Description
-
Model List:
- PC750-6 Hydraulic Excavator
- PC750SE-6 Hydraulic Excavator
- PC750LC-6 Hydraulic Excavator
- PC800-6 Hydraulic Excavator
- PC800SE-6 Hydraulic Excavator
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. FIELD ASSEMBLING
- 6. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
- 7. TRANSPORTATION
- 8. PACKING STYLE FOR TRANSPORTATION
- 9. LIST OF TOOLS FOR FIELD ASSEMBLING
- 10. STANDARD TIGHTENING TORQUE
- 11. ASSEMBLY OF BASE MACHINE
- 11.1. A1 FITTING OF LEFT AND RIGHT TRACK FRAMES
- 11.2. A2 ARRANGEMENT OF TRAVEL PIPE
- 11.3. A3 INSTALLATION OF FOG
- 11.4. A4 INSTALLATION OF RADIATOR COVER
- 11.5. A5 INSTALLATION OF REAR VIEW MIRROR
- 11.6. A6 INSTALLATION OF HANDRAIL
- 11.7. A7 INSTALLATION OF STEP
- 11.8. A8 INSTALLATION OF LEFT SIDE STEP
- 11.9. A9 SETTING OF MUFFLER TAIL TUBE
- 11.10. A10 STICKING SHEET (TO COUNTERWEIGHT)
- 11.11. A11 INSTALLATION OF COUNTERWEIGHT
- 11.12. A12 INSTALLATION OF RADIO ANTENNA
- 11.13. A13 INSTALLATION OF CAB TOP LIGHT
- 11.14. A14 SETTING OF TRAVEL PIPE COVER
- 11.15. A15 ADJUSTMENT OF TRACK TENSION
- 11.16. A15A EXTENSION OF TRACK FRAME GAUGE (ONLY WHEN 3SPLIT PACKAGES ARE TRANSPORTED)
- 11.17. A16 INSPECTION OF OIL AMOUNT AND WATER AMOUNT
- 12. ASSEMBLING OF WORK EQUIPMENT
- 12.1. B1 BOOM FOOT PIN, AND BOOM CYLINDER FOOT PIN
- 12.2. B2 BOOM ASSEMBLY
- 12.3. B3 RELIEVING REMAINING PRESSURE FROM HYDRAULIC CIRCUIT
- 12.4. B4 INSTALLATION OF BOOM CYLINDER FOOT
- 12.5. B5 ARRANGEMENT OF BOOM CYLINDER HOSE
- 12.6. B6 INSTALLATION OF BOOM CYLINDER
- 12.7. B7 INSTALLATION OF ARM CYLINDER
- 12.8. B8 ARRANGEMENT OF ARM CYLINDER HOSE
- 12.9. B9 INSTALLATION OF ARM ASSEMBLY
- 12.10. B10 ARRANGEMENT OF HOSE BETWEEN BOOM AND BUCKET CYLINDER
- 12.11. B11 INSTALLATION OF BUCKET ASSEMBLY
- 12.12. B12 LUBRICATION PIPING TO WORK EQUIPMENT
- 12.13. B13 AIR BLEEDING FROM CYLINDER
- 12.14. B14 WIRING OF WORK EQUIPMENT
- 12.15. B15 GREASING OF ASSEMBLED WORK EQUIPMENT
- 13. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
- 13.1. M1 INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
- 13.2. M2 REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
- 13.3. M3 FLUSHING OF HYDRAULIC CIRCUIT
- 14. ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL
- 14.1. CONTENTS
- 14.2. C1 RELEASEING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
- 14.3. C2 PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
- 14.4. C3 INSTALLATION OF BOOM AND ARM ASSEMBLY
- 14.5. C4 INSTALLATION OF FLUSHING PIPING BETWEEN CHASSIS AND BOOM
- 14.6. C5 INSTALLATION OF FLUSHING PIPING FOR BOOM CYLINDER AND ARM CYLINDER
- 14.7. C6 INSTALLATION OF FLUSHING PIPING FOR BUCKET CYLINDER
- 14.8. C7 INSTALLATION OF FLUSHING PIPING FOR BOTTOM DUMP CYLINDER
- 14.9. C8 INSTALLATION OF BOOM CYLINDER
- 14.10. C9 ISTALLATION OF BOOM CYLINDER FOOT
- 14.11. C10 INSTALLATION OF BOOM CYLINDER HOSES
- 14.12. C11 INSTALLATION OF BOOM CYLINDER ROD PIN
- 14.13. C12 INSTALLATION OF ARM CYLINDER HOSES
- 14.14. C13 INSTALLATION OF BUCKET CYLINDER
- 14.15. C14 INSTALLATION OF BUCKET CYLINDER HOSE
- 14.16. C15 INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
- 14.17. C16 INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
- 14.18. C17 INSTALLATION OF BUCKET ASSEMBLY
- 14.19. C18 INSTALLATION OF WORKING LAMPS
- 14.20. C19 INSTALLATION OF WORK EQUIPMENT FREASE PIPING
- 14.21. C20 GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
- 14.22. C21 BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
- 14.23. C22 FLUSHING OF WORK EQUIPMENT PIPING
- 14.24. C23 CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
- 15. FIELD ASSEMBLY INSPECTION REPORT
















Reviews