Komatsu PC8000E-6 Hydraulic Mining Shovel Operation and Maintenance Manual 12086-xE-GB-0

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: 12086-xE-GB-0
  • Format: PDF
  • Size: 26.6MB
  • Number of Pages: 580

Description

  • Model List:

    • PC8000E-6 Hydraulic Mining Shovel
  • 1. FOREWORD
  • 1.1. BEFORE READING THIS MANUAL
  • 1.2. EC DECLARATION OF CONFORMITY
  • 1.3. PRIVACY POLICY ON MACHINES EQUIPPED WITH MACHINE MONITORING SYSTEMS
  • 1.4. RADIO WAVE REGULATIONS FOR KOMTRAX AND KOMTRAX PLUS
  • 1.5. DIRECTIONS OF THE MACHINE
  • 1.6. SPECIFICATION AND SERIAL PLATE
  • 1.7. DIVISION OF THE BINDER
  • 1.8. DESIGNATED USE OF THE SHOVEL
  • 1.9. DELIVERY OF THE SHOVEL
  • 1.10. EXPLANATION OF ABBREVIATIONS
  • 2. SAFETY
  • 2.1. SAFETY INFORMATION
  • 2.2. OVERVIEW
  • 2.3. SOUND PRESSURE AND VIBRATION LEVELS IN THE OPERATORS CAB.
  • 2.4. GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
  • 2.5. PRECAUTION FOR MAINTENANCE
  • 2.6. ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
  • 2.7. SPECIAL SAFETY EQUIPMENT
  • 2.8. HIGH VOLTAGE SAFETY INSTRUCTIONS FOR MACHINES WITH ELECTRIC MOTOR
  • 2.9. SAFETY WARNING SIGNS
  • 3. OPERATION
  • 3.1. FOREWORD
  • 3.2. CONSTRUCTION OF THE SHOVEL
  • 3.3. OPERATORS CAB CONTROLS
  • 3.4. Komtrax Plus VEHICLE HEALTH MONITOR
  • 3.5. CAMERA SYSTEM WITH MONITORS (SPECIAL EQUIPMENT)
  • 3.6. OPERATING THE HEATER, VENTILATION AND AIR CONDITIONING
  • 3.7. MACHINERY HOUSE
  • 3.8. MEDIUM VOLTAGE SWITCH CABINET IN CAB BASE
  • 3.9. PREHEATING SYSTEM
  • 3.10. CHECKS BEFORE STARTING THE MOTORS
  • 3.11. STARTING THE MAIN DRIVE MOTORS
  • 3.12. MOVING THE SHOVEL
  • 3.13. SLEWING AND BRAKING THE SUPERSTRUCTURE
  • 3.14. WORKING WITH THE ATTACHMENT
  • 3.15. WORKING INSTRUCTIONS
  • 3.16. PARKING THE SHOVEL
  • 3.17. PARKING THE SHOVEL
  • 3.18. STOPPING THE MAIN DRIVE MOTORS.
  • 3.19. OPERATION OF THE LUBRICATION SYSTEM
  • 3.20. FIRE DETECTION, ACTUATION AND SUPPRESSION SYSTEM.
  • 3.21. TRANSFER PUMP FOR HYDRAULIC OIL
  • 3.22. CENTRAL REFILLING SYSTEM
  • 3.23. SERVICE CRANE (SPECIAL EQUIPMENT)
  • 3.24. CABLE DRUM (SPECIAL EQUIPMENT)
  • 3.25. CABLE GUIDE (IF SO EQUIPPED)
  • 3.26. WORK ON THE LOADER ATTACHMENT
  • 3.27. TRANSPORTATION AND LIFTING OF THE SHOVEL
  • 3.28. RETRIEVAL PROCEDURE
  • 3.29. SHOVEL STORAGE
  • 3.30. TROUBLE SHOOTING
  • 4. MAINTENANCE
  • 4.1. FOREWORD
  • 4.2. PRECAUTIONS FOR MAINTENANCE
  • 4.3. FLUIDS AND LUBRICANTS
  • 4.4. FILLING CAPACITIES
  • 4.5. STANDARD TORQUE LIST
  • 4.6. LUBRICATION AND MAINTENANCE SCHEDULE
  • 4.7. SAFETY CRITICAL PARTS
  • 4.8. FIRST SERVICING
  • 4.9. WHEN NECESSARY
  • 4.10. EVERY 10 OPERATING HOURS OR DAILY
  • 4.11. EVERY 50 OPERATING HOURS OR WEEKLY.
  • 4.12. EVERY 250 OPERATING HOURS OR MONTHLY
  • 4.13. EVERY 500 OPERATING HOURS OR MONTHLY
  • 4.14. EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH
  • 4.15. EVERY 2000 OPERATING HOURS OR YEARLY
  • 4.16. EVERY 3000 OPERATING HOURS HOWEVER AT LEAST ONCE A YEAR
  • 4.17. CRITICAL BOLT CONNECTIONS EVERY 3000 OPERATING HOURS
  • 4.18. EVERY 6000 OPERATING HOURS OR ONCE A YEAR
  • 4.19. FIRE PREVENTION
  • 4.20. WELD REPAIRS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC8000E-6 Hydraulic Mining Shovel Operation and Maintenance Manual 12086-xE-GB-0”

Your email address will not be published. Required fields are marked *