Description
-
Model List:
- D375A-5 Galeo Bull Dozer
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 7. STYLE FOR TRANSPORTATION
- 8. TOOLS LIST FOR FIELD ASSEMBLY
- 9. TIGHTENING TORQUE
- 10. COATING MATERIALS
- 11. ASSEMBLY PROCEDURE
- 11.1. A1 INSTALLATION OF UNDERCARRIAGE
- 11.2. A2 INSTALLING TRACK SHOES
- 11.3. A3 CHARGING RECOIL CHAMBER AND PIVOT CHAMBER WITH OIL
- 11.4. A4 INSTALLATION OF TILT HOSE AND TRUNNION
- 11.5. A5 ASSEMBLY OF BLADE ASSEMBLY
- 11.6. A6 CHECKING OF ARM JOINT CLEARANCE
- 11.7. A7 INSTALLATION OF BLADE
- 11.8. A8 CHECKING OF BLADE CYLINDER CAP CLEARANCE
- 11.9. A9 CHECKING INSTALLATION OF DUAL TILT CYLINDER
- 11.10. A10 CHECKING OPERATION OF DUAL TILT MECHANISM
- 11.11. A11 INSTALLING RIPPER
- 11.12. A12 INSTALLATION OF OPERATORS CAB
- 11.13. A13 INSTALLATION OF ROPS
- 11.14. A14 CHECK TRACK TENSION
- 11.15. A15 CHECK FUEL, COOLANT AND LUBRICANTS
- 11.16. A16 LUBRICATING
- 11.17. A17 BLEEDING AIR FROM HYDRAULIC CYLINDERS
- 12. CHECK AFTER MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 12.1. M1 CHECK AND ADJUSTMENT OF OPERATORS CAB
- 12.2. M2 MEASURING ENGINE SPEED
- 12.3. M3 ADJUST CONTROL LOGIC TO SPECIFICATION
- 12.4. M4 ERROR CODE
- 13. APPENDIX 1. INSTALLATION OF SPILL GUARDS TO UBLADE
- 14. APPENDIX 2. PROCEDURE FOR INSTALLING ADDITIONAL LAMPS
- 14.1. CONTENTS OF MODIFICATION
- 14.1.1. ARRANGEMENT DRAWING OF ALL LAMPS OF MACHINE
- 14.1.2. LAMPS THAT CAN BE ADDED TO MACHINE OF EACH SPECIFICATION
- 14.1.3. PROCEDURE FOR MODIFICATION OF EACH SECTION
- 14.2. ELECTRIC CIRCUIT DIAGRAM
- 14.3. INTRODUCTION OF LIGHT
- 15. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.