Komatsu PC2000-11, PC2000-11E0 Hydraulic Excavator Field Assembly Manual GEN00224-03

$30.00

  • Type Of Manual: Field Assembly Manual
  • Manual ID: GEN00224-03
  • Format: PDF
  • Size: 47.9MB
  • Number of Pages: 341

Description

  • Model List:

    • PC2000-11 Hydraulic Excavator
    • PC2000-11E0 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. DISPOSAL OF REMOVED PARTS
  • 7. ASSEMBLY PROCEDURE, ASSEMBLY EQUIPMENT AND SCHEDULE
  • 8. FLOWCHART OF MAIN ASSEMBLY PROCEDURE
  • 9. KIT LAYOUT DIAGRAM
  • 10. TRANSPORTATION POSTURES
  • 11. LIST OF PARTS SENT INDIVIDUALLY
  • 12. TOOLS AND EQUIPMENT TO BE USED FOR LOCAL ASSEMBLY
  • 13. TIGHTENING TORQUE
  • 14. COATING MATERIALS LIST
  • 15. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
  • 16. SELECTION OF NYLON SLINGS USED FOR ASSEMBLY
  • 17. ASSEMBLY OF CHASSIS
  • 17.1.
  • 17.2. A 1. Assembly of track frame assembly and center frame assembly
  • 17.3. A 2. Installation of idler cushion cylinder piping
  • 17.4. A 3. Installation of travel motor piping
  • 17.5. A 4. Installation of travel motor cover
  • 17.6. A 5. Filling swing circle with grease
  • 17.7. A 6. Assembly of revolving frame assembly and undercarriage
  • 17.8. A 7. Installation of swing machinery (front) assembly (27t) Installation of swing motor (front) assembly (32t)
  • 17.9. A 8. Connection of swivel joint piping
  • 17.10. A 9. Connection of swing circle grease piping
  • 17.11.
  • 17.12. A10. Installation of hydraulic tank assembly
  • 17.13. A11. Installation of fuel tank assembly
  • 17.14. A12. Connection of fuel tank assembly piping and wiring
  • 17.15. A13. Installation of cab base assembly
  • 17.16. A14. Installation of emergency escape ladder
  • 17.17. A15. Installation of left floor assembly
  • 17.18. A16. Connection of cab base assembly piping
  • 17.19. A17. Connection of cab base assembly wiring
  • 17.20. A18. Connection of left floor assembly heater piping
  • 17.21.
  • 17.22. A19. Connection of left floor assembly wiring
  • 17.23. A20. Installation of tail pipe
  • 17.24. A21. Installation of power module assembly
  • 17.25. A22. Connection of suction piping
  • 17.26. A23. Connection of oil cooler piping and pump drain piping
  • 17.27. A24. Connection of fan motor drain piping
  • 17.28. A25. Installation of suction unit undercover
  • 17.29. A26. Connection of delivery piping
  • 17.30. A27. Connection of pilot piping and fan motor piping
  • 17.31. A28. Connection of power module assembly fuel piping
  • 17.32. A29. Connection of power module assembly heater piping
  • 17.33. A30. Connection of power module assembly wiring
  • 17.34.
  • 17.35. A31. Installation of operators cab assembly
  • 17.36. A32. Installation of rotary lamp (if equipped)
  • 17.37. A33. Installation of iridium antenna
  • 17.38. A34. Connection of operators cab assembly wiring
  • 17.39. A35. Connection of operators cab assembly hydraulic piping
  • 17.40. A36. Connection of operators cab assembly window washer hose
  • 17.41. A37. Connection of operators cab assembly air conditioner piping
  • 17.42. A38. Connection of operators cab assembly heater piping
  • 17.43. A39. Installation of operators cab rear floor assembly
  • 17.44. A40. Installation of handrail around operators cab
  • 17.45.
  • 17.46. A41. Installation of track frame ladder
  • 17.47. A42. Installation of power module side catwalk assemblies (right and left)
  • 17.48. A43. Installation of right floor assembly, grease can cover assembly and center floor
  • 17.49. A44. Installation of fuel tank right catwalk assembly
  • 17.50. A45. Installation of fuel tank front catwalk assembly
  • 17.51. A46. Adjustment of exterior parts clearance
  • 17.52. A47. Connection of grease reel piping
  • 17.53. A48. Installation of access ladder assembly
  • 17.54. A49. Installation of counterweight assembly
  • 17.55. A50. Installation of deformation preventing stoppers for catwalk assemblies (left and right) on the side of power module
  • 17.56. A51. Installation of handrail on counterweight
