Description
-
Model List:
- D275A-5R Bull Dozer
- 1. Cover
- 2. Preface
- 3. CONTENTS
- 4. Specifications
- 5. Precautions for field assembly
- 6. Assembly procedure, necessary equipment, and schedule
- 7. Layout of kit
- 8. Style for transportation
- 9. Tools list for field assembly
- 10. Sketch of tools
- 11. Tightening torque
- 12. Coating materials
- 13. Assembly procedure
- 13.1. A1. Installation of chassis
- 13.2. A2. Installation of track frame
- 13.3. A3. Installation of ripper
- 13.4. A4. Adding oil to pivot chamber
- 13.5. A5. Installation of track shoes
- 13.6. A6. Assembly of blade (For SemiUdozer / Udozer)
- 13.7. A7. Assembly of blade (For Sigmadozer)
- 13.8. A8. Installation of blade
- 13.9. A9. Installation of operators cab
- 13.10. A10. Installation of ROPS
- 13.11. A11. Check of track tension
- 13.12. A12. Check of oil and coolant levels
- 13.13. A13. Lubricating
- 13.14. A14. Bleeding air from hydraulic cylinders
- 13.15. A15. Installation of KOMTRAX antenna
- 13.16. A16. Installation of lunchbox band (if equipped)
- 14. Check and maintenance procedures after completion of assembly
- 14.1. M1. Check and adjustment of operators cab
- 14.2. M2. Inspection of machine monitor
- 14.3. M3. Replacement of return filter (Standard filter to flushing filter)
- 14.4. M4. Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
- 14.5. M5. Replacement of return filter (Flushing filter to standard filter)
- 14.6. M6. Bleeding air from hydraulic cylinders (Part 2)
- 15. Field assembly inspection report
















There are no reviews yet.