Description
-
Model List:
- PC850-8R1 Hydraulic Excavator
- 1. COVER
- 2. Contents
- 3. Introduction
- 4. Items to be performed before assembly
- 5. Items to be performed during assembly
- 6. Items to be performed after assembly
- 7. Remove and install largesized components
- 8. Replace spring box and install relief valve, flow control sleeve, etc.
- 9. Install attachment shuttle valve
- 10. Install block to hydraulic tank
- 11. Install check valve drain port
- 12. Add cutout to floor mat
- 13. Install relay (in cab), wiring harness, and attachment pedal
- 14. Replace junction block and PPC hoses
- 15. Install wiring harness (on chassis side)
- 16. Install attachment tower bracket
- 17. Install PPC hose clamp
- 18. Change quick return circuit to attachment specification
- 19. Install bucket HI piping
- 20. Install parts for attachment and drain
- 21. Modify boom to attachment and drain specification
- 22. Modify arm to attachment and drain specification
- 23. Install hoses between chassis and boom attachment and drain
- 24. Install bucket cylinder hoses
- 25. Install attachment hoses between boom and arm
- 26. Piping fitting size for attachment
- 27. Adjustment method for flow control sleeve
- 28. Adjustment method for attachment circuit relief pressure
- 29. Maintenance procedure after completion of assembly
- 30. Check sheet for field assembly
















Reviews
There are no reviews yet.