Komatsu WA800-3E0, WA900-3E0 Wheel Loader Field Assembly Instruction GEN00056-15

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00056-15
  • Format: PDF
  • Size: 10.8MB
  • Number of Pages: 160

Description

  • Model List:

    • WA800-3E0 Wheel Loader
    • WA900-3E0 Wheel Loader
  • 1. Cover
  • 2. CONTENTS
  • 3. Dividing Process Overview (Major components alone)
  • 4. Major Components Table of Dimensions
  • 5. Work Space Layout
  • 6. Schedule Table for Field Assembly
  • 7. Facility, Jigs and Tools
  • 8. List of Oil, Grease and Paints
  • 9. Assembly procedure No.
  • 9.1. Oil, grease and coolant
  • 9.2. Oil, grease and coolant level
  • 9.3. Setting rear frame in place
  • 9.4. Setting front frame in place
  • 9.5. Joining front and rear frames
  • 9.6. Front and rear frames joining procedure
  • 9.7. Assembling the steering pin (1/4)
  • 9.8. Assembling the steering pin (2/4)
  • 9.9. Assembling the steering pin (3/4)
  • 9.10. Assembling the steering pin (4/4)
  • 9.11. Assembling the center drive shaft (Center support Transmission)
  • 9.12. Connection of piping (Part 1)
  • 9.13. Connection of piping (Part 2)
  • 9.14. Connection of piping (Part 2) (7XC47 Front and rear frame combination load figure)
  • 9.15. Connection of piping (Part 2) (Riotinto specification If equipped)
  • 9.16. Connecting the autogreasing pipe
  • 9.17. Setting the axle in place and assembling the support
  • 9.18. Setting the bare machine in place
  • 9.19. Assembling the rear axle
  • 9.20. Rear axle rear side cover assembling procedure
  • 9.21. Connecting the rear axle pipe
  • 9.22. Fixing of rear axle piping (Brake cooling specification If equipped)
  • 9.23. Connection of rear axle piping (Riotinto specification If equipped)
  • 9.24. Fixing of rear axle piping (Brake cooling specification If equipped)
  • 9.25. Connection of cooling line piping (Brake cooling specification If equipped)
  • 9.26. Assembling the rear drive shaft (Transmission Rear axle)
  • 9.27. Assembling the front axle
  • 9.28. Fixing of front axle piping (Brake cooling specification If equipped)
  • 9.29. Connection of front axle piping (Brake cooling specification If equipped)
  • 9.30. Connecting the front axle pipe
  • 9.31. Connection of front axle piping (Riotinto specification If equipped)
  • 9.32. Connecting the front drive shaft (Front axle Center support)
  • 9.33. Connection of front axle brake oil temperature sensor
  • 9.34. Connecting the axle oil temperature sensor (For VHMS specification only)
  • 9.35. Assembling the tires
  • 9.36. Assembling the fuel tank
  • 9.37. Installation of fuel tank (Riotinto specification If equipped)
  • 9.38. Fixing the drain pipe
  • 9.39. Fixing of torque converter cooler drain piping (Riotinto specification If equipped)
  • 9.40. Connecting the fuel pipe
  • 9.41. Fixing of breather hose
  • 9.42. Fixing the engine drain hoses
  • 9.43. Assembling the hydraulic tank ladder
  • 9.44. Assembling the floor and cab assembly
  • 9.45. Connecting the air conditioner hose
  • 9.46. Connecting the brake line
  • 9.47. Connecting the window washer hose
  • 9.48. Connecting the PPC line hose
  • 9.49. Connecting the floor wiring harness
  • 9.50. Connecting the floor wiring harness (Steering wheel specification If equipped)
  • 9.51. Connection of floor wiring harness 1 (Riotinto specification If equipped)
  • 9.52. Connection of floor wiring harness 2 (Riotinto specification If equipped)
  • 9.53. Connecting the steering line (Steering wheel specification If equipped)
  • 9.54. Connecting the link for AJSS (For AJSS specification only)
  • 9.55. Connecting the link for AJSS (For AJSS specification only) 2
  • 9.56. Connecting the link for AJSS (For AJSS specification only) 3
  • 9.57. Connecting the link for AJSS (For AJSS specification only) 4
  • 9.58. Calibration of the AJSS lever amgle and frame offset angle
  • 9.59. Assembling the autogreasing pump and connecting the pipe (WA9003E0 North American specification)
  • 9.60. Assembling the floor cover
  • 9.61. Refilling the window washer
  • 9.62. Assembling the battery box
  • 9.63. Connecting and fixing the battery wiring
  • 9.64. Wiring on right side of battery (Riotinto specification If equipped)
  • 9.65. Wiring on left side of battery 1 (Riotinto specification If equipped)