  • 17.57. A52. Installation of handrail clamps
  • 17.58. A53. Connection of fuel cut wire
  • 17.59. A54. Connection of drain piping under power module
  • 17.60. A55. Connection of battery wiring
  • 17.61.
  • 17.62. A56. Setting of hydraulic tank strainer
  • 17.63. A57 Replacing standard filter to flushing filter
  • 17.64. A58. Starting engine, checking oil and coolant levels, bleeding air from each part, and adjusting track
  • 17.65. A59. Permanent tightening of swing circle bolt
  • 17.66. A60. Parts to be touched up after field assembly (chassis side)
  • 17.67. A61. Connection of engine heater connection port
  • 17.68. A62. Installation of optional harness
  • 17.69. A63. Installation of KomVision and rear lamp
  • 17.70. A64. Connection of emergency stop switch (if equipped) (at the right below power module)
  • 17.71. A65. Connection of emergency stop switch (if equipped) (at the left side of ladder)
  • 17.72. A66. Installation of engine oil and PTO oil pipings
  • 17.73. A67. Installation of coolant piping
  • 17.74. A68. Installation of guard bracket (if equipped)
  • 18. ASSEMBLY OF BACKHOE
  • 18.1.
  • 18.2. C 1. Installation of boom cylinder
  • 18.3. C 2. Installation of boom cylinder hoses
  • 18.4. C 3. Assembly of boom sub assembly
  • 18.5. C 4. Installation of boom assembly
  • 18.6. C 5. Installation of boom cylinder head side
  • 18.7. C 6. Installation of hoses between boom and chassis
  • 18.8.
  • 18.9. C 7. Installation of arm assembly
  • 18.10. C 8. Installation of arm cylinder
  • 18.11. C 9. Connection of hoses between boom and arm
  • 18.12. C10. Connection of auto grease piping
  • 18.13. C11. Connection of wiring between boom and chassis
  • 18.14.
  • 18.15. C12. Installation of bucket assembly
  • 18.16. C13. Installation of bucket link
  • 18.17. C14. Bleeding air from cylinders
  • 18.18. C15. Parts to be touched up after field assembly (work equipment side)
  • 18.19. C16. Bleeding air from auto grease circuit
  • 19. LS. ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
  • 19.1. LS1 Installation of arm cylinder bottom parts
  • 19.2. LS2 Installation of boom cylinder to machine body
  • 19.3. LS3 Installation of boom cylinder hoses
  • 19.4. LS4 Installation of boom cylinder piping
  • 19.5. LS5 Installation of boom assembly
  • 19.6. LS6 Installation of boom cylinder head pins
  • 19.7. LS7 Installation of hose between machine body and boom
  • 19.8. LS8 Installation of bucket cylinder assembly
  • 19.9. LS9 Installation of arm assembly
  • 19.10. LS10 Installation of arm cylinder assembly
  • 19.11. LS11 Installation of hoses between boom and arm
  • 19.12. LS12 Installation of bucket cylinder hoses
  • 19.13. LS13 Installation of grease feed hose of bucket cylinder
  • 19.14. LS14 Installation of bucket assembly
  • 19.15. LS15 Installation of arm cylinder junction hoses
  • 19.16. LS16 Installation of bottom dump hose and grease feed hose between arm and bucket
  • 19.17. LS17 Installation of arm dump cushion (proximity switch)
  • 20. INSPECTION AND SERVICING PROCEDURES AFTER ASSEMBLY
  • 20.1. M 1. Inspection of oil levels and coolant levels and using standard of fuel and lubricant
  • 20.2. M 2. Flushing of hydraulic circuit
  • 20.3. M 3. Releasing residual pressure from hydraulic circuit
  • 20.4. M 4. Releasing residual pressure from HIC circuit and check of gas pressure in HIC accumulator
  • 20.5. M 5. Charging air conditioner with refrigerant
  • 20.6. M 6. Installed angles of mirrors
  • 20.7. M 7. Installed angles of lights
  • 20.8. M. Method for starting up KOMTRAX terminal and default setting of KOMTRAX Plus controller
  • 20.9. M 9. Method of camera calibration for KomVision
  • 21. PC200011 Main pump air bleeding check sheet
  • 22. FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
  • 23. FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC2000-11, PC2000-11E0 Hydraulic Excavator Field Assembly Manual GEN00224-03”

Your email address will not be published. Required fields are marked *