Description
-
Model List:
- PC360LC-11 Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 3. CONTENTS
- 4. Specifications
- 5. Precautions for Field Assembly
- 6. Disposal of Removed Parts
- 7. Assembling Procedures, Applicable Equipment and Schedule
- 8. Flow of field assembly
- 9. KIT Layout Diagram
- 10. Transportation
- 11. Tool list for field assembly
- 12. Tightening Torque
- 13. Coating Materials
- 14. Selection of wire ropes used for assembly
- 15. Selection of nylon slings used for assembly
- 16. Assembly of Chassis
- 16.1. A1. Installation of handrail
- 16.2. A2. Installation of climbing grip
- 16.3. A3. Installation of mirror
- 17. Assembling of Work Equipment
- 17.1. B1. Installation of arm assembly
- 17.2. B2. Releasing remaining pressure in hydraulic circuit
- 17.3. B3. Installation of bucket cylinder hoses between boom and bucket cylinder
- 17.4. B4. Installation of bucket
- 17.5. B5. Greasing after completion of work equipment
- 17.6. B6. Bleeding air from work equipment circuit
- 18. Increasing and decreasing oF track frame gauge, assembling of counterweight
- 18.1. C1. Adjustment of track tension
- 18.2. C2. Sticking sheet to counterweight
- 18.3. C3. Installation of camera
- 18.4. C4. Installation of counterweight
- 19. Procedure for Inspection and Maintenance after Completion of Assembly
- 19.1. M1. Replacement of return filter (Standard filter to flushing filter)
- 19.2. M2. Flushing of hydraulic circuit
- 19.3. M3. Replacement of return filter (Flushing filter to standard filter)
- 19.4. M4. Check of oil/coolant level at each part
- 19.5. M5. Inspection of oil level in hydraulic tank and refill
- 19.6. M6. Parts to be touched up after field assembly
- 19.7. M7. Error code
- 20. FIELD ASSEMBLY INSPECTION REPORT
















Reviews
There are no reviews yet.