Komatsu PC5500-6 Hydraulic Mining Shovel Operation and Maintenance Manual OMPC550015014

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: OMPC550015014
  • Format: PDF
  • Size: 5.6MB
  • Number of Pages: 477

Description

  • Model List:

    • PC5500-6 Hydraulic Mining Shovel
  • 1. COVER
  • 2. INTRODUCTION
  • 2.1. CONTENTS OF THE BINDER
  • 2.2. DIVISION OF THE BINDER
  • 2.3. DESIGNATED USE OF THE EXCAVATOR
  • 2.4. DELIVERY OF THE EXCAVATOR
  • 2.5. EXPLANATION OF ABBREVATIONS
  • 2.6. TABLE OF CONTENTS
  • 3. SAFETY
  • 3.1. SAFETY INSTRUCTIONS
  • 3.1.1. WARNINGS AND SYMBOLS
  • 3.1.2. BASIC OPERATION AND DESIGNATED USE OF THE HYDRAULIC EXCAVATOR
  • 3.1.3. ORGANIZATIONAL MEASURES
  • 3.1.4. SELECTION AND QUALIFICATION OF PERSONNEL BASICRESPONSIBILITIES
  • 3.1.5. SAFETY INSTRUCTIONS GOVERNING SPECIFIC OPERATIONAL PHASES
  • 3.1.6. WARNING OF SPECIAL DANGERS
  • 3.1.7. TRANSPORTING AND TOWING RECOMMISSIONING
  • 3.1.8. SPECIAL SAFETY EQUIPMENT
  • 3.1.9. SAFETY HARNESS IN CONFORMITY WITH EN 361 (EUROPEANSTANDARD)
  • 4. OPERATION
  • 4.1. FOREWORD
  • 4.2. CONSTRUCTION OF THE EXCAVATOR
  • 4.2.1. OVERALL VIEW
  • 4.2.2. UNDERCARRIAGE AND SUPERSTRUCTURE
  • 4.2.3. HYDRAULICALLY OPERATED ACCESS LADDER
  • 4.2.4. EMERGENCY ESCAPE LADDER
  • 4.2.5. EMERGENCY ENGINE SHUTDOWN FROM GROUND MAN OR OPERATOR WARNING SYSTEM
  • 4.2.6. OPERATORS CAB WITH INTEGRATED FALLING OBJECT PROTECTIVE STRUCTURE (FOPS)
  • 4.2.7. Engine Oil Management System
  • 4.3. OPERATORS CAB CONTROLS
  • 4.3.1. HYDRAULIC CONTROL SYSTEM
  • 4.3.2. SAFETY CIRCUIT FOR CONTROLS
  • 4.4. ELECTRONIC MONITORING AND CONTROL SYSTEM ECS
  • 4.5. OPERATING THE HEATER, VENTILATION AND AIRCONDITIONING
  • 4.5.1. A HEATING
  • 4.5.2. B COOLING
  • 4.5.3. COMBINED OPERATION OF AIR CONDITIONING AND HEATING
  • 4.6. POWER HOUSE
  • 4.6.1. EMERGENCY ENGINE SHUTDOWN SWITCHES
  • 4.6.2. CONTROL AND FILTER PANEL OF REAR AND FRONT POWER UNIT
  • 4.7. ELECTRICAL EQUIPMENT IN CAB BASE
  • 4.7.1. SWITCH BOARD (X2) IN CAB BASE
  • 4.8. CHECKS BEFORE STARTING THE ENGINES
  • 4.9. STARTING THE ENGINES
  • 4.9.1. STARTING PROCEDURE
  • 4.10. MOVING THE EXCAVATOR
  • 4.10.1. TRAVEL CONTROL WITH FOOT PEDALS
  • 4.10.2. TRAVELLING INSTRUCTIONS
  • 4.11. SLEWING AND BRAKING THE SUPERSTRUCTURE
  • 4.11.1. SLEWING THE SUPERSTRUCTURE
  • 4.12. WORKING WITH THE ATTACHMENT
  • 4.12.1. MACHINES EQUIPPED WITH EURO CONTROL SYSTEM
  • 4.12.2. MACHINES EQUIPPED WITH KMG CONTROL SYSTEM
  • 4.12.3. BOTTOM DUMP BUCKET
  • 4.12.4. DROP BALL OPERATION
