Komatsu 930E-4SE Dump Truck Field Assembly Instruction CEAW007011

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: CEAW007011
  • Format: PDF
  • Size: 9.2MB
  • Number of Pages: 308

Description

  • Model List:

    • 930E-4SE Dump Truck
  • 1. FOREWORD
  • 2. TABLE OF CONTENTS
  • 3. SAFETY RULES, TOOLS EQUIPMENT
  • 3.1. SAFETY RULES
  • 3.2. KOMVISION CALIBRATION TOOLS
  • 3.3. HIGH VOLTAGE TOOLS
  • 3.3.1. VDC CUSTOM METER KIT (58B0600800)
  • 3.3.2. BODY PAD SPACER TOOL
  • 4. TRUCK COMPONENTS AND SPECIFICATIONS
  • 4.1. SPECIFICATIONS
  • 4.2. WEIGHT DISTRIBUTION
  • 5. MAJOR COMPONENT WEIGHTS
  • 5.1. REAR AXLE COMPONENTS
  • 6. FIELD WELDING FOR ASSEMBLY OR REPAIR
  • 6.1. WELDER QUALIFICATION AND TRAINING
  • 6.2. WELD PROCEDURES
  • 6.3. APPROVED CONSUMABLES
  • 6.4. WELD QUALITY REQUIREMENTS
  • 6.5. MATERIALS, CONTROLS, AND PRECAUTIONS
  • 6.5.1. WELD INSPECTION
  • 6.5.2. RECORDS
  • 6.5.3. ANNEX A
  • 6.5.4. ANNEX B
  • 6.5.5. BIBLIOGRAPHY
  • 6.6. SPECIAL PRECAUTIONS WHEN SERVICING AN AC DRIVE SYSTEM TRUCK
  • 7. RECEIVING ASSEMBLY PREPARATION
  • 7.1. Preparation
  • 7.2. ASSEMBLY LAYOUT
  • 8. CHASSIS ASSEMBLY
  • 8.1. RECOMMENDED ASSEMBLY DATA
  • 8.2. BASIC ASSEMBLY PROCEDURE
  • 8.3. ORDER OF ASSEMBLY
  • 8.4. CHASSIS ASSEMBLY
  • 8.4.1. HARDWARE TIGHTENING METHOD
  • 8.4.2. GENERAL PRECAUTIONS AND INSTRUCTION
  • 8.4.3. HYDRAULIC SYSTEM FLUSHING PROCEDURE
  • 8.4.4. Before Starting the Engine
  • 9. DUMP BODY ASSEMBLY
  • 9.1. GENERAL INFORMATION
  • 9.2. LUBRICATION CHART
  • 9.3. STANDARD TORQUE CHARTS AND CONVERSION TABLES
  • 9.3.1. GENERAL DESCRIPTION
  • 9.3.2. EFFECT OF SPECIAL LUBRICANTS On Fasteners and Standard Torque Values
  • 9.3.3. STANDARD ASSEMBLY TORQUES Grade 9 Capscrews (SAE)
  • 9.3.4. STANDARD ASSEMBLY TORQUES For Class 10.9 Capscrews and Class 10 Nuts
  • 9.4. TOEIN ADJUSTMENT PROCEDURE
  • 9.5. SUSPENSION OILING AND CHARGING PROCEDURE
  • 9.5.1. GENERAL
  • 9.5.2. Front Suspension
  • 9.5.3. Rear Suspension
  • 9.6. OIL AND NITROGEN SPECIFICATIONS CHART
  • 9.7. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
  • 9.7.1. Lincoln Flow Master Phase 1 Auto Lube System With Fixed Hydraulic Controls
  • 9.7.2. Lube Pump Startup / Purging Procedure
  • 9.7.3. Truck Lube System Purging Procedure
  • 9.7.4. Adjust Injector Settings
  • 9.7.5. Timer
  • 9.7.6. Warning System
  • 9.8. RESERVE OIL SYSTEM CHECKOUT PROCEDURE
  • 9.9. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
  • 9.10. HYDRAULIC SYSTEM CHECKOUT PROCEDURE
  • 9.10.1. Scope of Checkout Procedure
  • 9.10.2. Data to be Recorded
  • 9.10.3. Required Software
  • 9.10.4. PreCheckout Items
  • 9.10.5. Procedure for Bleeding Down Hydraulic Brake and Steering Accumulators
  • 9.10.6. Accumulator Precharge Procedure
  • 9.10.7. Pressure Gauge Installation
  • 9.10.8. Initial StartUp and Flushing
  • 9.10.9. Steering System Checkout and Adjustment
  • 9.10.10. Steering Pump with Unloader Valve Adjustment
  • 9.10.11. Hoist System Checkout and Adjustment
  • 9.10.12. Hoist Counterbalance Valve Adjustment
  • 9.10.13. Counterbalance Valve Setting Check
  • 9.10.14. Oil Cleanliness Check
  • 9.10.15. Hydraulic System Checkout Data Sheet
  • 9.10.15.1. Accumulator Precharge procedure
  • 9.10.15.2. Initial Startup and Flushing
