Komatsu PC600-8, PC600LC-8 Field Assembly Instruction GEN00043-04

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00043-04
  • Format: PDF
  • Size: 12.9MB
  • Number of Pages: 138

Description

  • Model List:

    • PC600-8
    • PC600LC-8
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. DISPOSAL OF REMOVED PARTS
  • 7. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
  • 8. KIT LAYOUT DIAGRAM
  • 9. TRANSPORTATION
  • 10. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 11. TIGHTENING TORQUE
  • 12. ASSEMBLY OF CHASSIS
  • 12.1. A1. Installation of Left and Right Track Frames
  • 12.2. A2. Installation of Travel Pipe
  • 12.3. A3. Installation of Operator Cabs Left Handrail
  • 12.4. A4. Installation of Operator Cabs Door Stopper and Striker
  • 12.5. A5. Installation of Rearview Mirror
  • 12.6. A6. Installation of Handrail
  • 12.7. A7. Installation of Step
  • 12.8. A8. Installation of Left Side Step
  • 12.9. A9. Sticking Sheet to Counterweight
  • 12.10. A10. Installation of Counterweight
  • 12.11. A11. Installation of Step Light
  • 12.12. A12. Installation of Travel Piping Cover
  • 12.13. A13. Testing Track Shoe Tension
  • 12.14. A14. Check Fuel, Coolant and Oil Levels
  • 13. ASSEMBLING OF WORK EQUIPMENT
  • 13.1. B1. Assembly of Arm Cylinder
  • 13.2. B2. Connection of Arm Cylinder Hoses
  • 13.3. B3. Installation of Boom Cylinder
  • 13.4. B4. Installation of Boom Foot Dust Seal
  • 13.5. B5. Assembly of Boom Assembly
  • 13.6. B6. Installation of Boom Cylinder Hoses
  • 13.7. B7. Installation of Hoses from Chassis Along Top of Boom
  • 13.8. B8. Connection of Boom Cylinder Head
  • 13.9. B9. Installation of Arm Assembly
  • 13.10. B10. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
  • 13.11. B11. Installation of Bucket
  • 13.12. B12. Connection of Work Equipment Grease Piping
  • 13.13. B13. Connection of Work Equipment Wiring
  • 13.14. B14. Greasing after Assembling Work Equipment
  • 13.15. B15. Bleeding Air from Work Equipment Circuit
  • 13.16. B16. Parts to be Touched up After Field Assembly
  • 14. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
  • 14.1. M1. Inspection of Oil Level in Hydraulic Tank and Refill
  • 14.2. M2. Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 14.3. M3. Flushing of Hydraulic Circuit
  • 14.4. M4. Error Code
  • 14.5. M5. Operating Method of Monitoring
  • 15. ASSEMBLING OF COUNTERWEIGHT REMOVER
  • 15.1. D1. Sticking Sheet to Counterweight
  • 15.2. D2. Adjustment of Shims for Counterweight
  • 15.3. D3. Greasing
  • 15.4. D4. Installation of Counterweight Remover
  • 15.5. D5. Installation of Covers
  • 15.6. D6. Installation of Clamps
  • 15.7. D7. Installation of Hoses
  • 15.8. D8. Bleeding Air from Counterweight Remover Circuit
  • 15.9. D9. Installation of Counterweight
  • 15.10. D10. Check of Operation
  • 16. Field Assembly Inspection Report (Backhoe)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC600-8, PC600LC-8 Field Assembly Instruction GEN00043-04”

Your email address will not be published. Required fields are marked *