Description
-
Model List:
- PC950-11 Hydraulic Excavator
- PC950LC-11 Hydraulic Excavator
- 1. FOREWORD
- 2. CONTENTS
- 3. SAFETY INFORMATION
- 3.1. SAFETY NOTICE FOR OPERATION
- 3.2. PRECAUTIONS TO PREVENT FIRE
- 3.3. ACTIONS IF FIRE OCCURS
- 3.4. PRECAUTIONS FOR DISPOSING OF WASTE MATERIALS
- 3.5. ACTIONS TAKEN TO MEET EXHAUST GAS REGULATIONS
- 3.6. PRECAUTIONS FOR DEF
- 3.7. STORE AdBlue/DEF
- 3.8. PRECAUTIONS FOR HANDLING HYDRAULIC EQUIPMENT
- 3.9. PRECAUTIONS FOR DISCONNECTION AND CONNECTION OF PIPINGS
- 3.10. PRECAUTIONS FOR HANDLING ELECTRICAL EQUIPMENT
- 3.11. PRECAUTIONS FOR HANDLING FUEL SYSTEM EQUIPMENT
- 4. HANDLING OF TIEOFF ANCHOR POINTS
- 5. BE CAREFUL NOT TO HIT BUCKET WHEN RETRACTING WORK EQUIPMENT
- 6. SPECIFICATIONS
- 7. PRECAUTIONS FOR FIELD ASSEMBLY
- 8. DISPOSAL OF REMOVED PARTS
- 9. ASSEMBLY PROCEDURE, FACILITY USED, AND SCHEDULE
- 10. KIT LAYOUT DIAGRAM
- 11. FLOW OF MAIN FIELD ASSEMBLY
- 12. TRANSPORTATION PACKING STYLE
- 13. FIELD ASSEMBLY TOOLS LIST
- 14. TIGHTENING TORQUE
- 15. COATING MATERIALS
- 16. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
- 17. SELECTION OF NYLON SLINGS USED FOR ASSEMBLY
- 18. ASSEMBLY OF CHASSIS
- 18.1. A1 Replacement of return filter (Standard > Flushing)
- 18.2. A2 Installation of R.H. and L.H. track frames
- 18.3. A3 Installation of travel piping (PC950)
- 18.4. A3 Installation of travel piping (PC950LC)
- 18.5. A4 Installation of step
- 18.6. A5 Sticking revolving frame sheets
- 18.7. A6 Installation of L.H. side step
- 18.8. A7 Installation of L.H. side step (Hydraulic cab step type (if equipped))
- 18.9. A8 Installation of L.H. side step emergency stop switch (Hydraulic cab step type (if equipped))
- 18.10. A9 Installation of R.H. side step
- 18.11. A10 Installation of emergency stop switch on left side
- 18.12. A11 Installation of emergency stop switch on right side
- 18.13. A12 Installation of handrail
- 18.14. A13 Installation of R.H. rearview mirror
- 18.15. A14 Installation of L.H. rearview mirror
- 18.16. A15 Sticking counterweight sheets
- 18.17. A16 Assembly procedure of KomVision camera
- 18.18. A17 Installation of counterweight revolving lamp (if equipped)
- 18.19. A18 Installation of counterweight rear lamp
- 18.20. A19 Installation of counterweight
- 18.21. A20 Installation of cab top step lamp
- 18.22. A21 Installation of cab revolving lamp (if equipped)
- 18.23. A22 Bleed air from hydraulic pump
- 18.24. A23 Bleed air from travel motor
- 18.25. A24 Installation of travel piping covers (PC950)
- 18.26. A24 Installation of travel piping covers (PC950LC)
- 18.27. A25 Installation of track frame undercovers
- 18.28. A26 Installation of travel motor guards
- 18.29. A27 Adjustment of track tension
- 18.30. A28 Installation of fire extinguisher (if equipped)
- 18.31. A29 Installation of transportation jigs (muffler)
- 19. Assembly of work equipment
- 19.1. B1 Release pressure remaining in hydraulic circuit
- 19.2. B2 Installation of boom antidrop valve to boom cylinder
- 19.3. B3 Installation of boom cylinder to revolving frame
- 19.4. B4 Installation of boom antidrop valve hoses
- 19.5. B5 Installation of boom cylinder hoses
- 19.6. B6 Installation of autogrease hose (between injector and circle) (if equipped)
- 19.7. B7 Bleed air from cylinder
- 19.8. B8 Installation of dust seal to boom foot
- 19.9. B9 Installation of arm dust seal
- 19.10. B10 Installation of autogrease hose (between chassis and boom) (if equipped)
- 19.11. B11 Installation of quick coupler hose (between chassis and boom) (if equipped)
- 19.12. B12 Installation of boom assembly
- 19.13. B13 Installation of boom hoses (between machine and boom)
- 19.14. B14 Installation of arm antidrop valve hoses (between machine and boom)
- 19.15. B15 Installation of 1attachment hoses (between chassis and boom) (if equipped)
- 19.16. B16 Installation of boom cylinder
- 19.17. B17 Fixing of boom antidrop valve hoses
- 19.18. B18 Installation of arm assembly
- 19.19. B19 Installation of hoses between boom and bucket cylinder
- 19.20. B20 Installation of 1attachment hoses (between boom and arm) (if equipped)
- 19.21. B21 Installation of autogrease hose (between boom and arm) (if equipped)
- 19.22. B22 Installation of quick coupler hose (between boom and arm) (if equipped)
- 19.23. B23 Installation of bucket assembly
- 19.24. B24 Clearance standard for installation of work equipment
- 19.25. B25 Installation of work equipment grease piping
- 19.26. B26 Installation of work equipment lamp wiring
- 19.27. B27 Greasing after assembling work equipment
- 19.28. B28 Bleeding air from autogrease line (if equipped)
- 19.29. B29 Bleeding air from hydraulic step cylinder (if equipped)
- 20. Testing and maintenance procedures after completing assembly
- 20.1. M1 Check hydraulic tank oil level and add oil
- 20.2. M2 Flushing of hydraulic circuit
- 20.3. M3 Replacement of return filter (Flushing > Standard)
- 20.4. M4 Check of oil and coolant levels at each section
- 20.5. M5 Places to touch up after field assembly
- 20.6. M6 Setting of KomVision (Camera calibration)
- 20.7. M7 Inspection method of 12 m visibility (KomVision)
- 20.8. M8 Check display of failure code
- 20.9. M9 Installation of fuel tank oil filler lock
- 20.10. M10 Bleeding air from travel PPC circuit
- 21. Field assembly inspection check sheet
















Reviews
There are no reviews yet.