Description
-
Model List:
- D155AX-8E0 Bulldozer
- 1. COVER
- 2. Preface
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. DISPOSAL OF REMOVED PARTS
- 7. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 8. LAYOUT OF KIT
- 9. STYLE FOR TRANSPORTATION
- 10. LIST OF TOOLS FOR FIELD ASSEMBLING
- 11. SKETCH OF JIGS
- 12. TIGHTENING TORQUE
- 13. COATING MATERIALS LIST
- 14. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
- 15. Assembly
- 15.1. A1. Unloading and installing tractor
- 15.2. A2. Installation of trunnion
- 15.3. A3. Installation of blade lift cylinder
- 15.4. A4. Assembly of blade
- 15.5. A5. Installation of full roller guard
- 15.6. A6. Installation of blade
- 15.7. A7. Installation of ripper assembly
- 15.8. A8. Check of oil and coolant levels
- 15.9. A9. Lubricating
- 15.10. A10. Bleeding air from hydraulic cylinders
- 15.11. A11. Installation of additional working lamps
- 15.12. A12. Installation of fire extinguisher
- 16. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 16.1. M1. Replacement of return filter (Standard filter to flushing filter)
- 16.2. M2. Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
- 16.3. M3. Replacement of return filter (Flushing filter to standard filter)
- 16.4. M4. Bleeding air from hydraulic cylinders (Part 2)
- 16.5. M5. Error code
- 17. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.