Description
-
Model List:
- D85MS-15 Demining Machine
- 1. COVER
- 2. Preface
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. STYLE FOR TARANSPORTATION
- 7. TOOLS LIST FOR FIELD ASSEMBLY
- 8. TIGHTENING TORQUE
- 9. COATING MATERIALS
- 10. ASSEMBLY PROCEDURE
- 10.1. A1. Assembly of Demining Rotor assembly
- 10.2. A2. Installation of Rotor Assy
- 10.3. A3. Installation Electrical Parts
- 10.4. A4. Installation Counter weight assy
- 10.5. A5. Installation of operators cab
- 10.6. A6. Check Track Tension
- 10.7. A7. Check fuel,coolant and lublicants
- 10.8. A8. Lubricating
- 10.9. A9. Bleeding air from hydraulic cylinders
- 10.10. A10. Calibration of yoke angle sensor
- 11. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 11.1. M1. Testing and adjusting operators cab
- 11.2. M2. Mesuring engine speed
- 11.3. M3. Error code check
- 12. APPENDIX
- 12.1. REPLACE DEMINING ROTOR BIT BLOCK
- 12.2. REPLACE DEMINING ROTOR BIT BOX
- 12.3. DISASSEMBLY OF REMOVING ROTOR
- 12.4. ASSEMBLY OF REMOVING ROTOR
- 12.5. REPLACEMENT OF CHAIN GUARD WITH BASKET
- 12.6. REPLACEMENT OF BASKET WITH CHAIN GUARD
















Reviews
There are no reviews yet.