Description
-
Model List:
- PC600-6 Hydraulic Excavator
- PC600LC-6 Hydraulic Excavator
- 1. COVER
- 2. CONTENTS
- 3. ASSEMBLING PROCEDURES,APPLICABLE EQUIPMENT AND SCHEDULE
- 4. TRANSPORTATION
- 4.1. PACKING STYLE FOR TRANSPORTATION
- 4.2. STEPS TO TAKE BEFORE AND AFTER ASSEMBLY
- 4.3. TIGHTENING TORQUE OF PIPE THREAD
- 5. INSTALLATION OF OPG HEAD GUARD
- 6. INSTALLATION OF REARVIEW MIRROR
- 7. INSTALLATION OF HANDRAIL
- 8. INSTALLATION OF STEP
- 9. INSTALLATION OF LEFT SIDE STEP
- 10. STICKING SEAT TO COUNTERWEIGHT
- 11. REMOVAL OF MUFFLER TAIL PIPE
- 12. INSTALLATION OF COUNTERWEIGHT
- 13. INSTALLATION OF MUFFLER TAIL PIPE
- 14. INSTALLATION OF RADIO ANTENNA
- 15. INSTALLATION OF LIGHT ON TOP OF CAB
- 16. EXTENSION AND RETRACTION OF TRACK FRAME GAUGE
- 17. INSTALLATION OF TRAVEL PIPING COVER
- 18. BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
- 19. BOOM ASSEMBLY
- 20. INSTALLATION OF BOOM CYLINDER FOOT
- 21. INSTALLATION OF BOOM CYLINDER HOSES
- 22. INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
- 23. BOOM CYLINDER
- 24. ARM CYLINDER
- 25. INSTALLATION OF ARM CYLINDER HOSES
- 26. INSTALLATION OF ARM ASSEMBLY
- 27. INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
- 28. WORK EQUIPMENT PIPING FOR BUCKET CYLINDER BETWEEN BOOM AND BUCKET CYLINDER
- 29. WORK EQUIPMENT GREASE PIPING
- 30. WORK EQUIPMENT WIRING
- 31. GREASING ASSEMBLED WORK EQUIPMENT
- 32. ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
- 32.1. RELEASING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
- 32.2. PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
- 32.3. INSTALLATION OF BOOM AND ARM ASSEMBLY
- 32.4. INSTALLATION OF BOOM CYLINDER
- 32.5. INSTALLATION OF BOOM CYLINDER FOOT
- 32.6. INSTALLATION OF BOOM CYLINDER HOSES
- 32.7. INSTALLATION OF BOOM CYLINDER ROD PIN
- 32.8. INSTALLATION OF ARM CYLINDER HOSES
- 32.9. INSTALLATION OF BUCKET CYLINDER
- 32.10. INSTALLATION OF BUCKET CYLINDER HOSE
- 32.11. INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
- 32.12. INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
- 32.13. INSTALLATION OF BUCKET ASSEMBLY (1/2)
- 32.14. INSTALLATION OF BUCKET ASSEMBLY (2/2)
- 32.15. INSTALLATION OF WORKING LAMPS
- 32.16. INSTALLATION OF WORK EQUIPMENT GREASE PIPING
- 32.17. GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
- 32.18. BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
- 32.19. FLUSHING OF WORK EQUIPMENT PIPING
- 32.20. CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
- 33. FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
- 34. FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)
















Reviews
There are no reviews yet.