  • 4.12.5. COMBINED OPERATION CYCLES
  • 4.13. WORKING INSTRUCTIONS
  • 4.13.1. STABILITY OF THE EXCAVATOR
  • 4.13.2. EXCAVATOR OPERATION
  • 4.14. PARKING THE EXCAVATOR
  • 4.15. STOPPING THE ENGINES
  • 4.16. OPERATION OF THE LUBRICATION SYSTEM
  • 4.16.1. CENTRAL LUBRICATION SYSTEM CLS
  • 4.16.2. SWING CIRCLE PINION LUBRICATION SYSTEM SLS
  • 4.17. FIRE DETECTION AND SUPPRESSION SYSTEM
  • 4.17.1. HIGH LEVEL ALARM FIRE
  • 4.17.2. ENGINE SHUTDOWN THROUGH FUEL SHUTOFF SOLENOID VALVE
  • 4.17.3. ACTUATION MODES OF THE FIRE SUPPRESSION SYSTEM
  • 4.17.4. INDICATION OF OPERATIONAL MODES AT CONTROL MODULE, AFTER AUTOMATIC ACTUATION OF THE FIRE S…
  • 4.17.5. LOCATION OF THE EXTINGUISHING AGENT TANK ASSEMBLIES AND EXPELLANT GAS CARTRIDGES ON POWER…
  • 4.18. CENTRAL REFILLING SYSTEM
  • 4.18.1. SYSTEMS CONNECTED TO THE REFILLING SYSTEM
  • 4.18.2. OPERATING THE HYDRAULIC SERVICE ARM
  • 4.18.3. RECEIVER PANEL WITH MONITOR BOX
  • 4.18.4. REFILLABLE GREASE CONTAINERS OF THE CENTRAL LUBRICATION SYSTEM AND SWING CIRCLE LUBRICATIO…
  • 4.19. WORK ON THE LOADER ATTACHMENT
  • 4.20. TRANSPORTATION AND LIFTING OF THE EXCAVATOR
  • 4.20.1. DISASSEMBLING OF THE EXCAVATOR
  • 4.20.2. TRANSPORTATION AND LIFTING
  • 4.21. RETRIEVAL PROCEDURE
  • 4.22. EXCAVATOR STORAGE
  • 4.22.1. PREPARING FOR STORAGE
  • 4.22.2. ONE MONTH REPETITIVE SERVICE PERIOD
  • 4.22.3. SIX MONTH REPETITIVE SERVICE PERIOD
  • 4.22.4. PREPARING FOR OPERATION
  • 4.23. TROUBLE SHOOTING
  • 4.23.1. ENGINE
  • 4.23.2. HYDRAULIC SYSTEM
  • 4.23.3. FINAL DRIVES AND SWING GEAR
  • 4.23.4. CRAWLER TRACKS
  • 5. MAINTENANCE
  • 5.1. FOREWORD
  • 5.2. PRECAUTIONS FOR MAINTENANCE
  • 5.3. FUEL AND LUBRICANTS
  • 5.4. FILLING CAPACITIES
  • 5.5. STANDARD TORQUE LIST
  • 5.6. LUBRICATION AND MAINTENANCE SCHEDULE
  • 5.6.1. INITIAL SERVICING
  • 5.6.2. PERIODIC SERVICING INTERVALS
  • 5.6.3. PERIODIC SERVICING SCHEDULE
  • 5.6.4. EXTENDED SERVICE INTERVALS FOR ENGINES WITH ENGINE OIL MANAGEMENT SYSTEM
  • 5.6.5. MAINTENANCE OF THE ENGINES
  • 5.7. WHEN NECESSARY
  • 5.7.1. ENGINE AIR CLEANER MAINTENANCE
  • 5.7.2. SWING CIRCLE TOOTHING LUBRICATION
  • 5.7.3. AUTOMATIC LUBRICATION SYSTEMS FILL GREASE CONTAINERS
  • 5.7.4. TRACK ROLLERS AND GUIDE WHEELS REPLACE FLOATING SEALS
  • 5.7.5. COLD STARTING AID, REPLACE FLUID CYLINDER
  • 5.8. EVERY 10 OPERATING HOURS OR DAILY
  • 5.8.1. VISUAL INSPECTIONS
  • 5.8.2. AIR CLEANER CLEAN PRECLEANER
  • 5.8.3. RADIATORS CHECK COOLANT LEVEL
  • 5.8.4. TRACK GROUPS CLEAN
