Description
-
Model List:
- D475A-3 Super Dozer
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 7. LAYOUT OF KIT
- 8. STYLE FOR TRANSPORTATION
- 9. TOOLS LIST FOR FIELD ASSEMBLY
- 10. TIGHTENING TORQUE
- 11. COATING MATERIALS
- 12. ASSEMBLY PROCEDURE
- 12.1. A1 INSTALLATION OF UNDERCARRIAGE
- 12.2. A2 INSTALLATION OF RIPPER
- 12.3. A3 INSTALLATION OF TRACKS
- 12.4. A4 ADDING OIL TO PIVOT CHAMBER
- 12.5. A5 INSTALLATION OF RIPPER SHANK
- 12.6. A6 INSTALLATION OF BLADE LIFT CYLINDER
- 12.7. A7 INSTALLATION OF TILT HOSES AND TRUNNION
- 12.8. A8 ASSEMBLY OF BLADE
- 12.9. A9 ADJUSTMENT OF ARM JOINT (UBLADE)
- 12.10. A10 INSTALLATION OF BLADE
- 12.11. A11 INSTALLATION OF COUNTERWEIGHT
- 12.12. A12 INSTALLATION OF OPERATORS CAB
- 12.13. A13 INSTALLATION OF ROPS
- 12.14. A14 ADJUSTMENT OF POTENTIOMETER ROD
- 12.15. A15 PROCEDURE FOR ADJUSTING BLADE TILT LIMIT ANGLE
- 12.16. A16 METHOD OF CHECKING AUTORESET SYSTEM (SUPERDOZER)
- 12.17. A17 CHECK TRACK TENSION
- 12.18. A18 CHECK OF OIL/COOLANT LEVEL IN EACH PART
- 12.19. A19 GREASING OF GREASING POINT
- 12.20. A20 INSTALLATION OF ORBCOMM ANTENNA AND WIRING HARNESS
- 12.21. A21 REPLACEMENT OF RETURN FILTER (REPLACEMENT OF STANDARD FILTER WITH FLUSHING FILTER)
- 12.22. A22 INSTALLING DIRECTION OF EXHAUST PIPE
- 12.23. A23 BLEEDING AIR FROM HYDRAULIC CYLINDERS
- 13. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 13.1. M1 TESTING AND ADJUSTING OPERATORS CAB
- 13.2. M2 ERROR CODE
- 13.3. M3 FLUSHING HYDRAULIC CIRCUIT
- 14. INSTALLATION OF SPILL GUARD
- 14.1. INTRODUCTION
- 14.2. ADDITIONAL PARTS
- 14.3. MANUFACUTURE DRAWING FOR SPILL GUARD
- 14.3.1. FOR SEMIUBLADE
- 14.3.2. FOR FULLUBLADE
- 14.4. INSTALLATION PROCEDURE
- 15. FIELD ASSEMBLY INSPECTION REPORT FOR U OR SEMI U TILT DOZER
- 16. FIELD ASSEMBLY INSPECTION REPORT FOR SUPER DOZER
















There are no reviews yet.