JCB JS115, JS130, JS130LC, JS145, JS160, JS180, JS190, JS200, JS235, JS240, JS260, JS330 Operator Manual

$20.00

  • Type Of Manual: Operator Manual
  • Number of Pages: 236
  • Size: 21.0MB
  • Format: PDF

Description

  • Model List:

    • JS115, JS130, JS130LC, JS145, JS160, JS180, JS190, JS200, JS235, JS240, JS260, JS330
  • 1. Safety Notices
  • 2. Introduction ……………………………………………………………………………………….1
  • 3. Introduction
  • 4. About this Operator Manual …………………………………………………………………3
  • 5. Machine Model and Serial Number ………………………………………………….3
  • 6. Using this Manual ………………………………………………………………………….3
  • 7. Units of Measurement ……………………………………………………………………3
  • 8. Left Side, Right Side ………………………………………………………………………3
  • 9. Using the Machine …………………………………………………………………………3
  • 10. Cross References ………………………………………………………………………….3
  • 11. Machine Description …………………………………………………………………………..4
  • 12. The JCB Tracked Excavator ……………………………………………………………4
  • 13. Safety Check List ……………………………………………………………………………….6
  • 14. Safety – Yours and Others ………………………………………………………………6
  • 15. General Safety ……………………………………………………………………………..6
  • 16. Operating Safety …………………………………………………………………………..7
  • 17. Maintenance Safety ……………………………………………………………………..10
  • 18. Safety Decals ……………………………………………………………………………..15
  • 19. Identifying Your Machine …………………………………………………………………..21
  • 20. Data Plate …………………………………………………………………………………..21
  • 21. Typical Product Identification Number (PIN) ……………………………………21
  • 22. Typical Engine Identification Number ……………………………………………..21
  • 23. Machine Security ……………………………………………………………………………..22
  • 24. JCB Plantguard …………………………………………………………………………..22
  • 25. Operation
  • 26. Introduction ……………………………………………………………………………………..23
  • 27. Before Entering the Cab ……………………………………………………………………24
  • 28. Entering and Leaving the Cab ……………………………………………………………25
  • 29. Entering the Cab …………………………………………………………………………25
  • 30. Leaving the Cab ………………………………………………………………………….25
  • 31. Doors and Windows …………………………………………………………………………26
  • 32. Opening and Closing the Door ………………………………………………………26
  • 33. Opening and Closing the Front Upper Window ………………………………..26
  • 34. Opening and Closing The Front Lower Window ……………………………….27
  • 35. Door Sliding Window. …………………………………………………………………..27
  • 36. Opening and Closing the Sunblind …………………………………………………28
  • 37. Emergency Exit …………………………………………………………………………..28
  • 38. Seat Controls …………………………………………………………………………………..29
  • 39. Operators Seat-Console ……………………………………………………………….29
  • 40. Operators Seat – Standard-Heated …………………………………………………29
  • 41. Air Suspension Seat …………………………………………………………………….30
  • 42. Seat Belts (if fitted) …………………………………………………………………………..31
  • 43. Static Seat Belt ……………………………………………………………………………31
  • 44. Cab Layout ……………………………………………………………………………………..32
  • 45. Location of Controls and Components ……………………………………………32
  • 46. Driver Controls and Switches …………………………………………………………….34
  • 47. Right Console ……………………………………………………………………………..34
  • 48. Left Console ……………………………………………………………………………….36
  • 49. Monitor Panel ……………………………………………………………………………..37
  • 50. Fascia Panel ……………………………………………………………………………….42
  • 51. Emergency back-up switch …………………………………………………………..43
  • 52. Heater-Air Conditioning Controls ……………………………………………………44
  • 53. Cab Interior Lights ……………………………………………………………………….45
  • 54. Radio (If Fitted) ……………………………………………………………………………45
  • 55. Operating Levers-Pedals …………………………………………………………………..46
  • 56. Travel Levers ………………………………………………………………………………46
