE ITEMS
- 1.5.4. FIRE EXTINGUISHER AND FIRST AID KIT
- 1.5.5. SAFETY EQUIPMENT
- 1.5.6. KEEP MACHINE CLEAN
- 1.5.7. KEEP OPERATORS COMPARTMENT CLEAN
- 1.5.8. LEAVING OPERATORS SEAT WITH LOCK
- 1.5.9. HANDRAILS AND STEPS
- 1.5.10. MOUNTING AND DISMOUNTING
- 1.5.11. LIFTING OF PERSONNEL PROHIBITED
- 1.5.12. NO PERSONS ON ATTACHMENTS
- 1.5.13. DO NOT GET CAUGHT IN ARTICULATED PORTION
- 1.5.14. BURN PREVENTION
- 1.5.15. ACTION IF FIRE OCCURS
- 1.5.16. WINDSHIELD WASHER FLUID
- 1.5.17. PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
- 1.5.18. FALLING OBJECTS, FLYING OBJECTS AND INTRUDING OBJECTS PREVENTION
- 1.5.19. ACTIONS IN THE EVENT OF DAMAGE TO SAFETY STRUCTURES
- 1.5.20. ATTACHMENT INSTALLATION
- 1.5.21. ATTACHMENT COMBINATIONS
- 1.5.22. CAB WINDOW GLASSES
- 1.5.23. UNAUTHORIZED MODIFICATIONS
- 1.5.24. SAFETY AT JOBSITE
- 1.5.25. WORKING ON LOOSE GROUND
- 1.5.26. DISTANCE TO HIGH VOLTAGE CABLES
- 1.5.27. ENSURE GOOD VISIBILITY
- 1.5.28. VENTILATION FOR ENCLOSED AREA
- 1.5.29. SIGNALMANS SIGNAL AND SIGNS
- 1.5.30. EMERGENCY EXIT FROM OPERATORS CAB
- 1.5.31. ELECTROMAGNETIC INTERFERENCE
- 1.5.32. ASBESTOS DUST HAZARD PREVENTION
- 1.6. SAFETY MACHINE OPERATION
- 1.6.1. STARTING ENGINE
- 1.6.2. OPERATION
- 1.6.3. TRANSPORTATION
- 1.6.4. TURN THE BATTERY DISCONNECT SWITCH TO THE OFF POSITION
- 1.6.5. BATTERY
- 1.6.6. TOWING
- 1.6.7. LIFTING OBJECTS WITH BUCKET
- 1.7. SAFETY MAINTENANCE INFORMATION
- 1.7.1. WARNING TAG
- 1.7.2. KEEP WORK PLACE CLEAN AND TIDY
- 1.7.3. STABILITY
- 1.7.4. GUARDS
- 1.7.5. END OF SERVICE LIFE
- 1.7.6. APPOINT LEADER WHEN WORKING WITH OTHERS
- 1.7.7. STOP ENGINE BEFORE CARRYING OUT MAINTENANCE
- 1.7.8. TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
- 1.7.9. PROPER TOOLS
- 1.7.10. ACCUMULATOR
- 1.7.11. HANDLING GAS SPRING
- 1.7.12. PERSONNEL
- 1.7.13. ATTACHMENTS
- 1.7.14. WORK UNDER THE MACHINE
- 1.7.15. NOISE
- 1.7.16. WHEN USING HAMMER
- 1.7.17. WELDING WORKS
- 1.7.18. SAFETY FIRST WHEN USING HIGHPRESSURE GREASE TO ADJUST TRACK TENSION
- 1.7.19. DO NOT DISASSEMBLE RECOIL SPRINGS
- 1.7.20. SAFETY RULES FOR HIGHPRESSURE OIL
- 2. OPERATION
- 2.1. MACHINE VIEW ILLUSTRATIONS
- 2.1.1. OVERALL MACHINE VIEW
- 2.1.2. CONTROLS AND GAUGES
- 2.2. DETAILED CONTROLS AND GAUGES
- 2.2.1. MONITORING SYSTEM
