Description
-
Model List:
- PC3000-11 T4 Hydraulic Mining Excavator
- 1. Frontcover
- 2. Foreword
- 2.1. Foreword
- 2.2. Precautions for field assembly
- 2.2.1. How to work
- 2.2.2. Preparation and check of protective gear, slings and tools
- 2.2.3. Check during actual work
- 2.3. Disposal of removed parts
- 3. SAFETY
- 3.1. Safety information
- 3.2. Overview
- 3.2.1. Normal operations
- 3.2.2. Regular maintenance
- 3.2.3. Troubleshooting, adjustments and repair
- 3.2.4. Additional safety precautions
- 3.3. Sound pressure and vibration levels in the operators cab
- 3.3.1. Sound
- 3.3.2. Vibration
- 3.4. General precautions common to operation on the excavator
- 3.4.1. Understanding the excavator
- 3.4.2. Precautions before starting operation on the excavator
- 3.4.3. Preparations for safe operation
- 3.4.4. Fire prevention
- 3.4.5. Precautions when getting on or off the excavator
- 3.4.6. Burn prevention
- 3.4.7. Precautions when cleaning cab glass
- 3.4.8. Precautions related to protective structures
- 3.4.9. Precautions related to airborne and ejected debris
- 3.4.10. Electromagnetic comparability (EMC)
- 3.4.11. Precautions at jobsite
- 3.4.12. Starting motor
- 3.4.13. Operation
- 3.5. Precaution for maintenance
- 3.5.1. Isolate the excavator using the transfer pump
- 3.5.2. Isolate the excavator
- 3.5.3. Deisolate the excavator
- 3.5.4. General precaution
- 3.5.5. Precautions for inspection and maintenance
- 3.5.6. Precautions with high pressure fluid
- 3.6. Additional safety information for troubleshooting and adjustments
- 3.6.1. Inspection of the hydraulic system
- 3.6.2. Two workers only when the excavator is running during adjustments
- 3.6.3. Areas of potential danger around the excavator
- 3.7. Special safety equipment
- 3.7.1. Front guard protective structure FOPS for operators cab
- 3.7.2. Object handling
- 3.7.3. Lighting
- 3.7.4. Warning beacon
- 3.7.5. Safety harness in conformity with EN 361 (European standard)
- 3.8. Additional safety precautions
- 3.8.1. When assembling the excavator
- 3.8.2. When disassembling the excavator
- 4. GENERAL
- 4.1. General
- 4.1.1. Delivery of the excavator
- 4.1.2. Assembling the excavator
- 4.1.3. Lifting and transportation
- 4.1.4. Electrical energy
- 4.1.5. Electromagnetic compatibility (EMC)
- 4.1.6. Monitoring system of the machine
- 4.2. Assembly site requirements
- 4.2.1. Configuration of components on erection site (example)
- 4.2.2. Required crane
- 4.2.3. Manpower / assembly time
- 4.2.4. Tools and equipment for assembly
- 4.3. Standard application torque chart
- 4.3.1. Metric standard thread
- 4.3.2. Metric fine thread
- 4.4. Special tightening torques
- 4.5. Torque charts for flange joints
- 4.6. Tightening torque for hydraulic hose connection nut
- 4.7. General installation procedures for hydraulic hose lines
- 4.8. General installation instructions for attachment pins
- 4.8.1. Preparations for assembly
- 4.9. Transportation postures
- 5. ASSEMBLY SEQUENCE
- 5.1. Assembly sequence of the face shovel excavators
- 5.1.1. ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINES STABILITY
- 5.2. Assembly sequence of the backhoe excavators
- 5.2.1. ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINES STABILITY
- 5.3. Assembling of the undercarriage (tracks, center body, track frames)
- 5.3.1. Assembling of center body to crawler carrier
- 5.3.2. DETERMINING THE TIGHTENING TORQUE
- 5.3.3. Connecting the hydraulic lines to the travel motors
- 5.4. Assembling of the travel gear protection and final assembly
- 5.4.1. Assembling of the travel gear box protection
- 5.4.2. Final assembly of undercarriage
- 5.5. Assembling of the machinery house
- 5.5.1. Assembling of the handrails
- 5.5.2. Assembling of the traverse with SCR catalyst and def tank
- 5.5.3. Assembling of the air cleaner assembly
- 5.6. Assembling of the superstructure platform