  • 57. Travel Speed Change Button ………………………………………………………..46
  • 58. Operation Levers …………………………………………………………………………47
  • 59. Optional Circuit Pedal (if fitted) ………………………………………………………47
  • 60. ISO Operating Method …………………………………………………………………47
  • 61. Overload Protection ………………………………………………………………………….48
  • 62. Overload Warning System …………………………………………………………….48
  • 63. Safety Equipment …………………………………………………………………………….49
  • 64. Servo Controls Immobilisation ……………………………………………………….49
  • 65. Mirrors ……………………………………………………………………………………….50
  • 66. Fire Extinguisher (If fitted) …………………………………………………………….51
  • 67. Dipper Stroke Limiter (if fitted) ……………………………………………………….52
  • 68. Before Starting the Engine …………………………………………………………………54
  • 69. Starting the Engine …………………………………………………………………………..55
  • 70. Warming-Up ……………………………………………………………………………….56
  • 71. Stopping and Parking the Machine ……………………………………………………..57
  • 72. Stopping and Parking …………………………………………………………………..57
  • 73. Emergency Stopping of the Engine ………………………………………………..58
  • 74. Operating Environment ……………………………………………………………………..59
  • 75. Operating in Cold Climates …………………………………………………………..59
  • 76. Operating in a Cold Climate (Below 0°C) ………………………………………..59
  • 77. Operating in a Hot Climate (Above 35°C) ……………………………………….59
  • 78. Operating in Dusty or Sandy Areas ………………………………………………..60
  • 79. Operating in Coastal Regions ……………………………………………………….60
  • 80. Operating on Wet or Soft Ground …………………………………………………..60
  • 81. Working with your Machine ……………………………………………………………….61
  • 82. Operating Practices and Site Safety ………………………………………………61
  • 83. Travel Mode ………………………………………………………………………………..64
  • 84. Reversing …………………………………………………………………………………..65
  • 85. Travelling on Slopes …………………………………………………………………….65
  • 86. Working on Slopes ………………………………………………………………………66
  • 87. Digging on Slopes ……………………………………………………………………….67
  • 88. Slewing ………………………………………………………………………………………67
  • 89. Excavating Controls …………………………………………………………………….68
  • 90. Bucket ……………………………………………………………………………………….74
  • 91. Digging ………………………………………………………………………………………78
  • 92. Dumping into a Truck …………………………………………………………………..78
  • 93. Backfilling …………………………………………………………………………………..78
  • 94. Pulling out of Soft Ground …………………………………………………………….78
  • 95. Lifting …………………………………………………………………………………………80
  • 96. Refuelling ……………………………………………………………………………………….81
  • 97. Fuel Level …………………………………………………………………………………..81
  • 98. Filling the Tank ……………………………………………………………………………81
  • 99. Petrol …………………………………………………………………………………………81
  • 100. Refuelling Pump – Early Machines …………………………………………………81
  • 101. Refuelling Pump – Later Machines …………………………………………………82
  • 102. Moving a Disabled Machine ………………………………………………………………83
  • 103. Limp Mode ………………………………………………………………………………….83
  • 104. Mechanical Engine RPM Override …………………………………………………83
  • 105. Transporting the Machine ………………………………………………………………….84
  • 106. Lifting the Machine …………………………………………………………………………..86
  • 107. JS115 – JS260 Machines ………………………………………………………………86
  • 108. JS330 Machine ……………………………………………………………………………87
  • 109. Storage …………………………………………………………………………………………..88
  • 110. Storage Sites ………………………………………………………………………………88
  • 111. Putting into Storage ……………………………………………………………………..88
  • 112. During Storage ……………………………………………………………………………88
  • 113. Taking Out of Storage …………………………………………………………………..88
  • 114. Anti-Vandalism Guards (option) ………………………………………………………….89
  • 115. Unpacking the Guards ………………………………………………………………….89
  • 116. Fitting the Guards ………………………………………………………………………..89
