Komatsu PC3000-11 T4 Hydraulic Mining Excavator Field Assembly Manual 06373up-xD-GD-1

$30.00

  • Type Of Manual: Field Assembly Manual
  • Manual ID: 06373up-xD-GD-1
  • Format: PDF
  • Size: 28.0MB
  • Number of Pages: 288

Description

  • Model List:

    • PC3000-11 T4 Hydraulic Mining Excavator
  • 1. Frontcover
  • 2. Foreword
  • 2.1. Foreword
  • 2.2. Precautions for field assembly
  • 2.2.1. How to work
  • 2.2.2. Preparation and check of protective gear, slings and tools
  • 2.2.3. Check during actual work
  • 2.3. Disposal of removed parts
  • 3. SAFETY
  • 3.1. Safety information
  • 3.2. Overview
  • 3.2.1. Normal operations
  • 3.2.2. Regular maintenance
  • 3.2.3. Troubleshooting, adjustments and repair
  • 3.2.4. Additional safety precautions
  • 3.3. Sound pressure and vibration levels in the operators cab
  • 3.3.1. Sound
  • 3.3.2. Vibration
  • 3.4. General precautions common to operation on the excavator
  • 3.4.1. Understanding the excavator
  • 3.4.2. Precautions before starting operation on the excavator
  • 3.4.3. Preparations for safe operation
  • 3.4.4. Fire prevention
  • 3.4.5. Precautions when getting on or off the excavator
  • 3.4.6. Burn prevention
  • 3.4.7. Precautions when cleaning cab glass
  • 3.4.8. Precautions related to protective structures
  • 3.4.9. Precautions related to airborne and ejected debris
  • 3.4.10. Electromagnetic comparability (EMC)
  • 3.4.11. Precautions at jobsite
  • 3.4.12. Starting motor
  • 3.4.13. Operation
  • 3.5. Precaution for maintenance
  • 3.5.1. Isolate the excavator using the transfer pump
  • 3.5.2. Isolate the excavator
  • 3.5.3. Deisolate the excavator
  • 3.5.4. General precaution
  • 3.5.5. Precautions for inspection and maintenance
  • 3.5.6. Precautions with high pressure fluid
  • 3.6. Additional safety information for troubleshooting and adjustments
  • 3.6.1. Inspection of the hydraulic system
  • 3.6.2. Two workers only when the excavator is running during adjustments
  • 3.6.3. Areas of potential danger around the excavator
  • 3.7. Special safety equipment
  • 3.7.1. Front guard protective structure FOPS for operators cab
  • 3.7.2. Object handling
  • 3.7.3. Lighting
  • 3.7.4. Warning beacon
  • 3.7.5. Safety harness in conformity with EN 361 (European standard)
  • 3.8. Additional safety precautions
  • 3.8.1. When assembling the excavator
  • 3.8.2. When disassembling the excavator
  • 4. GENERAL
  • 4.1. General
  • 4.1.1. Delivery of the excavator
  • 4.1.2. Assembling the excavator
  • 4.1.3. Lifting and transportation
  • 4.1.4. Electrical energy
  • 4.1.5. Electromagnetic compatibility (EMC)
  • 4.1.6. Monitoring system of the machine
  • 4.2. Assembly site requirements
  • 4.2.1. Configuration of components on erection site (example)
  • 4.2.2. Required crane
  • 4.2.3. Manpower / assembly time
  • 4.2.4. Tools and equipment for assembly
  • 4.3. Standard application torque chart
  • 4.3.1. Metric standard thread
  • 4.3.2. Metric fine thread
  • 4.4. Special tightening torques
  • 4.5. Torque charts for flange joints
  • 4.6. Tightening torque for hydraulic hose connection nut
  • 4.7. General installation procedures for hydraulic hose lines
  • 4.8. General installation instructions for attachment pins
  • 4.8.1. Preparations for assembly
  • 4.9. Transportation postures
  • 5. ASSEMBLY SEQUENCE
  • 5.1. Assembly sequence of the face shovel excavators
  • 5.1.1. ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINES STABILITY
  • 5.2. Assembly sequence of the backhoe excavators
  • 5.2.1. ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINES STABILITY
  • 5.3. Assembling of the undercarriage (tracks, center body, track frames)
  • 5.3.1. Assembling of center body to crawler carrier
  • 5.3.2. DETERMINING THE TIGHTENING TORQUE
  • 5.3.3. Connecting the hydraulic lines to the travel motors
  • 5.4. Assembling of the travel gear protection and final assembly
  • 5.4.1. Assembling of the travel gear box protection
  • 5.4.2. Final assembly of undercarriage
  • 5.5. Assembling of the machinery house
  • 5.5.1. Assembling of the handrails
  • 5.5.2. Assembling of the traverse with SCR catalyst and def tank
  • 5.5.3. Assembling of the air cleaner assembly
