Bomag BF 700 C-2 Paver Operating and Maintenance Instructions 00820030

$20.00

  • Type Of Manual: Operating and Maintenance Instructions
  • Manual ID: 00820030
  • Format: PDF
  • Size: 8.9MB
  • Number of Pages: 220
  • Serial Number:
    821892051001 and up

Description

  • Model List:

    • BF 700 C-2 Paver
  • 1. Table of contents
  • 2. Introduction
  • 2.1. Foreword
  • 2.2. Machine type plate and engine type plate
  • 3. Technical data
  • 3.1. Noise and vibration data
  • 4. Concerning your safety
  • 4.1. General prerequisites
  • 4.2. Definition of responsible persons
  • 4.3. Basic safety regulations for safe operation
  • 4.4. Handling fuels and lubricants
  • 4.5. Loading/transporting the machine
  • 4.6. Taking the machine into service
  • 4.7. Driving the machine, working operation
  • 4.8. Refuelling
  • 4.9. Topping up AdBlue/DEF
  • 4.10. What to do in events of emergency
  • 4.11. Maintenance work
  • 4.12. Repair
  • 4.13. Stickers and decals
  • 5. Display and control elements
  • 5.1. Operators stand
  • 5.2. Outside of machine
  • 5.3. Outside control panels
  • 5.4. Screed operating console
  • 5.5. Operating console for screed heating
  • 6. Tests before taking into operation
  • 6.1. Notes on safety
  • 6.2. Visual inspections and function tests
  • 6.3. Checking the engine oil level
  • 6.4. Checking the fuel level, topping up fuel
  • 6.5. Checking the AdBlue/DEF level, topping up
  • 6.6. Checking the hydraulic oil level
  • 6.7. Checking the coolant level
  • 6.8. Checking the emulsion level, topping up
  • 6.9. Lubricating the machine
  • 6.10. Check the grease supply in the central lubrication system
  • 7. Operation
  • 7.1. Settingup the work place
  • 7.2. Start the engine
  • 7.3. Driving the machine in transport mode
  • 7.4. Braking the machine
  • 7.5. Preparing for work
  • 7.6. Operation
  • 7.7. Park the machine in secured condition.
  • 7.8. Adjusting the auger height
  • 7.9. Operating the screed
  • 7.10. Operating the screed heating
  • 7.11. Operating the protection roof
  • 7.12. Emergency procedures
  • 8. Loading / transporting the machine
  • 8.1. Prepare for transport
  • 8.2. Loading the machine
  • 8.3. Lashing the machine to the transport vehicle
  • 8.4. Loading by crane
  • 9. Maintenance
  • 9.1. Preliminary remarks and safety notes
  • 9.2. Overview of maintenance flaps and doors
  • 9.3. Fuels and lubricants
  • 9.4. List of fuels and lubricants
  • 9.5. Runningin instructions
  • 9.6. Maintenance table
  • 9.7. Every 50 operating hours
  • 9.8. Every 250 operating hours
  • 9.9. Every 500 operating hours
  • 9.10. Every 1000 operating hours
  • 9.11. Every 2000 operating hours
  • 9.12. As required
  • 10. Troubleshooting
  • 10.1. Preliminary remarks
  • 10.2. Starting the engine with jump leads
  • 10.3. Screed heating fault code display
  • 10.4. Fuse assignment
  • 10.5. Fault code display in the LCDisplay unit
  • 10.6. Engine faults
  • 11. Waste disposal
  • 11.1. Final shutdown of machine
  • 12. List of special tools
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Bomag BF 700 C-2 Paver Operating and Maintenance Instructions 00820030”

Your email address will not be published. Required fields are marked *