Description
-
Model List:
- PC4000-6E Hydraulic Mining Shovel
- 1. INTRODUCTION
- 1.1. CONTENTS OF THE BINDER
- 1.2. DIVISION OF THE BINDER
- 1.3. DESIGNATED USE OF THE SHOVEL
- 1.4. DELIVERY OF THE SHOVEL
- 1.5. EXPLANATION OF ABBREVATIONS
- 1.6. TABLE OF CONTENTS
- 2. SAFETY
- 2.1. SAFETY INSTRUCTIONS
- 3. OPERATION
- 3.1. FOREWORD
- 3.2. CONSTRUCTION OF THE SHOVEL
- 3.3. OPERATORS CAB CONTROLS
- 3.4. ELECTRONIC MONITORING AND CONTROL SYSTEM ECS
- 3.5. CAMERA SYSTEM WITH MONITOR
- 3.6. OPERATING THE HEATER, VENTILATION AND AIR CONDITIONING
- 3.7. MACHINERY HOUSE
- 3.8. MEDIUM VOLTAGE SWITCH CABINET IN CAB BASE
- 3.9. HIGH VOLTAGE SWITCH CABINET
- 3.10. CHECKS BEFORE STARTING THE MOTOR
- 3.11. STARTING THE MAIN DRIVE MOTOR
- 3.12. MOVING THE SHOVEL
- 3.13. SLEWING AND BRAKING THE SUPERSTRUCTURE
- 3.14. WORKING WITH THE ATTACHMENT
- 3.15. WORKING INSTRUCTIONS
- 3.16. PARKING THE SHOVEL
- 3.17. STOPPING THE MOTOR
- 3.18. OPERATION OF THE LUBRICATION SYSTEM
- 3.19. TRANSFER PUMP FOR HYDRAULIC OIL
- 3.20. FIRE DETECTION, ACTUATION AND SUPPRESSION SYSTEM
- 3.21. CENTRAL REFILLING SYSTEM
- 3.22. CABLE DRUM (IF SO EQUIPPED)
- 3.23. WORK ON THE LOADER ATTACHMENT
- 3.24. TRANSPORTATION AND LIFTING OF THE SHOVEL
- 3.25. RETRIEVAL PROCEDURE
- 3.26. SHOVEL STORAGE
- 3.27. TROUBLE SHOOTING
- 4. MAINTENANCE
- 4.1. FOREWORD
- 4.2. PRECAUTIONS FOR MAINTENANCE
- 4.3. FLUIDS AND LUBRICANTS
- 4.4. FILLING CAPACITIES
- 4.5. STANDARD TORQUE LIST
- 4.6. LUBRICATION AND MAINTENANCE SCHEDULE
- 4.7. WHEN NECESSARY
- 4.8. EVERY 10 OPERATING HOURS OR DAILY
- 4.9. EVERY 50 OPERATING HOURS OR WEEKLY
- 4.10. EVERY 250 OPERATING HOURS OR MONTHLY
- 4.11. EVERY 500 OPERATING HOURS OR MONTHLY
- 4.12. EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH
- 4.13. EVERY 2000 OPERATING HOURS OR YEARLY
- 4.14. EVERY 3000 OPERATING HOURS HOWEVER AT LEAST ONCE A YEAR
- 4.15. FIRE PREVENTION
- 4.16. WELD REPAIRS
















Reviews
There are no reviews yet.