Description
-
Model List:
- PC3000-6 Hydraulic Mining Shovel
- 1. Main Menu
- 2. Cover
- 3. Contents
- 4. General
- 4.1. Delivery of the Excavator
- 4.2. Assembling of the Excavator
- 4.3. Transportation and Lifting
- 4.4. Manpower / Assembly Time
- 4.5. Assembly Site Requirements
- 4.6. Space and Placing Requirements
- 4.7. Preparation for Assembly
- 4.8. Basic Measurements (Z24015)
- 4.9. Transport Dimensions and Weights (as example)
- 4.10. Illust. Configuration of Components on Erection Site
- 5. Assembly sequence
- 5.1. Assembly of Undercarriage (Z 24016 Z 24017 Z 20418)
- 5.1.1. Assembly
- 5.1.2. Determination of the tightening torque
- 5.1.3. Final works
- 5.2. Assembly of Superstructure onto the Undercarriage (Z 9031a)
- 5.3. Mounting of Boom and Boom cylinders(Z 9032 Z 20949)
- 5.4. Mounting of Fuel Tank (Z 21924)
- 5.5. Mounting of Hydraulic access Ladder (Z 24022)
- 5.6. Mounting of Cab Base (Z 24023)
- 5.7. Mounting of Counterweight (Z 24024)
- 5.8. Mounting of Handrails, Steps and Gratings (Z 24025)
- 5.9. Mounting of Cab (Z 24029)
- 5.10. Prechecks prior Initial Start up
- 5.11. Mounting of Stick
- 5.11.1. Backhoe Attachment (Z 24030)
- 5.11.2. Bullclam Bucket Attachment (Z 20950 Z 20951 20952)
- 5.12. Assembly of the bucket to the stick
- 5.12.1. Assembly of the backhoe to the stick (Z 23005)
- 5.12.2. Assembly of the bullclam bucket to the stick (Z 20953)
- 5.13. Mounting of the Pin Seals
- 5.13.1. Backhoe (Z 23006)
- 5.13.2. Bullclam bucket (Z 21963)
- 5.14. Putting the Central Lubrication System into operation (Z 24031)
- 5.15. Standard Application Torque Chart
- 5.15.1. Metric standard thread
- 5.15.2. Metric fine thread
- 5.15.3. Torque Chart for Flange Joints
















Reviews
There are no reviews yet.