  • 117. Removing the Guards ………………………………………………………………….90
  • 118. Storing the Guards ………………………………………………………………………90
  • 119. Routine Maintenance
  • 120. Service Requirements ………………………………………………………………………91
  • 121. Introduction …………………………………………………………………………………91
  • 122. Owner-Operator Support ………………………………………………………………91
  • 123. Service-Maintenance Agreements …………………………………………………91
  • 124. Obtaining Replacement Parts ………………………………………………………..91
  • 125. Lifting Regulations – Inspections and Tests ……………………………………..92
  • 126. Health and Safety …………………………………………………………………………….93
  • 127. Lubricants …………………………………………………………………………………..93
  • 128. Battery ……………………………………………………………………………………….95
  • 129. First Aid – Electrolyte ……………………………………………………………………95
  • 130. Service Schedules ……………………………………………………………………………97
  • 131. Introduction …………………………………………………………………………………97
  • 132. How to Use the Service Schedules ………………………………………………..97
  • 133. Pre Start Cold Checks, Service Points and Fluid Levels ……………………98
  • 134. Functional Test and Final Inspection …………………………………………….101
  • 135. Service Intervals for Attachments …………………………………………………102
  • 136. Periodic Replacement of Safety Related Components ……………………103
  • 137. Lubricants and Capacities ……………………………………………………………….104
  • 138. JS115 – JS145 and Variants ………………………………………………………..104
  • 139. JS160 – JS190 and Variants ………………………………………………………..105
  • 140. JS200 – JS235HD and Variants ……………………………………………………106
  • 141. JS240-260 and Variants ……………………………………………………………..107
  • 142. JS330 and Variants ……………………………………………………………………108
  • 143. Engine Lubrication Chart …………………………………………………………….109
  • 144. Hydraulic Oil Chart …………………………………………………………………….109
  • 145. Cleaning the Machine …………………………………………………………………….. 110
  • 146. Exterior ……………………………………………………………………………………. 110
  • 147. Interior …………………………………………………………………………………….. 110
  • 148. Checking for Damage …………………………………………………………………….. 111
  • 149. Daily Checking ………………………………………………………………………………. 112
  • 150. Bolt and Nut Torque Specifications …………………………………………………… 115
  • 151. JS115 – JS330 and Variants ……………………………………………………….. 115
  • 152. Checking the FOPS Structure ………………………………………………………….123
  • 153. Cab Mounted …………………………………………………………………………….123
  • 154. Frame Mounted …………………………………………………………………………123
  • 155. Seat Belt ……………………………………………………………………………………….124
  • 156. Checking the Seat Belt Condition and Security ………………………………124
  • 157. Greasing ……………………………………………………………………………………….125
  • 158. General Notes …………………………………………………………………………..125
  • 159. Slew Ring Bearing ……………………………………………………………………..125
  • 160. Slew Ring Teeth and Slew Pinion …………………………………………………125
  • 161. Greasing Points …………………………………………………………………………126
  • 162. Electrical System ……………………………………………………………………………128
  • 163. Battery ……………………………………………………………………………………..128
  • 164. Jump-Starting the Engine ……………………………………………………………130
  • 165. Fuses ……………………………………………………………………………………….131
  • 166. Engine ………………………………………………………………………………………….132
  • 167. Checking the Oil Level ……………………………………………………………….132
  • 168. Changing the Oil and Filter ………………………………………………………….132
  • 169. Changing the Outer Air Filter Element ………………………………………….134
  • 170. Changing the Inner Air Filter Element …………………………………………..135
  • 171. Checking the Fan Belt Tension …………………………………………………….136
  • 172. Fitting a New Fan Belt ………………………………………………………………..136
  • 173. Checking the Coolant Level ………………………………………………………..137
  • 174. Cleaning the Radiator and Oil Cooler ……………………………………………137
