Description
-
Model List:
- 980E-5 Dump Truck
- 1. FOREWORD
- 2. TABLE OF CONTENTS
- 3. SAFETY RULES, TOOLS EQUIPMENT
- 3.1. SAFETY RULES
- 3.2. BODYUP RETENTION SLING
- 3.3. LIFTING SLING GENERAL INFORMATION
- 3.4. HEATED EXHAUST TOOL (IF EQUIPPED)
- 3.5. KomVision Calibration Tools (IF EQUIPPED)
- 3.6. HIGH VOLTAGE TOOLS
- 3.7. VDC CUSTOM METER KIT (58B0600800)
- 3.8. MISCELLANEOUS COMPONENTS
- 3.9. BODY PAD SPACER TOOL
- 4. TRUCK COMPONENTS AND SPECIFICATIONS
- 4.1. Selective Catalytic Reduction (SCR)
- 4.2. Diesel Exhaust Fluid (DEF)
- 4.3. SPECIFICATIONS
- 5. MAJOR COMPONENT WEIGHTS
- 5.1. REAR AXLE COMPONENTS
- 6. FIELD WELDING FOR ASSEMBLY OR REPAIR
- 6.1. WELDER QUALIFICATION AND TRAINING
- 6.2. WELD PROCEDURES
- 6.3. APPROVED CONSUMABLES
- 6.4. WELD QUALITY REQUIREMENTS
- 6.5. MATERIALS, CONTROLS, AND PRECAUTIONS
- 6.6. WELD INSPECTION
- 6.7. RECORDS
- 6.8. ANNEX A
- 6.9. ANNEX B
- 6.10. BIBLIOGRAPHY
- 6.11. SPECIAL PRECAUTIONS WHEN SERVICING AN AC DRIVE SYSTEM TRUCK
- 6.12. Engine Shutdown Procedure Before Welding Or Performing Maintenance
- 6.13. Before Welding On The Machine, Obey The Following Guidelines
- 7. RECEIVING ASSEMBLY PREPARATION
- 7.1. Preparation
- 7.2. Coded Boxes
- 7.3. ASSEMBLY LAYOUT
- 8. CHASSIS ASSEMBLY
- 8.1. CHASSIS AND COMPONENT SERIAL NUMBER (SN) IDENTIFICATION
- 9. DUMP BODY ASSEMBLY
- 10. FINAL ASSEMBLY
- 11. FINAL CHECKOUT
- 12. APPENDIX
- 12.1. STANDARD TORQUE CHARTS AND CONVERSION TABLES
- 12.2. SUSPENSION OILING AND CHARGING PROCEDURE
- 12.3. OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
- 12.4. ENGINE EMISSIONS AFTERTREATMENT SYSTEMS
- 12.5. TOEIN ADJUSTMENT PROCEDURE
- 12.6. PRESHIFT BRAKE TEST TEST PROCEDURE
- 12.7. PARKING BRAKE BLEEDING/FLUSHING PROCEDURE
- 12.8. ALTERNATOR LOCK CHECKOUT PROCEDURE
- 12.9. INTERFACE MODULE CHECKOUT PROCEDURE
- 12.10. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
- 12.11. AUTOMATIC LUBRICATION SYSTEM
- 12.12. AUTOMATIC LUBRICATION SYSTEM PRIMING
- 12.13. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
- 12.14. TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
- 12.15. HYDRAULIC SYSTEM CHECKOUT PROCEDURE
- 12.16. BRAKE SYSTEM CHECKOUT PROCEDURE
- 12.17. KOMTRAX PLUS 2 SHOP SETUP CHECKOUT PROCEDURE
- 12.18. KOMTRAX PLUS 2 SITE SETUP CHECKOUT PROCEDURE
- 12.19. PAYLOAD METER IV CHECKOUT PROCEDURE
- 12.20. ELECTRIC CHECKOUT PROCEDURE
- 12.21. KOMVISION CHECKOUT PROCEDURE
- 12.22. KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
- 12.23. RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
- 12.24. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
- 12.25. FIELD ASSEMBLY INSPECTION REPORT
- 12.26. HOUR POSTCOMMISSIONING CHECKSHEET
















Reviews
There are no reviews yet.