Description
-
Model List:
- 980E-5 Dump Truck
- 1. Field Assembly Manual 980E5 Dump Truck
- 2. Contents
- 3. FOREWORD
- 3.1. Foreword
- 3.2. Safety Alert Symbol and Signal Words
- 4. SAFETY RULES, TOOLS AND EQUIPMENT
- 4.1. Safety rules
- 4.2. Tools and equipment for assembly
- 4.3. Assembly schedule
- 5. TRUCK COMPONENTS AND SPECIFICATIONS
- 5.1. Truck components
- 5.2. Specifications
- 6. MAJOR COMPONENT WEIGHTS
- 6.1. Major component weights
- 7. FIELD WELDING FOR ASSEMBLY OR REPAIR
- 7.1. Introduction
- 7.2. General repair procedures
- 8. RECEIVING AND ASSEMBLY PREPARATION
- 8.1. Parts preparation
- 9. CHASSIS ASSEMBLY
- 9.1. Assembly introduction
- 9.2. Chassis Assembly
- 10. DUMP BODY ASSEMBLY
- 10.1. Dump body general information
- 11. FINAL ASSEMBLY
- 11.1. Final assembly general information
- 12. FINAL CHECKOUT
- 12.1. Perform final checkout
- 13. APPENDIX
- 13.1. Appendix
- 13.2. Torque Specifications
- 13.3. Suspension Oiling and Charging Procedures (58E6002200_04)
- 13.4. Suspension Oiling and Charging Block Kit Installation Procedure (FAM1210)
- 13.5. Oil and Nitrogen Specifications Chart (FAM1204)
- 13.6. Parking Brake Bleeding/Flushing Procedure (FAM1801)
- 13.7. Engine Emissions AfterTreatment System (FAM0251)
- 13.8. ToeIn Adjustment (FAM1306)
- 13.9. Seat Belts And Tethers Checkout Procedure (SM2700_03)
- 13.10. Electric Checkout Procedure (58B0603380_01)
- 13.11. Interface Module Checkout Procedure (58D0603030_02)
- 13.12. Additional Electrical Checkout for Trucks with IM Controls (EM7279_01)
- 13.13. Hydraulic System Checkout Procedure (58B6020400_02)
- 13.14. Brake System Checkout Procedure (58B6040170_01)
- 13.15. PreShift Brake Test Test Procedure (58E0609750_01)
- 13.16. Payload Meter IV Checkout Procedure (58B0602400_06)
- 13.17. Alternator Lock Assembly Checkout Procedure (58E0100190_02)
- 13.18. Komtrax Plus2 Shop Setup Procedure (58F0605240_01)
- 13.19. Komtrax Plus2 Site Setup Precedure (58F0605250_01)
- 13.20. Komvision Checkout Procedure (58E4310000_03)
- 13.21. Komatsu Wireless Bridge Checkout Procedure (58F0680500)
- 13.22. Retractable Ladder System Checkout Procedure (58E0010490_02)
- 13.23. Auto Lube System (58F9000300_02)
- 13.24. Automatic Lubrication System (FAM1405)
- 13.25. Automatic Lubrication System Priming (FAM1406)
- 13.26. Air Conditioning System Checkout Procedure (EM4003_02)
- 13.27. MEMS Checkout (58F0605730_01)
- 13.28. CEAW009902.pdf
- 13.29. CEAW010002.pdf
















Reviews
There are no reviews yet.