Bomag BM 2200-75 Cold Planer Operating and Maintenance Instructions 00820166

$20.00

  • Type Of Manual: Operating and Maintenance Instructions
  • Manual ID: 00820166
  • Format: PDF
  • Size: 20.6MB
  • Number of Pages: 316
  • Serial Number:
    101888011001 – 101888011006

Description

  • Model List:

    • BM 2200-75 Cold Planer
  • 1. Table of contents
  • 2. Introduction
  • 2.1. Foreword
  • 2.2. Machine type plate and engine type plate
  • 3. Technical data
  • 3.1. Noise and vibration data
  • 4. Concerning your safety
  • 4.1. Basic prerequisites
  • 4.2. Definition of responsible persons
  • 4.3. Basic safety regulations for safe operation
  • 4.4. Handling fuels and lubricants
  • 4.5. Loading / transporting the machine
  • 4.6. Start up procedure
  • 4.7. Driving the machine working operation
  • 4.8. Refuelling
  • 4.9. Emergency procedures
  • 4.10. Maintenance work
  • 4.11. Repair
  • 4.12. Signage
  • 5. Indicators and control elements
  • 5.1. Drivers stand
  • 5.2. Machine
  • 6. Checks prior to start up
  • 6.1. Notes on safety
  • 6.2. Visual inspections and function tests
  • 6.3. Checking the engine oil level
  • 6.4. Checking the fuel level, topping up fuel
  • 6.5. Checking the hydraulic oil level
  • 6.6. Checking the coolant level
  • 6.7. Checking the water spraying system
  • 6.8. Checking the wear items of the milling unit
  • 6.9. Checking the track pads
  • 6.10. Checking condition and tension of conveyor belts
  • 6.11. Checking safety rope and chain
  • 6.12. Lubricating the machine
  • 6.13. Checking the compressor oil level
  • 6.14. Checking the engine oil level (Hatz)
  • 7. Operation
  • 7.1. Setting up the workplace
  • 7.2. Starting the engine
  • 7.3. Steering the machine
  • 7.4. Driving the machine
  • 7.5. Milling operation
  • 7.6. Parking the machine in secured condition
  • 7.7. Operating the scraper
  • 7.8. Folding the conveyor belt
  • 7.9. Operating the high pressure cleaner
  • 7.10. Operating the extraction system
  • 7.11. Outer display
  • 7.12. Operating the levelling system
  • 7.13. Operating the camera
  • 7.14. Emergency procedures
  • 8. Loading / transporting the machine
  • 8.1. Prepare for transport
  • 8.2. Transporting the milling box separately
  • 8.3. Loading the machine
  • 8.4. Lashing the machine to the transport vehicle
  • 8.5. Loading by crane
  • 8.6. After transport
  • 9. Maintenance
  • 9.1. Preliminary remarks and safety notes
  • 9.2. Preparations/concluding work
  • 9.3. Fuels and lubricants
  • 9.4. List of fuels and lubricants
  • 9.5. Runningin instructions
  • 9.6. Maintenance Table
  • 9.7. Every 250 operating hours
  • 9.8. Every 500 operating hours
  • 9.9. Every 1000 operating hours
  • 9.10. Every 2000 operating hours
  • 9.11. As required
  • 10. Troubleshooting
  • 10.1. Preliminary remarks
  • 10.2. Starting the engine with jump leads
  • 10.3. Fuse assignment
  • 10.4. Fault code display
  • 10.5. Measuring value display
  • 10.6. Engine faults
  • 10.7. Engine faults (Hatz)
  • 11. Disposal
  • 11.1. Final shutdown of machine
  • 12. List of special tools
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Bomag BM 2200-75 Cold Planer Operating and Maintenance Instructions 00820166”

Your email address will not be published. Required fields are marked *