  • 175. Changing The Coolant ……………………………………………………………….138
  • 176. Coolant Mixtures ……………………………………………………………………….138
  • 177. Fuel System …………………………………………………………………………………..140
  • 178. Types of Fuel …………………………………………………………………………….140
  • 179. Filling the Tank and Fuel Level Checking ………………………………………141
  • 180. Petrol ……………………………………………………………………………………….141
  • 181. Changing the Fuel Filter Element …………………………………………………142
  • 182. Cleaning the Lift Pump Strainer ……………………………………………………142
  • 183. Draining Fuel Tank Impurities ………………………………………………………143
  • 184. Draining the Water Separator – early models …………………………………144
  • 185. Cleaning the Water Separator – early models ………………………………..144
  • 186. Draining the Water Separator and Engine Fuel Filter – later models ….145
  • 187. Changing the Water Separator Filter – later models ………………………..145
  • 188. Bleeding the Fuel System …………………………………………………………..146
  • 189. Hydraulic System ……………………………………………………………………………147
  • 190. Checking the Fluid Level …………………………………………………………….147
  • 191. Releasing Tank Pressure ……………………………………………………………148
  • 192. Topping-up Fluid Level ……………………………………………………………….148
  • 193. Changing the Fluid …………………………………………………………………….149
  • 194. Draining Water and Sediment from the Hydraulic Tank ……………………149
  • 195. Cleaning-Changing the Suction Strainer ……………………………………….150
  • 196. Changing the Return Filter ………………………………………………………….150
  • 197. Changing the Plexus Filter ………………………………………………………….151
  • 198. Changing the Air Breather Element ………………………………………………152
  • 199. Changing the Pilot Oil Filter …………………………………………………………153
  • 200. Changing the Breaker In-line Filter ……………………………………………….154
  • 201. Changing the Drain Line Filter ……………………………………………………..154
  • 202. Checking the Slew Gearbox Oil Level …………………………………………..155
  • 203. Changing the Slew Gearbox Oil Level ………………………………………….155
  • 204. Air Bleeding Procedures ……………………………………………………………..156
  • 205. Travel Gearbox ………………………………………………………………………………158
  • 206. Checking the Track Gearbox Oil Level ………………………………………….158
  • 207. Changing the Track Gearbox Oil ………………………………………………….158
  • 208. Tracks and Running Gear ……………………………………………………………….159
  • 209. Cleaning the Tracks ……………………………………………………………………159
  • 210. Checking-Adjusting the Track Tension ………………………………………….159
  • 211. Checking Rollers and Idler Wheels for Oil Leaks ……………………………160
  • 212. Track Plate Inspection ………………………………………………………………..161
  • 213. Bucket ………………………………………………………………………………………….162
  • 214. Checking-Adjusting for side play ………………………………………………….162
  • 215. Windscreen ……………………………………………………………………………………163
  • 216. Washers …………………………………………………………………………………..163
  • 217. Troubleshooting ……………………………………………………………………………..164
  • 218. Engine and Related Area ……………………………………………………………164
  • 219. Monitor Display – Fault Messages ………………………………………………..167
  • 220. Operations ………………………………………………………………………………..168
  • 221. Hydraulic pump …………………………………………………………………………169
  • 222. Working Attachments …………………………………………………………………170
  • 223. Travel ……………………………………………………………………………………….171
  • 224. Slew …………………………………………………………………………………………172
  • 225. Hydraulic ram ……………………………………………………………………………172
  • 226. Optional Attachments
  • 227. Introduction ……………………………………………………………………………………173
  • 228. Attachments For Your Machine ……………………………………………………173
  • 229. Operating Attachments ……………………………………………………………………174
  • 230. Hydraulic Rockbreaker ……………………………………………………………………177
  • 231. Preparation ……………………………………………………………………………….177
  • 232. Operation and Maintenance ………………………………………………………..177