- 5.7. Connecting engine oil reserve system
- 5.8. Assembling of the fuel tank
- 5.9. Assembling of the access platform and stairway
- 5.9.1. Assembling of the access platform and the stairway cylinder
- 5.9.2. Assembling of the stairway and the attachment point
- 5.9.3. Assembling of the fuel tank step
- 5.9.4. Assembling of the fuel tank grids and hand rails
- 5.9.5. Assembling of the fuel cooler
- 5.9.6. routing and connecting the hydraulic hose of the stairway cylinder
- 5.10. Assembling of the bha boom
- 5.10.1. Assembling of boom cylinder to the boom (BHA)
- 5.10.2. Assembling of stick cylinder to the boom (BHA)
- 5.10.3. Assembling of boom assembly to superstructure platform (bha)
- 5.11. Assembling of the fsa boom
- 5.11.1. Assembling of boom cylinder and stick cylinder to the boom (FSA attachment)
- 5.11.2. Assembling of the boom assembly
- 5.12. Assembling of the counterweight
- 5.13. Assembling of the cab base
- 5.13.1. Connect cables from the machinery house to cab base
- 5.14. Assembling of the operators cab
- 5.15. Assembling of hydraulic oil cooler assembly
- 5.16. Assembling of the handrails, catwalks and steps
- 5.16.1. Assembling of the catwalk between machinery house and control block frame
- 5.16.2. Assembling of the emergency escape ladder at the cab base
- 5.16.3. Assembling of the emergency escape ladder assembly at the machinery house
- 5.16.4. Assembling of the ladder cylinder
- 5.17. Assembling of additional equipment
- 5.17.1. Assembling of the lubrication pinion assembly
- 5.17.2. Connecting grease lines of the slew circle system
- 5.18. Connecting the central refilling system
- 5.19. Prechecks before initial engine start
- 5.20. Filling and bleeding the hydraulic system
- 5.20.1. FILLING THE HYDRAULIC SYSTEM
- 5.20.2. Bleeding of the suction oil tank
- 5.20.3. Bleeding the main mumps
- 5.20.4. Bleeding the auxiliary pumps PC3000
- 5.20.5. Rebleeding the main pumps after main drive start
- 5.20.6. Bleeding Checklist PC3000
- 5.20.7. Bleeding the hydraulic oil tank
- 5.20.8. Bleeding the slew parking brake
- 5.20.9. Bleeding the travel parking brake
- 5.20.10. Dynamic bleeding
- 5.21. Assembling of the backhoe attachment
- 5.21.1. Assembling of the stick to the boom (BHA attachment)
- 5.21.2. Connecting the hose lines from boom to bucket cylinders
- 5.21.3. Bleeding the bucket cylinder
- 5.21.4. Assembling of the bucket (bha attachment)
- 5.22. Assembling of the face shovel attachment
- 5.22.1. Attach the bucket cylinder to the boom
- 5.22.2. Assembling the stick to the boom
- 5.22.3. Assembling of the bull clam bucket
- 5.22.4. Assembling of the clam
- 5.23. Bleeding of the track tensioning system
- 5.24. Bleeding the slew circuit
- 5.25. Bleeding air from track system
- 6. DISASSEMBLY OF THE MACHINE
- 6.1. Disassembly sequence of the face shovel excavators
- 6.1.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
- 6.2. Disassembly sequence of the backhoe excavators
- 6.2.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
- 6.2.2. DISPOSAL OF WASTE MATERIAL
- 7. FINAL CHECKS AND ADJUSTMENTS
- 7.1. COMMISSIONING CHECK LIST
- 7.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
- 7.2.1. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
- 7.2.2. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
- 7.2.3. PRESSURE COMPENSATION OF SEALED COMPONENTS
- 7.3. Air conditioning unit
- 7.3.1. COMMISSIONING OF THE AIR CONDITIONING
- 7.3.2. AIR CONDITIONING FOR OPERATORS CAB
- 7.4. PERFORM THE PMCLINIC ACCORDING TO THE PMCLINIC MANUAL
- 7.4.1. VISUAL INSPECTION
- 7.4.2. TRAVELLING INSTRUCTIONS
- 7.5. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
- 8. ORBCOMM INITIALIZATION
- 8.1. ORBCOMM terminal activation
- 8.1.1. Application form for terminal activation
- 8.2. WebCARE basic information for machine registration
















Reviews
There are no reviews yet.