Komatsu WA250-3 Parallel Tool Carrier Operation and Maintenance Manual CEAM002001

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: CEAM002001
  • Format: PDF
  • Size: 2.2MB
  • Number of Pages: 244

Description

  • Model List:

    • WA250-3 Parallel Tool Carrier
  • 1. MAIN MENU
  • 2. COVER
  • 3. INTRODUCTION
  • 3.1. FORWARD
  • 3.2. SAFETY INFORMATION
  • 3.3. INTRODUCTION
  • 3.3.1. INTENDED USE
  • 3.3.2. FEATURES
  • 3.3.3. BREAKING IN A NEW MACHINE
  • 3.4. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 3.4.1. MACHINE SERIAL NO. PLATE POSITION
  • 3.4.2. ENGINE SERIAL NO. PLATE POSITION
  • 3.4.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 3.5. CONTENTS
  • 4. SAFETY
  • 4.1. GENERAL PRECAUTIONS
  • 4.2. PRECAUTIONS DURING OPERATION
  • 4.2.1. BEFORE STARTING ENGINE
  • 4.2.2. AFTER STARTING ENGINE
  • 4.2.3. TRANSPORTATION
  • 4.2.4. BATTERY
  • 4.2.5. TOWING
  • 4.3. PRECAUTIONS FOR MAINTENANCE
  • 4.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 4.3.2. DURING MAINTENANCE
  • 4.3.3. TIRES
  • 4.4. POSITION FOR ATTACHING SAFETY LABELS
  • 4.4.1. POSTION FOR ATTACHING SAFETY LABELS
  • 5. OPERATION
  • 5.1. GENERAL VIEW
  • 5.1.1. GENERAL VIEW OF MACHINE
  • 5.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 5.2. EXPLANANTION OF COMPONENTS
  • 5.2.1. METERS, LAMPS
  • 5.2.2. SWITCHES
  • 5.2.3. CONTROL LEVERS, PEDAL
  • 5.2.4. STEERING COLUMN TILT LEVER
  • 5.2.5. CAP WITH LOCK
  • 5.2.6. SAFETY BAR
  • 5.2.7. TOWING PIN
  • 5.2.8. GREASE PUMP CLAMP AND RUBBER RING
  • 5.2.9. BACKUP ALARM
  • 5.2.10. FUSE
  • 5.2.11. SLOW BLOW FUSE
  • 5.2.12. STORAGE PLACE FOR THIS MANUAL
  • 5.2.13. AUXILIARY POWER SOURCE
  • 5.3. CHECK BEFORE STARTING ENGINE
  • 5.3.1. WALK AROUND CHECK
  • 5.3.2. CHECK BEFORE STARTING
  • 5.3.3. ADJUSMENT BEFORE OPERATION
  • 5.3.4. OPERATIONS AND CHECKS BEFORE STARTING ENGINE
  • 5.3.5. STARTING ENGINE
  • 5.3.6. OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 5.3.7. MOVING MACHINE OFF
  • 5.3.8. CHANGING GEAR SPEED
  • 5.3.9. CHANGING DIRECTION
  • 5.3.10. TURNING
  • 5.3.11. STOPPING MACHINE
  • 5.3.12. OPERATION OF WORK EQUIPMENT (WITH BUCKET TOOL)
  • 5.3.13. OPERATAION OF WORK EQUIPMENT (WITH FORK TOOL)
  • 5.3.14. OPERATION OF WORK EQUIPMENT (WITH MULTIPURPOSE BUCKET TOOL)
  • 5.3.15. OPERATION OF WORK EQUIPMENT (WITH MATERIAL HANDLING ARM)
  • 5.3.16. HYDRAULIC QUICK COUPLER
  • 5.3.17. WORK POSSIBLE USING PARALLEL TOOL CARRIER
  • 5.3.18. PRECAUTIONS FOR OPERATION
  • 5.3.19. ADJUSTING BOOM KICKOUT POSITIONER