  • 5.9. EVERY 50 OPERATING HOURS OR WEEKLY
  • 5.9.1. SWING GEARS AND MOTOR ADAPTER HOUSINGS CHECK OIL LEVELS
  • 5.9.2. TRAVEL GEARS, BRAKE HOUSINGS AND MOTOR ADAPTER HOUSINGS CHECK OIL LEVELS
  • 5.9.3. PTOs (PUMP DISTRIBUTOR GEARS) AND OIL RESERVOIR CHECK OIL LEVEL
  • 5.9.4. HYDRAULIC ACCESS LADDER CHECK SAFETY SENSOR
  • 5.9.5. HYDRAULIC OIL COOLERS INSPECT AND CLEAN IF NECESSARY
  • 5.10. EVERY 250 OPERATING HOURS OR MONTHLY
  • 5.10.1. AIR CONDITIONING COMPRESSOR CHECK DRIVE BELT TENSION
  • 5.10.2. UNDERCARRIAGE PIN CONNECTIONS LUBRICATE
  • 5.10.3. SIGNAL HORN COMPRESSOR LUBRICATE
  • 5.10.4. HYDRAULIC OIL COOLER FAN BEARINGS CHECK FOR LEAKAGE AND CLEAN BREATHER FILTER
  • 5.10.5. RADIATOR FAN BEARINGS CHECK FOR LEAKAGE AND CLEAN BREATHER FILTER
  • 5.10.6. AUTOMATIC LUBRICATION SYSTEMS CLEAN INLINE GREASE FILTER
  • 5.10.7. CAB AIR CLEANER CLEAN OR REPLACE FILTER ELEMENT
  • 5.11. EVERY 500 OPERATING HOURS OR MONTHLY
  • 5.11.1. BATTERIES CHECK FLUID LEVEL
  • 5.11.2. FLEXIBLE DRIVE COUPLINGS CHECK OIL LEVEL
  • 5.11.3. FUEL TANK DRAIN CONDENSATION
  • 5.11.4. CRAWLER TRACK INSPECTION
  • 5.12. EVERY 1000 OPERATING HOURS OR EVERY 6MONTH
  • 5.12.1. HIGH STRENGTH BOLT CONNECTIONS CHECK TORQUE LOAD
  • 5.12.2. HYDRAULIC SYSTEM FILTER SERVICE
  • 5.12.3. PTOS (PUMP DISTRIBUTOR GEARS), SWING GEARS AND TRAVEL GEARS OIL SAMPLE ANALYSIS
  • 5.12.4. SIGNAL HORN COMPRESSOR CLEAN AND LUBRICATE
  • 5.12.5. HYDRAULIC TRACK TENSIONING SYSTEM CHECK PRESSURE ACCUMULATORS
  • 5.12.6. WATER FILTER REPLACE FILTER CARTRIDGE
  • 5.13. EVERY 2000 OPERATING HOURS OR YEARLY
  • 5.13.1. HYDRAULIC SYSTEM CHANGE OIL, REPLACE SUCTION STRAINERS AND PULSATION DAMPER
  • 5.13.2. EMERGENCY ESCAPE LADDER INSPECTION
  • 5.14. EVERY 3000 OPERATING HOURS HOWEVER AT LEAST ONCE A YEAR
  • 5.14.1. SWING GEARS AND MOTOR ADAPTER HOUSING CHANGE OIL
  • 5.14.2. TRAVEL GEARS, BRAKE AND MOTOR ADAPTER HOUSINGS CHANGE OIL
  • 5.14.3. PTO (PUMP DISTRIBUTOR GEAR) CHANGE OIL
  • 5.15. FIRE PREVENTION
  • 5.16. REPAIR WELDINGS
  • 5.16.1. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE UNDERCARRIAGE
  • 5.16.2. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE LOADER ATTACHMENT
  • 5.16.3. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE SUPERSTRUCTURE
  • 5.16.4. AFTER FINISHING THE REPAIR WELDINGS ON THE SUPERSTRUCTURE
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC5500-6 Hydraulic Mining Shovel Operation and Maintenance Manual OMPC550015014”

Your email address will not be published. Required fields are marked *