Komatsu PC750-6, PC800-6 Hydraulic Excavator Field Assembly Instruction SEAW001803

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: SEAW001803
  • Format: PDF
  • Size: 5.2MB
  • Number of Pages: 134

Description

  • Model List:

    • PC750-6 Hydraulic Excavator
    • PC800-6 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. FIELD ASSEMBLING
  • 6. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
  • 7. TRANSPORTATION
  • 7.1. PACKING STYLE FOR TRANSPORTATION
  • 7.2. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 8. STANDARD TIGHTENING TORQUE
  • 9. ASSEMBLY OF BASE MACHINE
  • 9.1. A1 FITTING OF LEFT AND RIGHT TRACK FRAMES
  • 9.2. A2 ARRANGEMENT OF TRAVEL PIPE
  • 9.3. A3 INSTALLATION OF FOG
  • 9.4. A4 INSTALLATION OF RADIATOR COVER
  • 9.5. A5 INSTALLATION OF REARVIEW MIRROR
  • 9.6. A6 INSTALLATION OF HANDRAIL
  • 9.7. A7 INSTALLATION OF STEP
  • 9.8. A8 INSTALLATION OF STEP
  • 9.9. A9 SETTING OF MUFFLER TAIL TUBE
  • 9.10. A10 STICKING OF SHEET (TO COUNTERWEIGHT)
  • 9.11. A11 INSTALLATION OF COUNTERWEIGHT
  • 9.12. A12 INSTALLATION OF RADIO ANTENNA
  • 9.13. A13 INSTALLATION OF CAB TOP LIGHT
  • 9.14. A14 SETTING OF TRAVEL PIPE COVER
  • 9.15. A15 ADJUSTMENT OF TRACK TENSION
  • 9.16. A15A EXTENSION OF TRACK FRAME GAUGE (ONLY WHEN 3SPLIT PACKAGES ARE TRANSPORTED)
  • 9.17. A16 INSPECTION OF OIL AMOUNT AND WATER AMOUNT
  • 10. ASSEMBLING OF WORK EQUIPMENT
  • 10.1. B1 BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
  • 10.2. B2 BOOM ASSEMBLY
  • 10.3. B3 RELIEVING REMAINING PRESSURE FROM HYDRAULIC CIRCUIT
  • 10.4. B4 INSTALLATION OF BOOM CYLINDER FOOT
  • 10.5. B5 ARRANGEMENT OF BOOM CYLINDER HOSE
  • 10.6. B6 INSTALLATION OF BOOM CYLINDER
  • 10.7. B7 INSTALLATION OF ARM CYLINDER
  • 10.8. B8 ARRANGEMENT OF ARM CYLINDER HOSE
  • 10.9. B9 INSTALLATION OF ARM ASSEMBLY
  • 10.10. B10 ARRANGEMENT OF HOSE BETWEEN BOOM AND BUCKET CYLINDER
  • 10.11. B11 INSTALLATION OF BUCKET ASSEMBLY
  • 10.12. B12 LUBRICATION PIPING TO WORK EQUIPMENT
  • 10.13. B13 AIR BLEEDING FROM CYLINDER
  • 10.14. B14 WIRING OF WORK EQUIPMENT
  • 10.15. B15 GREASING ASSEMBLED WORK EQUIPMENT
  • 11. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
  • 11.1. M1 INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
  • 11.2. M2 REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
  • 11.3. M3 FLUSHING OF HYDRAULIC CIRCUIT
  • 12. ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL
  • 12.1. C1 RELEASING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
  • 12.2. C2 PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
  • 12.3. C3 INSTALLATION OF BOOM AND ARM ASSEMBLY
  • 12.4. C4 INSTALLATION OF FLUSHING PIPING BETWEEN CHASSIS AND BOOM
  • 12.5. C5 INSTALLATION OF FLUSHING PIPING FOR BOOM CYLINDER AND ARM CYLINDER
  • 12.6. C6 INSTALLATION OF FLUSHING PIPING FOR BUCKET CYLINDER
  • 12.7. C7 INSTALLATION OF FLUSHING PIPING FOR BOTTOM DUMP CYLINDER
  • 12.8. C8 INSTALLATION OF BOOM CYLINDER
  • 12.9. C9 INSTALLATION OF BOOM CYLINDER FOOT
  • 12.10. C10 INSTALLATION OF BOOM CYLINDER HOSES
  • 12.11. C11 INSTALLATION OF BOOM CYLINDER ROD PIN
  • 12.12. C12 INSTALLATION OF ARM CYLINDER HOSES
  • 12.13. C13 INSTALLATION OF BUCKET CYLINDER
  • 12.14. C14 INSTALLATION OF BUCKET CYLINDER HOSE
  • 12.15. C15 INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
  • 12.16. C16 INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
  • 12.17. C17 INSTALLATION OF BUCKET ASSEMBLY
  • 12.18. C18 INSTALLATION OF WORKING LAMPS
  • 12.19. C19 INSTALLATION OF WORK EQUIPMENT GREASE PIPING
  • 12.20. C20 GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
  • 12.21. C21 BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
  • 12.22. C22 FLUSHING OF WORK EQUIPMENT PIPING
  • 12.23. C23 CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
  • 13. FIELD ASSEMBLY INSPECTION REPORT
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC750-6, PC800-6 Hydraulic Excavator Field Assembly Instruction SEAW001803”

Your email address will not be published. Required fields are marked *