  • 233. Hammer Speed Settings …………………………………………………………….178
  • 234. Crusher …………………………………………………………………………………………181
  • 235. General …………………………………………………………………………………….181
  • 236. Preparation ……………………………………………………………………………….181
  • 237. Weedcutter ……………………………………………………………………………………182
  • 238. Operation ………………………………………………………………………………….182
  • 239. Maintenance ……………………………………………………………………………..182
  • 240. Specifications
  • 241. Static Dimensions …………………………………………………………………………..183
  • 242. JS115 – Monoboom ……………………………………………………………………183
  • 243. JS130LC – Monoboom ……………………………………………………………….184
  • 244. JS130 – Monoboom ……………………………………………………………………185
  • 245. JS130 – Triple Articulated Boom …………………………………………………..186
  • 246. JS145 – Monoboom ……………………………………………………………………187
  • 247. JS145 – Triple Articulated Boom …………………………………………………..188
  • 248. JS160 – Monoboom ……………………………………………………………………189
  • 249. JS160 – Triple Articulated Boom …………………………………………………..190
  • 250. JS180-190 – Monoboom ……………………………………………………………..191
  • 251. JS180-190 – Triple Articulated Boom …………………………………………….192
  • 252. JS200-210-220 – Monoboom ……………………………………………………….193
  • 253. JS200-210-220 – Triple Articulated Boom ………………………………………194
  • 254. JS235 – Monoboom ……………………………………………………………………195
  • 255. JS235 – Triple Articulated Boom …………………………………………………..196
  • 256. JS240-260 – Monoboom ……………………………………………………………..197
  • 257. JS240-260 – Triple Articulated Boom …………………………………………….198
  • 258. JS330 – Monoboom ……………………………………………………………………199
  • 259. JS220-260 – Long Reach (LR) ……………………………………………………..200
  • 260. Shipping Weight …………………………………………………………………………….201
  • 261. Lifting (Craning) Regulations and Safe Working Loads ………………………..203
  • 262. Lifting Regulations ……………………………………………………………………..203
  • 263. Safe Working Loads …………………………………………………………………..203
  • 264. Dig Depth Chart ……………………………………………………………………………..204
  • 265. JS115 – Monoboom ……………………………………………………………………204
  • 266. JS130LC – Monoboom ……………………………………………………………….205
  • 267. JS130 – Monoboom ……………………………………………………………………206
  • 268. JS130 – Triple Articulated Boom …………………………………………………..207
  • 269. JS145 – Monoboom ……………………………………………………………………208
  • 270. JS145 – Triple Articulated Boom …………………………………………………..209
  • 271. JS160 – Monoboom ……………………………………………………………………210
  • 272. JS160 – Triple Articulated Boom ………………………………………………….. 211
  • 273. JS180-190 – Monoboom ……………………………………………………………..212
  • 274. JS180-190 – Triple Articulated Boom …………………………………………….213
  • 275. JS200-210-220 – Monoboom ……………………………………………………….214
  • 276. JS200-210-220 – Triple Articulated Boom ………………………………………215
  • 277. JS220-260LR – Long Reach ………………………………………………………..216
  • 278. JS235HD – Monoboom ……………………………………………………………….217
  • 279. JS235HD – Triple Articulated Boom ………………………………………………218
  • 280. JS240-260 – Monoboom ……………………………………………………………..219
  • 281. JS240-260 – Triple Articulated Boom …………………………………………….220
  • 282. JS330 – Monoboom ……………………………………………………………………221
  • 283. Noise Data …………………………………………………………………………………….222
  • 284. Vibration Data ………………………………………………………………………………..223
  • 285. Introduction ……………………………………………………………………………….223
  • 286. JS115-180 ………………………………………………………………………………..224
  • 287. JS190-210 ………………………………………………………………………………..225
Rate this product
Reviews

There are no reviews yet.

Be the first to review “JCB JS115, JS130, JS130LC, JS145, JS160, JS180, JS190, JS200, JS235, JS240, JS260, JS330 Operator Manual”

Your email address will not be published. Required fields are marked *