  • 9.10.15.3. Steering System Checkout and Adjustment
  • 9.10.15.4. Steering Pump with Unloader Valve Adjustment
  • 9.10.15.5. Steering System Diagnostic and Verification
  • 9.10.15.6. Hoist System Checkout and Adjustment
  • 9.10.15.7. Hoist Counterbalance Valve Adjustment
  • 9.10.15.8. Oil Cleanliness Check
  • 9.11. HYDRAULIC BRAKE SYSTEM CHECKOUT PROCEDURE
  • 9.11.1. Scope of Checkout Procedure
  • 9.11.2. Purpose of Checkout Procedure
  • 9.11.3. Required Software
  • 9.11.4. Necessary Equipment
  • 9.11.5. PreCheckout Items
  • 9.11.6. Bleed Down Procedure
  • 9.11.7. Checkout Procedure Setup
  • 9.11.8. Initial Startup and Service Brake Checks
  • 9.11.9. Brake Lock System Check
  • 9.11.10. Parking Brake System
  • 9.11.11. Low Brake Pressure and Auto Apply
  • 9.11.12. Brake Reapplications (Stored Energy Check)
  • 9.11.13. Park Brake Control Logic Check
  • 9.11.14. Brake Lock Control Logic Check
  • 9.11.15. The Brake System Checkout Data Sheet follows
  • 9.11.16. T Brake System Checkout Data Sheet
  • 9.11.16.1. Brake Lock System
  • 9.11.16.2. Park Brake System
  • 9.11.16.3. Low Brake Pressure and Auto Apply
  • 9.11.16.4. Brake Reapplications
  • 9.11.16.5. Park Brake Control Logic Check
  • 9.11.16.6. Brake Lock Control Logic Check
  • 9.12. BRAKE TEST CHECKOUT PROCEDURE
  • 9.13. REAR AXLE COOLING AIR PRESSURE SWITCH ADJUSTMENT AND TEST
  • 9.14. KOMTRAX PLUS SETUP PROCEDURE
  • 9.14.1. Purpose
  • 9.14.2. Preliminary Procedures
  • 9.14.3. Necessary Equipment
  • 9.14.4. Check for KOMTRAX Plus System Faults
  • 9.15. KOMTRAX Plus Setup
  • 9.15.1. Begin KOMTRAX Plus Setup
  • 9.16. KOMTRAX PLUS CHECKOUT PROCEDURE
  • 9.16.1. Purpose
  • 9.16.2. Preliminary Procedures
  • 9.16.3. Necessary Equipment
  • 9.16.4. Check for KOMTRAX Plus System Faults
  • 9.16.5. Checkout Procedure
  • 9.17. PAYLOAD METER IV CHECKOUT PROCEDURE
  • 9.17.1. Appendix A
  • 9.17.2. Appendix B
  • 9.17.3. Appendix C
  • 9.17.4. Payload Meter IV Checkout Procedure Confirmation
  • 9.18. ELECTRICAL SYSTEM CHECKOUT PROCEDURE
  • 9.18.1. General Description
  • 9.18.2. Welding and Safety Procedures
  • 9.18.3. AC System Description
  • 9.18.4. Resistance Checks
  • 9.18.5. Megger Preparation and Testing
  • 9.18.6. Control System Checkout
  • 9.18.7. IM System Checkout
  • 9.18.8. Drive System Initial Checkout
  • 9.18.9. Hydraulic System Checkout
  • 9.18.10. Drive System Checkout
  • 9.19. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
  • 9.19.1. GENERAL DESCRIPTION
  • 9.20. INTERFACE MODULE CHECKOUT PROCEDURE 930E WITH ACTIA
  • 9.20.1. Purpose
  • 9.20.2. Necessary Equipment
  • 9.20.3. Install the Application Code
  • 9.20.4. How to Use the IM Realtime Data Monitor Software
  • 9.20.5. Check for Fault Codes Associated With the Interface Module
  • 9.20.6. Interface Module I/O
  • 9.20.6.1. S/N ___________________ IM Installation Checkout Checklist
  • 9.21. KOMVISION CHECKOUT PROCEDURE
  • 9.21.1. STEP 1 Settings
  • 9.22. WIRELESS BRIDGE CHECKOUT PROCEDURE
  • 9.23. FIELD ASSEMBLY INSPECTION REPORT
  • 9.24. HOUR POSTCOMMISSIONING CHECKSHEET
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu 930E-4SE Dump Truck Field Assembly Instruction CEAW007011”

Your email address will not be published. Required fields are marked *