Description
-
Model List:
- D155AX-6 Bull Dozer
- 1. COVER
- 2. Preface
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 7. LAYOUT OF KIT
- 8. STYLE FOR TRANSPORTATION
- 9. LIST OF TOOLS FOR FIELD ASSEMBLING
- 10. TIGHTENING TORQUE
- 11. COATING MATERIALS LIST
- 12. Selection of wire ropes used for assembly
- 13. Assembly
- 13.1. A1. Unloading and installing tractor
- 13.2. A2. Installing track shoes
- 13.3. A3. Installation of blade lift cylinder
- 13.4. A4. Assembly of blade
- 13.5. A5. Installation of full roller guard
- 13.6. A6. Installation of blade
- 13.7. A7. Installation of ripper assembly
- 13.8. A8. Installation of operators cab
- 13.9. A9. Check track tension
- 13.10. A10. Check of oil and coolant levels
- 13.11. A11. Lubricating
- 13.12. A12. Bleeding air from hydraulic cylinders
- 13.13. A13. Installation of additional working lamps
- 13.14. A14. Installation of KOMTRAX parts
- 13.15. A15. Installation of KOMTRAX antenna
- 13.16. A16. Installation of fire extinguisher
- 14. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 14.1. M1. Testing and adjusting operators cab
- 14.2. M2. Replacement of return filter (Standard filter to flushing filter)
- 14.3. M3. Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
- 14.4. M4. Replacement of return filter (Flushing filter to standard filter)
- 14.5. M5. Bleeding air from hydraulic cylinders (Part 2)
- 15. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.