Description
-
Model List:
- D355C-3 PipeLayer
- 1. COVER
- 1.1. Preface
- 1.2. CONTENTS
- 1.3. SPECIFICATIONS
- 1.4. PRECAUTIONS FOR FIELD ASSEMBLY
- 1.5. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 1.6. POSITION FOR TRANSPORTATION
- 1.7. LIST OF TOOLS FOR FIELD ASSEMBLY
- 1.8. TIGHTENING TORQUE
- 1.9. COATING MATERIALS LIST
- 1.10. ASSEMBLY PROCEDURE
- 1.10.1. A1. Installation of exhaust pipe
- 1.10.2. A2. Installation of lamps
- 1.10.3. A3. Installation of gatetype frame
- 1.10.4. A4. Installation of counterweight
- 1.10.5. A5. Installation of cab
- 1.10.6. A6. Installation of air conditioner (If equipped)
- 1.10.7. A7. Installation of boom
- 1.10.8. A8. Charging air conditioner with refrigerant (if equipped)
- 1.10.9. A9. Check of oil/coolant level in each part
- 1.10.10. A10. Greasing
- 1.10.11. A11. Installation of exterior parts (Hydraulic winch specification)
- 1.10.12. A12. Bleeding air from hydraulic circuit (Hydraulic winch specification)
- 1.11. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 1.11.1. M1. Inspection and adjustment of operators cab
- 1.11.2. M2. Inspection of safety devices
- 1.11.3. M3. Replacement of return filter (Replacement of standard filter > special flushing parts)
- 1.11.4. M4. Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders
- 1.11.5. M5. Replacement of return filter (Replacement of special flushing parts >standard filter)
- 1.12. FIELD ASSEMBLY INSPECTION REPORT