Description
-
Model List:
- D275A-6 Bull Dozer
- 1. Cover
- 2. Preface
- 3. Specifications
- 4. Precautions for field assembly
- 5. Assembly procedure, necessary equipment, and schedule
- 6. Layout of kit
- 7. Style for transportation
- 8. Tools list for field assembly
- 9. Sketch of tools
- 10. Tightening torque
- 11. Coating materials
- 12. Assembly
- 12.1. A1 Installation of chassis
- 12.2. A2 Installation of track frame
- 12.3. A3 Installation of ripper
- 12.4. A4 Adding oil to pivot chamber
- 12.5. A5 Installation of track shoes
- 12.6. A6 Assembly of blade (For SemiUdozer Udozer)
- 12.7. A8 Installation of blade
- 12.8. A10 Installation of ROPS
- 12.9. A11 Check of track tension
- 12.10. A12 Check of oil and coolant levels
- 12.11. A13 Lubricating
- 12.12. A14 Bleeding air from hydraulic cylinders
- 12.13. A15 Installation of KOMTRAX antenna
- 12.14. A16 Installation of lunchbox band (if equipped)
- 13. Check and maintenance procedures after completion of assembly
- 13.1. M3 Replacement of return filter (Standard filter to flushing filter)
- 13.2. M4 Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders
- 13.3. M5 Replacement of return filter (Flushing filter to standard filter)
- 13.4. M6 Bleeding air from hydraulic cylinders
- 14. Field assembly inspection report
















There are no reviews yet.