Description
-
Model List:
- BR580JG-1 Mobile Crusher
- 1. COVER
- 2. PREFACE
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. OUTLINE OF WORK PROCESS
- 7. FLOW OF ASSEMBLY PROCEDURE
- 8. KIT LAYOUT DRAWING
- 9. PACKING POSTURE FOR TRANSPORTATION
- 10. LIST OF TOOLS FOR FIELD ASSEMBLING
- 11. TIGHTENING TORQUE
- 12. COATING MATERIALS LIST
- 13. LIST OF SEPARATELY SHIPPED PARTS
- 14. ASSEMBLY PROCEDURE
- 14.1. A 1. PREPARATION FOR INSTALLATION OF CRUSHER ASSEMBLY
- 14.2. A 2. INSTALLATION OF CRUSHER ASSEMBLY
- 14.3. A 3. INSTALLATION OF STEPS
- 14.4. A 4. INSTALLATION OF HANDRAILS
- 14.5. A 5. INSTALLATION OF FLOOR
- 14.6. A 6. INSTALLATION OF CRUSHER MOTOR HOSES
- 14.7. A 7. INSTALLATION OF LOCK CYLINDER HOSES
- 14.8. A 8. INSTALLATION OF CRUSHER WIRING
- 14.9. A 9. INSTALLATION OF CRUSHER COVERS
- 14.10. A10. INSTALLATION OF GUARD ASSEMBLY
- 14.11. A11. INSTALLATION OF DUST PLATE ASSEMBLY
- 14.12. A12. INSTALLATION OF SECOND CHUTES
- 14.13. A13. INSTALLATION OF FEEDER MOTOR
- 14.14. A14. POSTURE OF OPEN/CLOSE HOPPER
- 14.15. A15. INSTALLATION OF HOPPER (R.H.)
- 14.16. A16. INSTALLATION OF HOPPER (L.H.)
- 14.17. A17. INSTALLATION OF HOPPER (REAR)
- 14.18. A18. INSTALLATION OF HOPPER PINS
- 14.19. A19. TIGHTENING OF HOPPER MOUNTING BOLTS
- 14.20. A20. GREASING OF HOPPER
- 14.21. A21. INSTALLATION OF FIXED HOPPER (IF EQUIPPED)
- 14.22. A22. INSTALLATION OF CONVEYOR
- 14.23. A23. INSTALLATION OF CONVEYOR PIPING
- 14.24. A24. POSTURE OF CONVEYOR
- 14.25. A25. ADJUSTMENT OF CONVEYOR TENSION
- 14.26. A26. ADJUSTMENT OF CONVEYOR SNAKING
- 14.27. A27. ADJUSTMENT OF CONVEYOR SCRAPER
- 14.28. A28. ADJUSTMENT OF INSTALLATION OF RETURN ROLLER GUARD
- 14.29. A29. ADJUSTMENT OF MUCK DISCHARGE CONVEYOR SCRAPER (IF EQUIPPED)
- 14.30. A30. INSTALLATION OF MAGNETIC SEPARATOR ASSEMBLY
- 14.31. A31. INSTALLATION OF REAR COVER FLOOR
- 14.32. A32. INSTALLATION OF TAIL PIPE
- 14.33. A33. INSTALLATION OF ROTARY LAMP AND WORKING LAMP ASSEMBLY
- 14.34. A34. INSTALLATION OF ROTARY LAMP AND WORKING LAMP WIRING
- 14.35. A35. ADJUSTMENT OF MIRRORS
- 14.36. A36. INSTALLATION OF RESERVOIR TANK COVER
- 14.37. A37. INSTALLATION OF FUEL TANK COVER
- 15. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 15.1. M1. CHECK FUEL, COOLANT AND LUBRICANTS
- 15.2. M2. AIR BLEEDING FROM HYDRAULIC CIRCUITS
- 15.3. M3. REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
- 15.4. M4. FLUSHING OF HYDRAULIC CIRCUIT
- 16. FIELD ASSEMBLY INSPECTION REPORT