Description
-
Model List:
- WD600-6 Wheel Dozer
- 1. Cover
- 2. Block outline
- 3. Principal component dimension table
- 4. Work space layout
- 5. General assembly schedule
- 6. List of equipment, jigs, tools and consumables
- 7. Oil, grease and paints
- 8. Assembly procedure
- 8.1. Oil and coolant
- 8.2. Oil and coolant capacity
- 8.3. Setting the front axle and bare machine to stationary position
- 8.4. Installing the front axle
- 8.5. Connecting the drive shaft
- 8.6. Connecting the brake pipe
- 8.7. Connecting the brake pipe (Brake cooling specification)
- 8.8. Installing tire and rim assembly
- 8.9. Installing step
- 8.10. Installing cab (1)
- 8.11. Installing cab (2) (AJSS specification)
- 8.12. Installing cab (2) (Steering wheel specification)
- 8.13. Installing cab (2) (AJSS and steering wheel specification)
- 8.14. Installing cab (3)
- 8.15. Installing cab (4) (AJSS specification)
- 8.16. Installing cab (4) (Steering wheel specification)
- 8.17. Installing cab (5) (Steering wheel specification)
- 8.18. Installing cab (6) (AJSS and steering wheel specification)
- 8.19. Installing cab harness (1/3)
- 8.20. Installing cab harness (2/3)
- 8.21. Installing cab harness (3/3) (Steering wheel specification)
- 8.22. Installing cab duct (1/3)
- 8.23. Installing cab duct (2/3)
- 8.24. Installing cab duct (3/3)
- 8.25. Installation of yellow rotary lamp
- 8.26. Installing front fender
- 8.27. Installing front light support and connection
- 8.28. Installing muffler stack and mirror
- 8.29. Installing rear access ladder and L.H. platform
- 8.30. Installing the left handrail
- 8.31. Installing right platform and R.H. handrail
- 8.32. Installing fire extinguisher
- 8.33. Installing the rear fender mudguard plate
- 8.34. Installing rear fender
- 8.35. Installing cab undercover
- 8.36. Checking of sections
- 8.37. Air bleeding of work equipment hydraulic circuit and respective cylinders
- 8.38. Starting engine (1/2)
- 8.39. Starting engine (2/2)
- 8.40. Bleeding air from brake system
- 8.41. Installation of Hlink and Ylink
- 8.42. Installation of right and left support assemblies
- 8.43. Installation of right and left frame assemblies
- 8.44. Installation of blade assembly (1/2)
- 8.45. Installation of blade assembly (2/2)
- 8.46. Greasing (1st time)
- 8.47. Deleting the electrical system failure history (1/3)
- 8.48. Deleting the electrical system failure history (2/3)
- 8.49. Deleting the electrical system failure history (3/3)
- 8.50. Installing the floor mat (AJSS specification)
- 8.51. Installing the floor mat (Steering wheel specification)
- 8.52. Runningin procedure (1/2)
- 8.53. Runningin procedure (2/2)
- 8.54. Greasing (2nd time)
- 8.55. Touch up work
- 8.56. On use of starter kit (dummy harness) and precaution on its use
- 8.57. Starter kit (dummy harness) assembling procedure
- 8.58. Check inflation pressure of tires
- 9. Appendix Machine check sheet for field assembly
















Reviews
There are no reviews yet.