Description
-
Model List:
- D375A-5 Bull Dozer
- 1. COVER
- 2. PREFACE
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 7. STYLE FOR TRANSPORTATION
- 8. TOOLS LIST FOR FIELD ASSEMBLY
- 9. SKETCH OF TOOLS
- 10. TIGHTENING TORQUE
- 11. COATING MATERIALS
- 12. ASSEMBLY PROCEDURE
- 12.1. A1 INSTALLATION OF UNDERCARRIAGE
- 12.2. A2 INSTALLING TRACK SHOES
- 12.3. A3 CHARGING RECOIL CHAMBER AND PIVOT CHAMBER WITH OIL
- 12.4. A4 INSTALLATION OF BLADE LIFT CYLINDER
- 12.5. A5 INSTALLATION OF TILT HOSE TRUNNION
- 12.6. A6 ASSEMBLY OF BLADE ASSEMBLY
- 12.7. A7 CHECKING OF ARM JOINT CLEARANCE (U BLADE)
- 12.8. A8 INSTALLATION OF BLADE
- 12.9. A9 ADJUSTING OF LIFT CYLINDER JOINT AREA
- 12.10. A10 CHECKING INSTALLATION OF DUAL TILT CYLINDER (IF EQUIPPED)
- 12.11. A11 CHECKING OPERATION OF DUAL TILT MECHANISM (IF EQUIPPED)
- 12.12. A12 INSTALLING RIPPER
- 12.13. A13 INSTALLATION OF OPERATORS CAB
- 12.14. A14 INSTALLATION OF ROPS
- 12.15. A15 CHECK TRACK TENSION
- 12.16. A16 CHECK FUEL, COOLANT AND LUBRICANTS
- 12.17. A17 LUBRICATING
- 12.18. A18 BLEEDING AIR FROM HYDRAULIC CYLINDERS
- 13. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 13.1. M1 CHECK AND ADJUSTMENT OF OPERATORS CAB
- 13.2. M2 MEASURING ENGINE SPEED
- 13.3. M3 ADJUST CONTROL LOGIC TO SPECIFICATION
- 13.4. M4 ERROR CODE
- 14. APPENDIX 1. INSTALLATION OF SPILL GUARDS TO UBLADE
- 15. APPENDIX 2. PROCEDURE FOR INSTALLING ADDITIONAL LAMPS
- 16. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.