  • 5.3.20. PARKING MACHINE
  • 5.3.21. CHECKS AFTER COMPLETTION OF ENGINE OPERATION
  • 5.3.22. STOPPING ENGINE
  • 5.3.23. CHECKS AFTER STOPPING ENGINE
  • 5.3.24. LOCKING
  • 5.3.25. HANDLING THE TIRES
  • 5.4. TRANSPORTATION
  • 5.4.1. LOADING, UNLOADING WORK
  • 5.4.2. PRECAUTION FOR LOADING
  • 5.4.3. PRECAUTION FOR LIFTING UP THE VEHICLE
  • 5.5. COLD WEATHER OPERATIONS
  • 5.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 5.5.2. PRECAUTIONS FOR COMPLETION OF WORK
  • 5.5.3. AFTER COLD WEATHER
  • 5.6. LONG TERM STORAGE
  • 5.6.1. BEFORE STORAGE
  • 5.6.2. DURING STORAGE
  • 5.6.3. AFTER STORAGE
  • 5.7. TROUBLESHOOTING
  • 5.7.1. WHEN MACHINE RUNS OUT OF FUEL
  • 5.7.2. TOWING THE MACHINE
  • 5.7.3. IF BATTERY IS DISCHARGED
  • 5.7.4. OTHER TROUBLE
  • 6. MAINTENANCE
  • 6.1. GUIDES TO MAINTENANCE
  • 6.2. OUTLINES OF SERVICE
  • 6.2.1. OUTLINE OF OIL, FUEL, COOLANT
  • 6.2.2. OUTLINE OF ELECTRICAL SYSTEM
  • 6.3. WEAR PARTS LIST
  • 6.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 6.4.1. ENGINE OIL SPECIFICATIONS
  • 6.4.2. DIESEL FUEL SPECIFICATIONS
  • 6.4.3. COOLANT SPECIFICATIONS
  • 6.5. STANDARD TIGHTENING TORQUE FOR BOLTS AND NUTS
  • 6.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 6.5.2. TORQUE LIST
  • 6.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 6.7. MAINTENANCE SCHEDULE CHART
  • 6.7.1. MAINTENANCE SCHEDULE CHART
  • 6.8. SERVICE PROCEDURES
  • 6.8.1. INITIAL 250 HOURS SERVICE
  • 6.8.2. WHEN REQUIRED
  • 6.8.3. CHECK BEFORE STARTING
  • 6.8.4. EVERY 50 HOURS SERVICE
  • 6.8.5. EVERY 100 HOURS OF SERVICE
  • 6.8.6. EVERY 250 HOURS SERVICE
  • 6.8.7. EVERY 500 HOURS SERVICE
  • 6.8.8. EVERY 1000 HOURS SERVICE
  • 6.8.9. EVERY 2000 HOURS SERVICE
  • 7. SPECIFICATIONS
  • 7.1. SPECIFICATIONS
  • 8. OPTIONS, ATTACHMENTS
  • 8.1. AVAILABLE ATTACHMENTS
  • 8.2. SELECTING ATTACHMENTS AND TIRES
  • 8.3. HEATER AND AIR CONDITIONING (IF EQUIPPED)
  • 8.3.1. GENERAL LOCATION AND FUNCTION OF CONTROL PANEL
  • 8.3.2. COOL BOX COMPARTMENT
  • 8.4. HANDLING E.C.S.S. (ELECTRONIC CONTROLLED SUSPENSION SYSTEM)(IF EQUIPPED)
  • 8.4.1. STRUCTURE AND FUNCTION OF E.C.S.S.
  • 8.4.2. METHOD OF OPERATING E.C.S.S
  • 8.4.3. PRECAUTIONS WHEN OPERATING E.C.S.S.
  • 8.4.4. PRECAUTIONS WHEN HANDLING ACCUMULATOR
  • 9. Blank Page
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA250-3 Parallel Tool Carrier Operation and Maintenance Manual CEAM002001”

Your email address will not be published. Required fields are marked *