Description
-
Model List:
- PC800-8R Hydraulic Excavator
- PC800LC-8R Hydraulic Excavator
- PC800SE-8R Hydraulic Excavator
- PC850-8R Hydraulic Excavator
- PC850SE-8R Hydraulic Excavator
- 1. Cover
- 2. Foreword
- 3. Contents
- 4. Specifications
- 5. Precautions for Field Assembly
- 6. Disposal of Removed Parts
- 7. Assembling Procedures, Applicable Equipment and Schedule
- 8. Kit Layout Diagram
- 9. Transportation
- 10. List of Tools for Field Assembling
- 11. Tightening Torque
- 12. Coating Materials
- 13. Assembly of Chassis
- 13.1. A1 Installation of Left and Right Track Frames
- 13.2. A2 Installation of Travel Pipe
- 13.3. A3 Installation of Top Guard
- 13.4. A4 Installation of Radiator Cover
- 13.5. A5 Installation of Rearview Mirror
- 13.6. A6 Installation of Left Side Step
- 13.7. A7 Installation of Handrail
- 13.8. A8 Installation of Handrail (With top guard)
- 13.9. A9 Installation of Muffler Tail Tube
- 13.10. A10 Sticking Sheet to Counterweight
- 13.11. A11 Installation of Counterweight
- 13.12. A12 Installation of KOMTRAX Antenna (if equipped)
- 13.13. A13 Installation of Step Light
- 13.14. A14 Air Bleeding of Travel Motor
- 13.15. A15 Installation of Travel Piping Cover
- 13.16. A16 Testing Track Shoe Tension
- 13.17. A17 Check Fuel, Coolant and Oil Levels
- 13.18. A18 Parts to be Touched up after Field Assembly
- 14. Assembling of Work Equipment of Backhoe
- 14.1. B8 Installation of Quick Return Hose
- 14.2. B9 Installation of Boom Cylinder
- 14.3. B10 Installation of Arm Assembly
- 14.4. B11 Installation of Hose between Boom and Bucket Cylinder
- 14.5. B12 Installation of Bucket Assembly
- 14.6. B13 Lubrication Piping to Work Equipment
- 14.7. B14 Wiring of Work Equipment
- 14.8. B15 Greasing after Assembling Work Equipment
- 14.9. B16 Air Bleeding from Hydraulic Cylinder
- 15. Assembling of Work Equipment of Loading Shovel
- 15.1. C1 Releasing residual pressure in hydraulic circuit
- 15.2. C2 Pulling out boom foot pin and boom cylinder foot pin
- 15.3. C3 Installation of boom and arm assembly
- 15.4. C4 Installation of flushing piping between chassis and boom
- 15.5. C5 Installation of flushing piping for boom cylinder and arm cylinder
- 15.6. C6 Installation of flushing piping for bucket cylinder
- 15.7. C7 Installation of flushing piping for bottom dump cylinder
- 15.8. C8 Installation of boom cylinder
- 15.9. C9 Installation of boom cylinder foot
- 15.10. C10 Installation of boom cylinder hoses
- 15.11. C11 Installation of boom cylinder rod pin
- 15.12. C12 Installation of arm cylinder hoses
- 15.13. C13 Installation of bucket cylinder
- 15.14. C14 Installation of bucket cylinder hose
- 15.15. C15 Installation of connecting hoses between chassis and boom top
- 15.16. C16 Installation of bottom dump cylinder hoses
- 15.17. C17 Installation of bucket assembly
- 15.18. C18 Installation of working lamps
- 15.19. C19 Installation of work equipment grease piping
- 16. Procedure for Inspection and Maintenance after Completion of Assembly
- 16.1. M1 Inspection of Oil Level in Hydraulic Tank and Refill
- 16.2. M2 Replacement of Return Filter (Standard Filter to Flushing Filter)
- 16.3. M3 Flushing of Hydraulic Circuit
- 16.4. M4 Replacement of Return Filter (Flushing Filter to Standard Filter)
- 16.5. M5 Error Code
- 16.6. M6 Operating Method of Monitoring
- 17. Field Assembly Inspection Report (Backhoe)
- 18. Field Assembly Inspection Report (Loading Shovel)
















Reviews
There are no reviews yet.