Description
-
Model List:
- PC850-8R1 Hydraulic Excavator
- 1. Cover
- 2. Introduction
- 3. Items to be performed before assembly
- 4. Items to be performed during assembly
- 5. Items to be performed after assembly
- 6. Install attachment hoses between chassis and boom
- 7. Install bucket cylinder hoses
- 8. Install attachment hoses between boom and arm
- 9. Hose fitting size for attachment piping
- 10. Adjustment method for flow control sleeve
- 11. Adjustment method for attachment circuit relief pressure
- 12. Maintenance procedure after completion of assembly
- 13. Check sheet for field assembly
















Reviews
There are no reviews yet.