Description
-
Model List:
- PC600-8R Hydraulic Excavator
- PC600LC-8R Hydraulic Excavator
- 1. COVER
- 2. FOREWARD
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
- 7. KIT LAYOUT DIAGRAM
- 8. TRANSPORTATION
- 9. LIST OF TOOLS FOR FIELD ASSEMBLING
- 10. TIGHTENING TORQUE
- 11. ASSEMBLY OF CHASSIS
- 11.1. A1. Installation of Left and Right Track Frames
- 11.2. A2. Installation of Travel Pipe
- 11.3. A3. Installation of Operator Cabs Left Handrail
- 11.4. A4. Installation of Operator Cabs Door Stopper and Striker
- 11.5. A5. Installation of Rearview Mirror
- 11.6. A6. Installation of Handrail
- 11.7. A7. Installation of Step
- 11.8. A8. Installation of Left Side Step
- 11.9. A9. Sticking Sheet to Counterweight
- 11.10. A10. Installation of Counterweight
- 11.11. A11. Installation of Step Light
- 11.12. A12. Installation of Travel Piping Cover
- 11.13. A13. Installation of Precleaner
- 11.14. A14. Testing Track Shoe Tension
- 11.15. A15. Check Fuel, Coolant and Oil Levels
- 12. ASSEMBLING OF WORK EQUIPMENT
- 12.1. B1. Assembly of Arm Cylinder
- 12.2. B2. Connection of Arm Cylinder Hoses
- 12.3. B3. Installation of Boom Cylinder
- 12.4. B4. Assembly of Boom Assembly
- 12.5. B5. Installation of Boom Cylinder Hoses
- 12.6. B6. Installation of Hoses from Chassis Along Top of Boom
- 12.7. B7. Connection of Boom Cylinder Head
- 12.8. B8. Installation of Arm Assembly
- 12.9. B9. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
- 12.10. B10. Installation of Bucket
- 12.11. B11. Connection of Work Equipment Grease Piping
- 12.12. B12. Connection of Work Equipment Wiring
- 12.13. B13. Greasing after Assembling Work Equipment
- 12.14. B14. Bleeding Air from Work Equipment Circuit
- 12.15. B15. Parts to be Touched up After Field Assembly
- 13. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
- 13.1. M1. Inspection of Oil Level in Hydraulic Tank and Refill
- 13.2. M2. Replacement of Return Filter (Standard Filter to Flushing Filter)
- 13.3. M3. Flushing of Hydraulic Circuit
- 13.4. M4. Error Code
- 13.5. M5. Operating Method of Monitoring
- 14. ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
- 14.1. C1. Releasing Residual Pressure in Hydraulic Circuit
- 14.2. C2. Pulling Out Boom Foot Pin and Boom Cylinder Foot Pin
- 14.3. C3. Installation of Boom Cylinder Foot
- 14.4. C4. Installation of Boom and Arm Assembly
- 14.5. C5. Installation of Boom Cylinder Hoses
- 14.6. C6. Installation of Boom Cylinder Rod Pin
- 14.7. C7. Installation of Boom Cylinder
- 14.8. C8. Installation of Arm Cylinder Hoses
- 14.9. C9. Installation of Bucket Cylinder
- 14.10. C10. Installation of Bucket Cylinder Hose
- 14.11. C11. Installation of Connecting Hoses between Chassis and Boom Top
- 14.12. C12. Installation of Bottom Dump Cylinder Hoses
- 14.13. C13. Installation of Bucket Assembly
- 14.14. C14. Installation of Working Lamps
- 14.15. C15. Installation of Work Equipment Grease Piping
- 14.16. C16. Greasing After Assembling of Work Equipment
- 14.17. C17. Bleeding Air from Work Equipment Circuit
- 14.18. C18. Checking Oil Level in Hydraulic Tank and Adding Oil
- 14.19. C19. Replacement of Return Filter (Standard Filter to Flushing Filter)
- 14.20. C20. Flushing of Hydraulic Circuit
- 15. FIELD ASSEMBLY INSPECTION REPORT (Backhone)
- 16. FIELD ASSEMBLY INSPECTION REPORT (Loading Shovel)