Description
-
Model List:
- 830E-5 Dump Truck
- 1. TITLE PAGE
- 2. FOREWORD
- 3. TABLE OF CONTENTS
- 4. SAFETY RULES, TOOLS EQUIPMENT
- 5. TRUCK COMPONENTS AND SPECIFICATIONS
- 6. MAJOR COMPONENT WEIGHTS
- 7. FIELD WELDING FOR ASSEMBLY OR REPAIR
- 8. RECEIVING ASSEMBLY PREPARATION
- 9. CHASSIS ASSEMBLY
- 10. DUMP BODY ASSEMBLY
- 11. FINAL ASSEMBLY
- 12. FINAL CHECKOUT
- 13. APPENDIX
- 13.1. STANDARD TORQUE CHARTS AND CONVERSION TABLES
- 13.2. SUSPENSION OILING AND CHARGING PROCEDURES
- 13.3. SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
- 13.4. OIL AND NITROGEN SPECIFICATIONS CHART
- 13.5. FAN CLUTCH CHECKOUT PROCEDURE
- 13.6. ENGINE EMISSIONS AFTERTREATMENT SYSTEMS (IF EQUIPPED)
- 13.7. TOEIN ADJUSTMENT
- 13.8. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
- 13.9. ELECTRIC CHECKOUT PROCEDURE
- 13.10. INTERFACE MODULE CHECKOUT PROCEDURE
- 13.11. ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
- 13.12. HYDRAULIC SYSTEM CHECKOUT
- 13.13. BRAKE PRESHIFT TEST CHECKOUT PROCEDURE
- 13.14. BRAKE SYSTEM CHECKOUT
- 13.15. AUTOMATIC LUBRICATION SYSTEM
- 13.16. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
- 13.17. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
- 13.18. TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
- 13.19. PAYLOAD METER IV CHECKOUT PROCEDURE
- 13.20. ALTERNATOR LOCK CHECKOUT PROCEDURE
- 13.21. KOMTRAX PLUS 2 SHOP SETUP CHECKOUT PROCEDURE
- 13.22. KOMTRAX PLUS 2 SITE SETUP CHECKOUT PROCEDURE
- 13.23. KOMVISION CHECKOUT PROCEDURE
- 13.24. KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
- 13.25. RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
- 13.26. FIELD ASSEMBLY INSPECTION REPORT
- 13.27. HOUR POSTCOMMISSIONING CHECKSHEET
















There are no reviews yet.