- 2.2.2. SWITCHES
- 2.2.3. DIESEL PARTICULATE FILTER (DPF) MONITOR
- 2.2.4. CONTROL LEVERS AND PEDALS
- 2.2.5. CEILING WINDOW
- 2.2.6. WINDSHIELD
- 2.2.7. EMERGENCY ESCAPE HAMMER
- 2.2.8. DOOR LOCK
- 2.2.9. CAPS AND COVERS WITH LOCK
- 2.2.10. DRINK BOX
- 2.2.11. MAGAZINE BOX
- 2.2.12. ASHTRAY
- 2.2.13. AIR CONDITIONER CONTROLS
- 2.2.14. BATTERY DISCONNECT SWITCH
- 2.2.15. RADIO
- 2.2.16. AUXILIARY ELECTRIC POWER
- 2.2.17. FUSE
- 2.2.18. FUSIBLE LINK
- 2.2.19. CONTROLLER
- 2.2.20. TOOL BOX
- 2.2.21. GREASE GUN HOLDER
- 2.3. MACHINE OPERATIONS AND CONTROLS
- 2.3.1. BEFORE STARTING ENGINE
- 2.3.2. REFUELLING PUMP
- 2.3.3. STARTING ENGINE
- 2.3.4. AFTER STARTING ENGINE
- 2.3.5. STOPPING THE ENGINE
- 2.3.6. MACHINE OPERATION
- 2.3.7. STEERING THE MACHINE
- 2.3.8. SWINGING
- 2.3.9. WORK EQUIPMENT CONTROLS AND OPERATIONS
- 2.3.10. WORKING MODE
- 2.3.11. PROHIBITED OPERATIONS
- 2.3.12. GENERAL OPERATION INFORMATION
- 2.3.13. TRAVELLING ON SLOPES
- 2.3.14. ESCAPE FROM MUD
- 2.3.15. RECOMMENDED APPLICATIONS
- 2.3.16. BUCKET REPLACEMENT AND INVERSION
- 2.3.17. PARKING MACHINE
- 2.3.18. MACHINE INSPECTION AFTER DAILY WORK
- 2.3.19. LOCKING
- 2.4. TRANSPORTATION
- 2.4.1. TRANSPORTATION PROCEDURE
- 2.4.2. LOADING AND UNLOADING WITH TRAILER
- 2.4.3. LIFTING MACHINE
- 2.5. COLD WEATHER OPERATION
- 2.5.1. COLD WEATHER OPERATION INFORMATION
- 2.5.2. AFTER DAILY WORK COMPLETION
- 2.5.3. AFTER COLD WEATHER SEASON
- 2.6. LONG TERM STORAGE
- 2.6.1. BEFORE STORAGE
- 2.6.2. DURING STORAGE
- 2.6.3. AFTER STORAGE
- 2.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 2.7. TROUBLES AND ACTIONS
- 2.7.1. RUNNING OUT OF FUEL
- 2.7.2. PHENOMENA THAT ARE NOT FAILURES
- 2.7.3. TOWING THE MACHINE
- 2.7.4. LIGHTWEIGHT TOWING HOLE
- 2.7.5. SEVERE JOB CONDITION
- 2.7.6. DISCHARGED BATTERY
- 2.7.7. OTHER TROUBLE
- 3. MAINTENANCE
- 3.1. MAINTENANCE INFORMATION
- 3.2. OUTLINE OF SERVICE
- 3.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
- 3.2.2. ELECTRICAL SYSTEM MAINTENANCE
- 3.3. WEAR PARTS
- 3.3.1. WEAR PARTS LIST
- 3.4. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 3.4.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
- 3.5. TIGHTENING TORQUE SPECIFICATIONS
- 3.5.1. TIGHTENING TORQUE LIST
- 3.6. SAFETY CRITICAL PARTS
- 3.6.1. SAFETY CRITICAL PARTS LIST