  • 5.6. Assembling of the superstructure platform
  • 5.7. Connecting engine oil reserve system
  • 5.8. Assembling of the fuel tank
  • 5.9. Assembling of the access platform and stairway
  • 5.9.1. Assembling of the access platform and the stairway cylinder
  • 5.9.2. Assembling of the stairway and the attachment point
  • 5.9.3. Assembling of the fuel tank step
  • 5.9.4. Assembling of the fuel tank grids and hand rails
  • 5.9.5. Assembling of the fuel cooler
  • 5.9.6. routing and connecting the hydraulic hose of the stairway cylinder
  • 5.10. Assembling of the bha boom
  • 5.10.1. Assembling of boom cylinder to the boom (BHA)
  • 5.10.2. Assembling of stick cylinder to the boom (BHA)
  • 5.10.3. Assembling of boom assembly to superstructure platform (bha)
  • 5.11. Assembling of the fsa boom
  • 5.11.1. Assembling of boom cylinder and stick cylinder to the boom (FSA attachment)
  • 5.11.2. Assembling of the boom assembly
  • 5.12. Assembling of the counterweight
  • 5.13. Assembling of the cab base
  • 5.13.1. Connect cables from the machinery house to cab base
  • 5.14. Assembling of the operators cab
  • 5.15. Assembling of hydraulic oil cooler assembly
  • 5.16. Assembling of the handrails, catwalks and steps
  • 5.16.1. Assembling of the catwalk between machinery house and control block frame
  • 5.16.2. Assembling of the emergency escape ladder at the cab base
  • 5.16.3. Assembling of the emergency escape ladder assembly at the machinery house
  • 5.16.4. Assembling of the ladder cylinder
  • 5.17. Assembling of additional equipment
  • 5.17.1. Assembling of the lubrication pinion assembly
  • 5.17.2. Connecting grease lines of the slew circle system
  • 5.18. Connecting the central refilling system
  • 5.19. Prechecks before initial engine start
  • 5.20. Filling and bleeding the hydraulic system
  • 5.20.1. FILLING THE HYDRAULIC SYSTEM
  • 5.20.2. Bleeding of the suction oil tank
  • 5.20.3. Bleeding the main mumps
  • 5.20.4. Bleeding the auxiliary pumps PC3000
  • 5.20.5. Rebleeding the main pumps after main drive start
  • 5.20.6. Bleeding Checklist PC3000
  • 5.20.7. Bleeding the hydraulic oil tank
  • 5.20.8. Bleeding the slew parking brake
  • 5.20.9. Bleeding the travel parking brake
  • 5.20.10. Dynamic bleeding
  • 5.21. Assembling of the backhoe attachment
  • 5.21.1. Assembling of the stick to the boom (BHA attachment)
  • 5.21.2. Connecting the hose lines from boom to bucket cylinders
  • 5.21.3. Bleeding the bucket cylinder
  • 5.21.4. Assembling of the bucket (bha attachment)
  • 5.22. Assembling of the face shovel attachment
  • 5.22.1. Attach the bucket cylinder to the boom
  • 5.22.2. Assembling the stick to the boom
  • 5.22.3. Assembling of the bull clam bucket
  • 5.22.4. Assembling of the clam
  • 5.23. Bleeding of the track tensioning system
  • 5.24. Bleeding the slew circuit
  • 5.25. Bleeding air from track system
  • 6. DISASSEMBLY OF THE MACHINE
  • 6.1. Disassembly sequence of the face shovel excavators
  • 6.1.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 6.2. Disassembly sequence of the backhoe excavators
  • 6.2.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 6.2.2. DISPOSAL OF WASTE MATERIAL
  • 7. FINAL CHECKS AND ADJUSTMENTS
  • 7.1. COMMISSIONING CHECK LIST
  • 7.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
  • 7.2.1. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
  • 7.2.2. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
  • 7.2.3. PRESSURE COMPENSATION OF SEALED COMPONENTS
  • 7.3. Air conditioning unit
  • 7.3.1. COMMISSIONING OF THE AIR CONDITIONING
  • 7.3.2. AIR CONDITIONING FOR OPERATORS CAB
  • 7.4. PERFORM THE PMCLINIC ACCORDING TO THE PMCLINIC MANUAL
  • 7.4.1. VISUAL INSPECTION
  • 7.4.2. TRAVELLING INSTRUCTIONS
  • 7.5. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
  • 8. ORBCOMM INITIALIZATION
  • 8.1. ORBCOMM terminal activation
  • 8.1.1. Application form for terminal activation
  • 8.2. WebCARE basic information for machine registration
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC3000-11 T4 Hydraulic Mining Excavator Field Assembly Manual 06373up-xD-GD-1”

Your email address will not be published. Required fields are marked *