- D575A-3 Super Dozer
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. ASSEMBLY PROCEDURE TIME SCHEDULE(TRANSPORTED DISASSEMBLED WEIGHTS LESS THAN 50 TONS)
- 5. EQUIPMENT AND TOOLS TO BE USED
- 6. ASSEMBLY MAP FOR TOOLS TO USED
- 7. TRANSPORTATION POSTURE
- 8. INSTALLATION PROCEDURE
- 8.1. UNLOADING BARE MACHINE
- 8.2. INSTALLATION OF OPERATING CABIN
- 8.3. INSTALLATION OF FOODS EXHAUST PIPE
- 8.4. INSTALLATION OF PIVOT SHAFT
- 8.5. INSTALLATION OF FINAL DRIVE
- 8.6. INSTALLATION REMOVAL OF CYLINDER SUPPORT
- 8.7. INSTALLATION OF UNDERCARRIAGE
- 8.8. INSTALLATION OF TRACK SHOE ASSEMBLY TRUNNION
- 8.9. INSTALLATION OF BLADE CYLINDER STAY
- 8.10. ASSEMBLE OF BLADE ASSEMBLY
- 8.11. INSTALLATION OF COUNTER WEIGHT
- 8.12. INSTALLATION OF ROPS
- 8.13. INSTALLATION OF HEAD LAMP
- 8.14. INSTALLATION OF HANDRAILS
- 8.15. INSTALLATION OF BLADE ASSEMBLY
- 8.16. INSTALLATION OF POTENTIOMETER
- 8.17. ADJUSTMENT OF TRACK TENSION ALIGNMENT FOR CARRIER ROLLER
- 8.18. LUBRICATING ITEMS
- 9. PROCEDURE MANUAL FOR INITIAL SETTING TILT LIMIT
- 10. HOW TO CHECK AUTOMATIC RESETTING TO SYSTEMS
- 11. BLEDDING AIR FROM HYDRAULIC CYLINDER
- 12. TABLE OF FUEL COOLANT AND LUBRICANTS
- 13. COATING MATERIALS
- 14. STANDARD TIGHENING TORQUE
- 15. WEAR PARTS LIST
- 16. HOW TO CHECK ERROR CODE
- 17. ERROR CODE LIST
- 18. ANNEX DATE 1. ASSEMBLY JIG DRAWING
- 19. ANNEX DATE 2. INSTALLATION OF SPILL GUARD TO THE SUPPER BLADE
- 20. CHECK SHEET