Description
-
Model List:
- D575A-2 Super Dozer
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. ASSEMBLY PROCEDURE TIME SCHEDULE (TRANSPORTED DISASSEMBLEDWEIGHTS LESS THAN 50 TONS)
- 5. EQUIPMENT AND TOOLS TO BE USED
- 6. TRANSPORTATION POSTURE
- 7. INSTALLATION PROCEDURE
- 7.1. Installation of main unit
- 7.2. Installation of final drive Assembly
- 7.3. Installation of pivot shaft
- 7.4. Installation of cylinder support
- 7.5. Installation of cylinder stay
- 7.6. Installation of undercarriage
- 7.7. Installation of track shoe Assembly
- 7.8. Installation of counterweight
- 7.9. Installation of blade lift cylinder
- 7.10. Assembly of super blade Assembly
- 7.10.1. Bleeding air from hydraulic cylinders
- 7.10.2. Standard tightening torque
- 7.10.3. Coating materials
- 7.11. Installation of cab
- 7.11.1. Electrical circuit diagram
- 7.12. Installation of ROPS
- 7.13. Installation of external components
- 7.13.1. Exhaust pipes and hoods
- 7.13.2. Head lamp
- 7.13.3. ROPS light
- 7.13.4. External cover
- 7.13.5. Hand rail
- 8. ASSEMBLY JIG DRAWING
















Reviews
There are no reviews yet.