Komatsu PC600-8R, PC600LC-8R Hydraulic Excavator Field Assembly Instruction GEN00065-01

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00065-01
  • Format: PDF
  • Size: 11.4MB
  • Number of Pages: 171

Description

  • Model List:

    • PC600-8R Hydraulic Excavator
    • PC600LC-8R Hydraulic Excavator
  • 1. COVER
  • 2. FOREWARD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
  • 7. KIT LAYOUT DIAGRAM
  • 8. TRANSPORTATION
  • 9. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 10. TIGHTENING TORQUE
  • 11. ASSEMBLY OF CHASSIS
  • 11.1. A1. Installation of Left and Right Track Frames
  • 11.2. A2. Installation of Travel Pipe
  • 11.3. A3. Installation of Operator Cabs Left Handrail
  • 11.4. A4. Installation of Operator Cabs Door Stopper and Striker
  • 11.5. A5. Installation of Rearview Mirror
  • 11.6. A6. Installation of Handrail
  • 11.7. A7. Installation of Step
  • 11.8. A8. Installation of Left Side Step
  • 11.9. A9. Sticking Sheet to Counterweight
  • 11.10. A10. Installation of Counterweight
  • 11.11. A11. Installation of Step Light
  • 11.12. A12. Installation of Travel Piping Cover
  • 11.13. A13. Installation of Precleaner
  • 11.14. A14. Testing Track Shoe Tension
  • 11.15. A15. Check Fuel, Coolant and Oil Levels
  • 12. ASSEMBLING OF WORK EQUIPMENT
  • 12.1. B1. Assembly of Arm Cylinder
  • 12.2. B2. Connection of Arm Cylinder Hoses
  • 12.3. B3. Installation of Boom Cylinder
  • 12.4. B4. Assembly of Boom Assembly
  • 12.5. B5. Installation of Boom Cylinder Hoses
  • 12.6. B6. Installation of Hoses from Chassis Along Top of Boom
  • 12.7. B7. Connection of Boom Cylinder Head
  • 12.8. B8. Installation of Arm Assembly
  • 12.9. B9. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
  • 12.10. B10. Installation of Bucket
  • 12.11. B11. Connection of Work Equipment Grease Piping
  • 12.12. B12. Connection of Work Equipment Wiring
  • 12.13. B13. Greasing after Assembling Work Equipment
  • 12.14. B14. Bleeding Air from Work Equipment Circuit
  • 12.15. B15. Parts to be Touched up After Field Assembly
  • 13. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
  • 13.1. M1. Inspection of Oil Level in Hydraulic Tank and Refill
  • 13.2. M2. Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 13.3. M3. Flushing of Hydraulic Circuit
  • 13.4. M4. Error Code
  • 13.5. M5. Operating Method of Monitoring
  • 14. ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
  • 14.1. C1. Releasing Residual Pressure in Hydraulic Circuit
  • 14.2. C2. Pulling Out Boom Foot Pin and Boom Cylinder Foot Pin
  • 14.3. C3. Installation of Boom Cylinder Foot
  • 14.4. C4. Installation of Boom and Arm Assembly
  • 14.5. C5. Installation of Boom Cylinder Hoses
  • 14.6. C6. Installation of Boom Cylinder Rod Pin
  • 14.7. C7. Installation of Boom Cylinder
  • 14.8. C8. Installation of Arm Cylinder Hoses
  • 14.9. C9. Installation of Bucket Cylinder
  • 14.10. C10. Installation of Bucket Cylinder Hose
  • 14.11. C11. Installation of Connecting Hoses between Chassis and Boom Top
  • 14.12. C12. Installation of Bottom Dump Cylinder Hoses
  • 14.13. C13. Installation of Bucket Assembly
  • 14.14. C14. Installation of Working Lamps
  • 14.15. C15. Installation of Work Equipment Grease Piping
  • 14.16. C16. Greasing After Assembling of Work Equipment
  • 14.17. C17. Bleeding Air from Work Equipment Circuit
  • 14.18. C18. Checking Oil Level in Hydraulic Tank and Adding Oil
  • 14.19. C19. Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 14.20. C20. Flushing of Hydraulic Circuit
  • 15. FIELD ASSEMBLY INSPECTION REPORT (Backhone)
  • 16. FIELD ASSEMBLY INSPECTION REPORT (Loading Shovel)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC600-8R, PC600LC-8R Hydraulic Excavator Field Assembly Instruction GEN00065-01”

Your email address will not be published. Required fields are marked *