  • 9.66. Wiring on left side of battery 2 (Riotinto specification If equipped)
  • 9.67. Wiring on left side of battery 3 (Riotinto specification If equipped)
  • 9.68. Connection of ground cable on left side of battery (Riotinto specification If equipped)
  • 9.69. Assembling the battery step
  • 9.70. Installation of oil cooler assembly (Brake cooling specification If equipped)
  • 9.71. Installation and connection of oil cooler assembly piping(Brake cooling specification If equipped)
  • 9.72. Installation of oil cooler assembly piping 1 (Brake cooling specification If equipped)
  • 9.73. Installation of oil cooler assembly piping 2 (Brake cooling specification If equipped)
  • 9.74. Assembling the handrail (On the right hand platform)
  • 9.75. Installation of handrail (Right platform area) (Brake cooling specification If equipped)
  • 9.76. Assembling the handrail (On the hood top face)
  • 9.77. Installation of handrail to step in front of CAB (PDI specification If equipped)
  • 9.78. Installation of mirror to step in front of CAB (PDI specification If equipped)
  • 9.79. Installation of handrail to upper surface of HOOD (PDI specification If equipped)
  • 9.80. Installation of switch to upper surface of HOOD (PDI specification If equipped)
  • 9.81. Installation of rear under view mirror (Rear under view mirror specification)
  • 9.82. Assembling the handrail (On the right hand battery box)
  • 9.83. Assembling the rear access step
  • 9.84. Assembling the left handrail (Part 1)
  • 9.85. Assembling the left handrail (Part 2)
  • 9.86. Installation of left handrail (Part 2) (Brake cooling specification If equipped)
  • 9.87. Assembling the rearview mirror
  • 9.88. Installation of rearview mirrors (Brake cooling specification If equipped)
  • 9.89. Assembling the exhaust pipe
  • 9.90. Installation of oil cooler guard assembly (Brake cooling specification If equipped)
  • 9.91. Installation of fan motor piping cover 1 (Brake cooling specification If equipped)
  • 9.92. Installation of fan motor piping cover 2 (Brake cooling specification If equipped)
  • 9.93. Applying the counterweight antislip
  • 9.94. Assembling the counterweight (WA9003E0 standard specification)
  • 9.95. Assembling the counterweight (WA9003E0 Highlift arm specification)
  • 9.96. Assembling the counterweight (WA8003E0 Overseas general, optional specificationand North American specification)
  • 9.97. Assembling the counterweight (WA8003E0 Overseas general standard specification)
  • 9.98. Assembling the front axle lamp and connecting the harness
  • 9.99. Assembling the front lamp assembly
  • 9.100. Assembling the ROPS canopy assembly
  • 9.101. Assembling the yellow revolving lamp (yellow revolving lamp specification)
  • 9.102. Assembling the antenna and work lamp
  • 9.103. Assembling the VHMS antenna (For VHMS specification only)
  • 9.104. Assembling the floor mat
  • 9.105. Assembling the front fender
  • 9.106. Engine starting procedure
  • 9.107. Bleeding the brake air
  • 9.108. Bleeding air from hydraulic circuit
  • 9.109. Assembling the lift arm assembly (Part 1)
  • 9.110. Assembling the lift arm assembly (Part 2)
  • 9.111. Connecting the remote grease tube
  • 9.112. Assembling the bucket (Part 1)
  • 9.113. Assembling the bucket (Part 2)
  • 9.114. Assembling the bucket (Part 3)
  • 9.115. Assembling the cover (Bottom of the counterweight)
  • 9.116. Assembling the cover (Bottom of the counterweight)(For KAL PDI)
  • 9.117. Feeding the grease
  • 9.118. Work equipment hydraulic circuit air bleeding procedure
  • 9.119. Adjusting the bucket positioner
  • 9.120. Adjusting the new 2 stage (Overseas general standard)
  • 9.121. Adjusting the new 2 stage (North American standard specification)
  • 9.122. Assembling the lift arm angle sensor
  • 9.123. Adjusting the active working system and boom kickout switch(Overseas general standard and domestic standard)
  • 9.124. Touchup work
  • 9.125. Applying the decal (For the overseasdirected products only)
  • 10. Machine check sheet for field assembly
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA800-3E0, WA900-3E0 Wheel Loader Field Assembly Instruction GEN00056-15”

Your email address will not be published. Required fields are marked *