Description
-
Model List:
- D275A-5 Bull Dozer
- D275AX-5 Bull Dozer
- 1. COVER
- 2. Preface
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 7. STYLE FOR TRANS POTATION
- 8. TOOLS LIST FOR FIELD ASSEMBLY
- 9. TIGHTENING TORQUE
- 10. COATING MATERIALS
- 11. ASSEMBLY PROCEDURE
- 11.1. A 1. Installing track shoes
- 11.2. A 2. Assembly of blade
- 11.3. A 3. Installation of blade
- 11.4. A 4. Installing ripper
- 11.5. A 5. Installation of operators cab
- 11.6. A 6. Installation of ROPS
- 11.7. A 7. Check track tension
- 11.8. A 8. Check fuel, coolant and lubricants
- 11.9. A 9. Lubricating
- 11.10. A10. Bleeding air from hydraulic cylinders
- 12. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 12.1. M 1 . Check and adjustment of operators cab
- 13. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.