- 3.7. MAINTENANCE SCHEDULE
- 3.7.1. MAINTENANCE SCHEDULE CHART
- 3.7.2. MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
- 3.8. MAINTENANCE PROCEDURE
- 3.8.1. INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
- 3.8.2. INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500 HOURS)
- 3.8.3. WHEN REQUIRED
- 3.8.4. CHECK BEFORE STARTING
- 3.8.5. EVERY 100 HOURS MAINTENANCE
- 3.8.6. EVERY 250 HOURS MAINTENANCE
- 3.8.7. EVERY 500 HOURS MAINTENANCE
- 3.8.8. EVERY 1000 HOURS MAINTENANCE
- 3.8.9. EVERY 2000 HOURS MAINTENANCE
- 3.8.10. EVERY 4000 HOURS MAINTENANCE
- 3.8.11. EVERY 5000 HOURS MAINTENANCE
- 3.8.12. EVERY 8000 HOURS MAINTENANCE
- 3.9. AUTOMATIC GREASE SYSTEM
- 3.9.1. Indication on the incab display
- 3.10. END OF SERVICE LIFE
- 4. SPECIFICATIONS
- 4.1. SPECIFICATIONS
- 4.1.1. PC160LC8, PC190LC8,PC190NLC8
- 4.1.2. WORKING RANGE 1PC BOOM
- 4.1.3. WORKING RANGE 2PC BOOM
- 4.1.4. EXPLANATION OF LIFTING CAPACITY CHART 1PIECE BOOM (PC160LC8, PC190LC8, PC190NLC8)
- 4.1.5. EXPLANATION OF LIFTING CAPACITY CHART 2PIECE BOOM (PC160LC8, PC190LC8, PC190NLC8)
- 4.2. SPECIFICATIONS
- 4.2.1. PC160LGP8
- 4.2.2. EXPLANATION OF LIFTING CAPACITY CHART 1PIECE BOOM (PC160LGP8)
- 5. ATTACHMENTS AND OPTIONS
- 5.1. GENERAL PRECAUTIONS FOR SAFETY
- 5.1.1. PRECAUTIONS WHEN SELECTING
- 5.1.2. READ THE INSTRUCTION MANUAL THOROUGHLY
- 5.1.3. PRECAUTIONS WHEN REMOVING OR INSTALLING
- 5.1.4. PRECAUTIONS WHEN USING
- 5.1.5. SPECIFICATIONS
- 5.1.6. ARM/PIN INFORMATION PC160/1908
- 5.2. HYDRAULIC QUICK COUPLER PIPING
- 5.2.1. LOCATIONS
- 5.2.2. OPERATION
- 5.3. BUCKET WITH HOOK
- 5.3.1. HOOK CONDITION
- 5.3.2. PROHIBITED OPERATIONS
- 5.4. MACHINE READY FOR ATTACHMENTS
- 5.4.1. EXPLANATION OF COMPONENTS
- 5.4.2. ATTACHMENT REMOVAL AND INSTALLATION
- 5.4.3. ATTACHMENT OPERATIONS
- 5.4.4. LONG TERM STORAGE
- 5.5. ATTACHMENT GUIDE
- 5.5.1. ATTACHMENT COMBINATIONS
- 5.5.2. TRACK SHOES SELECTION
- 5.5.3. BUCKET TEETH SELECTION
- 5.6. RECOMMENDED ATTACHMENT OPERATIONS
- 5.6.1. HYDRAULIC BREAKER
- 5.7. HANDLING MACHINES EQUIPPED WITH KOMTRAX
- 5.7.1. BASIC PRECAUTIONS
- 5.8. PC160LC8 PC190LC8 PC190NLC8 2PIECE BOOM
- 5.8.1. FEATURES OF 2PIECE BOOM ARM
- 5.8.2. OPERATION
- 5.8.3. TRANSPORTATION
- 5.8.4. LUBRICATING
Reviews
There are no reviews yet.